Attachment 3 - Material Submittals WAAR202102_BLANK.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Construct Base Sidewalks Federal contract opportunity
- Solicitation number
- W50S8Q-23-R-0003
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Amendment 0001.pdf | ||
| Attachment 2 - 10A - Drawing 1 - Sidewalk Detail.pdf | ||
| W50S8Q-23-R-0003 Construct Base Side Walks.pdf | ||
| Attachment 2 - 10E - Drawing 4 - culvert Bldg.144.pdf | ||
| Attachment 5 - DBIDs -Base Entry Request.pdf | ||
| Attachment 1 - SOW WAAR202102.docx | DOCX document | |
| Attachment 2 - 10B - Drawing 2 - New Sidewalk Location.pdf | ||
| Attachment 2 - 10D - Drawing 3 - Details 1 and 2.pdf | ||
| Attachment 4 - RFI Format.docx | DOCX document | |
| Attachment 2 - 10F - 178th CES Specifications.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF 3000
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||||||
| ( Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||||||
| WAAR202102 | 0Base Construct Sidwalks | ||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | |||||||||||||||
| NO. OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | MSD SHEET | OPERATING INSTRUCTIONS |
SUBMITTAL
REQUIRED DATES DUE
BY__10__
DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 1 | Progress Schedule | |||||
| 2 | Progress Reports | |||||
| 3 | Site Safety Plan | |||||
| 5 | Concrete Mix Design | |||||
| Concrete Reinforcement | ||||||
| 6 | Concrete Testing | |||||
| 7 | Base Materials | |||||
| 9 | Compaction Testing | |||||
| 11 | Treated Lumber | |||||
| 12 | Fasteners | |||||
| 13 | Culvert Pipe | |||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 |
File details come from the government source that posted it. Updated .