Questions and Answers.pdf
PDF 77 KB Posted
- Attached to
- Construct Base Sidewalks Federal contract opportunity
- Solicitation number
- W50S8Q-23-R-0003
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Attachment 2 - 10A - Drawing 1 - Sidewalk Detail.pdf | ||
| Attachment 3 - Material Submittals WAAR202102_BLANK.xlsx | XLSX spreadsheet | |
| W50S8Q-23-R-0003 Construct Base Side Walks.pdf | ||
| Attachment 2 - 10E - Drawing 4 - culvert Bldg.144.pdf | ||
| Attachment 5 - DBIDs -Base Entry Request.pdf | ||
| Attachment 1 - SOW WAAR202102.docx | DOCX document | |
| Attachment 2 - 10B - Drawing 2 - New Sidewalk Location.pdf | ||
| Attachment 2 - 10D - Drawing 3 - Details 1 and 2.pdf | ||
| Attachment 4 - RFI Format.docx | DOCX document | |
| Attachment 2 - 10F - 178th CES Specifications.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) Does OHANG Require a signed engineer design for ADA ramps or do we build to given design (Ref Drawing 3 Detail 2‐Sidewalk Access ramps)
A1.) Build to given design (Drawing #3 Detail #2)
2) Is contractor responsible for security fence opening/moving jersey barrier and terminations for opening IOT install 50’ NEW SIDEWALK located outside of BLDG 144 (Ref: Attachment 2‐
10E‐Drawing 4‐culvert Bldg.144)
A2.) The Green marks on Drawing #4 only represent customer walking path. There are no sidewalks to be put in. The Contractor shall install a culvert, dirt and grass seed as indicated in the SOW and drawings. (SEE Drawing #4)
3) What size of re‐bar is required? (Ref: Drawing 1‐Sidewalk Detail)
A3.) Per note 14 it shall be 4”x4” wire mesh 10 gauge.
4) Can fiberglass rebar be substituted for this project?
A4.) No
5) Is there a predetermined laydown area for equipment storage?
A5.) yes, a laydown will be provided to winning contractor.
6) Attachment #2, Spec Section 02 521‐4, Sec. 3.4 B Sidewalk Construction calls for 4” thick in walk areas. In SOW sec. 3.2.16 mentions 6” thick walk. Please confirm what the walk thickness is to be.
A6.) The concrete sidewalk shall be 6” Thick minimum.
7) In the SOW sec. 3.2.14 mentions to seal concrete with slip resistant seal. Is this referring to the curing compound in attachment #2 spec sec.03 301‐4, sec. C‐1.
A7.) No, slip resistant seal needed because of broom finish.
8) Please confirm size of new culvert pipe under sidewalk between building 118 and 156.
A8.) 12” Culvert polyethylene ASTM n12 dual wall pipe.
9) Drawing 1‐Sidewalk Detail #14 shows 4x4 W‐1 mesh. The SOW does not mention wire mesh.
A.9) yes, wire mesh is to be installed in sidewalks. (Also see answer # 3.)