This document is a Questions and Answers file for Solicitation W50S8P-25-B-A001 for Building 2000 Secure Area Upgrades at Rickenbacker Air National Guard Base. The solicitation seeks a single firm fixed-price contract for modifications and mitigations to establish a secure facility in Room 240, with a construction duration of 180 calendar days. The project is a competitive Small Business Set-aside with a total value between $250,000 and $500,000, targeting contractors in the NAICS code 237310 with an average annual revenue of $45 million or less.
The Q&A document addresses technical clarifications regarding submission requirements, sound masking, acoustic testing, ductwork specifications, and security considerations. Key responses include confirming mail and courier delivery are authorized, correcting Contract Line Item Number (CLIN) discrepancies, clarifying post-award material submittals, and specifying Sound Group 4 standards for acoustic testing. The government indicates that testing data will be outlined in ICD-705, NSA 94-106, and IEEE 299 standards, and that a Construction Security Plan will be provided prior to the pre-construction meeting. The bid opening is scheduled for 31-Jul-2025 at 1:00 PM EDT, with interested offerors required to be registered in SAM.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Sign In Sheet.pdf | ||
| 1419 Abstract of Offers W50S8P-25-B-A001.pdf | ||
| SOW NLZG242008.pdf | ||
| Pre-Bid Conference Attendance List.pdf | ||
| conformed copy - W50S8P25BA0010001.pdf | ||
| _Solicitation Amendment W50S8P25BA0010001 SF 30.pdf | ||
| Site Visit Minutes.pdf | ||
| CUI_2000 Secure Upgrades Plans.pdf | ||
| SOW for NLZG242008.pdf | ||
| Solicitation - W50S8P25BA001.pdf | ||
| SFS Form 3_EAL Request.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Responses to Solicitation W50S8P-25-B-A001
Bldg 2000 Secure Area Upgrades
Q.1 Is hand delivery a requirement, or can o erors mail in their quotes? If they must be hand carried, can o erors use a courier service?
R.1 Mail and courier services are authorized. Clarification made in Section 00 21 00 Instructions Paragraph 5
Q.2 SOW 1.02 Bid Schedule – Bids shall be submitted with the prices broken out in two contract line numbers. (CLIN); however, there is only one then subsequently listed in the SOW and only one in Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule. Please confirm the reference to “two” is incorrect and there is only “one” CLIN.
R.2 Corrected in SOW to “one” CLIN, Section 00 21 00 – Instructions of the solicitation will take precedent over any other similar discrepancies.
Q.3 SOW 1.04 Submittals A. states “Quote must contain an itemized list for labor, parts, materials, equipment rental and any other incidental expenses.” To what quote does this apply as this is a bid with one CLIN pricing.
R.3 Paragraph removed.
Q.4 SOW 1.04 Submittals C. states “Contractor shall include with their proposal what GREEN Procurement (Re-cycled-Bio Based Content items which they intend to use on the contract (if applicable)…. As this is an IFB, please clarify the intent of this sub paragraph requirement in the SOW.
R.4 Clarified for post award material submittals including materials subject to FAR 52.223- 1 Reporting of Biobased Products Under Service and Construction Contracts
Q.5 SOW 1.05 Work to be Accomplished B. 3. Performance-based contractors shall provide shop drawings to identify sound masking for utility and duct penetrations to meet ICD-705 Requirements for STC 50. What are the engineering qualifications required for shop drawings and their acceptance?
R.5 Per the CSP - Construction and design of SCIFs should be performed by U.S.
companies using U.S. citizens to reduce risk, but may be performed by U.S. companies using U.S. persons (an individual who has been lawfully admitted for permanent residence as defined in 8 U.S.C. § 1101(a)(20) or who is a protected individual as defined by Title 8 U.S.C. § 1324b (a)(3)). The AO shall ensure mitigations are implemented when using non- U.S. citizens. These mitigations shall be documented in the CSP
Q.6 SOW 1.05 Work to be Accomplished B. 3. Contractors are required to use a 3rd Party to perform ASTM E90 Testing for STC 50 Standards and provide a report for the entire room.
Please clarify the intent of this requirement. For the report, what is the anticipated format and acceptance standard? Which Sound Group rating applies, Sound Group 3 or Sound Group 4?
R.6 Sound Group 4
Q.7 SOW 1.05 Word to be Accomplished has various references (See Note 3). Please advise if Note 3 is referring to 1.05, paragraph B, subparagraph 3 as there are various Note 3s on the drawings.
R.7 Note references corrected and correspond to general notes found in referenced drawings.
Q.8 M-102. Please provide additional information/detail on the section annotated as “Acoustically line, Thru-Wall” for the ductwork.
R.8 Duct is required to have acoustic lining su icient to meet Sound Group 4 standards.
Q.9 SOW Note 2. Windows and A-101 Note 3 Window Infill – Would the Government consider building a shaft wall (detail below) and applying a window film or window blind in lieu of removing the window and matching the exterior CMU.
R.9 The Government does not intend to change the design at this time.
Q.10 Drawing H-8 Mechanical. Per the drawing, a 40/40 duct transitions the space and the ducts are treated. Would the Government consider moving the duct to run down the corridor/hallway to avoid having a feature transition in and out of the secure space, which is generally avoided under ICD 705?
R.10 The Government does not intend to change the design at this time.
Q.11 Has there been an approved Construction Security Plan issued? And will the Contractor be able to have a draft copy only to the items that pertain to physical construction?
R.11 Not currently. One will be provided prior to the Pre-construction meeting.
Q.12 What is the radio frequency range that the new space will be tested to? (Ex. from
30MHZ-6GHZ)
R.12 Testing data is outlined in ICD-705, NSA 94-106, and IEEE 299.
Q.13 What is the db range the walls will be required to meet? (Ex. Shielding to meet a minimum 40db of attenuation)
R.13 Testing data is outlined in ICD-705, NSA 94-106, and IEEE 299.
Q.14 What will the radio frequency requirement for the incoming door?
R.14 Testing data is outlined in ICD-705, NSA 94-106, and IEEE 299.