CUI_2000 Secure Upgrades Plans.pdf
PDF 8 MB Posted
- Attached to
- Bldg 2000 Secure Area Upgrades Federal contract opportunity
- Solicitation number
- W50S8P25BA001
- Issued by
- Department of the Army National Guard
About this file
These architectural design plans depict detailed specifications for secure area upgrades at Building 2000 in the Rickenbacker Air National Guard Base in Columbus, Ohio. The plans include multiple technical drawings showing floor plans, demolition requirements, electrical and mechanical layouts, and construction details for Room 240, which will be transformed into a secure facility. Key technical specifications include:
Architectural modifications involve removing existing windows, replacing them with CMU walls, installing double gypsum wallboard walls with sound attenuation, replacing acoustical ceiling tiles, and implementing specialized wall construction to achieve Sound Transmission Class (STC) 50 rating. Electrical and mechanical requirements include surface-mounted electrical outlets and data ports, ductwork penetrations with security bars and viewports, and strict regulations around wall penetrations. The design follows UFC 4-010-05 security standards, emphasizing controlled access, RF shielding, and comprehensive security measures for the 775-square-foot space. All work is designed to be completed within 180 calendar days after the Notice to Proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Sign In Sheet.pdf | ||
| 1419 Abstract of Offers W50S8P-25-B-A001.pdf | ||
| SOW NLZG242008.pdf | ||
| Pre-Bid Conference Attendance List.pdf | ||
| conformed copy - W50S8P25BA0010001.pdf | ||
| _Solicitation Amendment W50S8P25BA0010001 SF 30.pdf | ||
| Site Visit Minutes.pdf | ||
| Questions and Answers.pdf | ||
| SOW for NLZG242008.pdf | ||
| SFS Form 3_EAL Request.pdf | ||
| Solicitation - W50S8P25BA001.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
C T
N
O
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
S
T
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S
T
A
I R
E F
U E
L I N
G
W
I N
G
R I C
K E
N B
A C
K E
R
A
A T
I O
N A
L
G
U A
D
B
S
E
M
I N
U T
E M
W
Y
L U
M B
U S
O
H
A N
S I
D
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
O
H I O
N L Z
G
B l d g
S
E C
U R
E
A
R E
A
U
P G
R A
D E
S
B U
I L D
I N
G
A
W
I N
E B
R E
N N
E R
S
P
R I C
E
S
P
R I C
E
A
W
I N
E B
R E
N N
E R
F L O
P
L A
N
A
R C
H I T
E C
T U
R A
L
A-101
A
T
I O
N A
L
G
U A
R D
SCALE: 1/2" = 1'-0 '
ARCHITECTURAL FLOOR PLAN
B1
PLAN
NORTH
1. VERIFY EXISTING CONDITIONS. COORDINATE THE EXTENT OF DEMOLITION
WORK AND EXISTING WORK TO REMAIN, WITH NEW WORK.
2. EXISTING FLOOR PLANS ARE BASED ON COPIES OF ARCHIVE DRAWINGS
PROVIDED BY THE GOVERNMENT. ACTUAL EXISTING WALL LOCATION/
ASSEMBLY MAY VARY. REPORT DISCREPANCIES, CONFLICTS OR
UNEXPECTED CONDITIONS TO THE CONTRACTING OFFICER.
3. REPAIR/ PATCH VISIBLE OPENINGS IN WALLS, PARTITIONS, FLOORS AND
CEILINGS WHERE DEMOLITION OCCURS. MATCH EXISTING ADJACENT
SURFACE FINISHES.
4. COORDINATE WITH CONTRACTING OFFICER ALL EQUIPMENT TO BE
SALVAGED.
5. ALL SHUTDOWN OF MECHANICALS, SPRINKLERS, FIRE ALARM AND/ OR
ELECTRICAL SYSTEMS SHALL BE COORDINATED WITH THE COR AND MAY BE
REQUIRED TO OCCUR DURING OR AFTER BUSINESS HOURS.
6. IN-SERVICE EQUIPMENT SHALL BE PROTECTED FROM CONSTRUCTION
ACTIVITIES AT ALL TIMES.
7. MAINTAIN AN UNOBSTRUCTED EXIT PATH TO THE PRIMARY EXITS FOR THE
DURATION OF CONSTRUCTION.
8. WORK AREA SHALL BE KEPT CLEAN OF DEBRIS AND DUST AT THE END OF
EACH WORK DAY.
9. PER REGULATIONS, CAMERAS, PHONES OR ANY OTHER TRANSMITTING AND
RECEIVING ELECTRONICS WILL NOT BE PERMITTED WITHIN THE WORK
AREAS AND ADJACENT OFFICES AND HALLWAY.
10. ALL WORK WILL COMPLY WITH UFC 4-010-05 (26 MAY 2023)
GENERAL ARCHITECTURAL NOTES
ARCHITECTURAL KEYNOTES
1. PREPARE WALLS BY PATCHING HOLES/PENETRATIONS TO MATCH ADJACENT
SURFACE AND APPLY FINISH PER FINISH SCHEDULE A-104 FOR ALL WALLS IN
HATCHED AREA. WALL FINISH WILL SPAN FROM FINISHED FLOOR TO ROOF
DECK. REFER TO UFC 4-010-05.
2. REMOVE AND REPLACE ACOUSTICAL CEILING TILE, EDGE PROFILE AND GRID
SIZE- SQUARE
". TILE DIMENSIONS 24" X 48" X
" , WHITE, EXPOSED TEE
SYSTEM, WHITE. REFER TO SHEET A-103.
3. WINDOWS TO BE REMOVED AND REPLACED WITH CMU IN KIND TO REST OF
CMU. FURRING GWB FINISH ON WALL TO MATCH SURRONDING FURRING.
4. INSTALL NEW WALL ACCORDING TO DETAILS ON A-102. DOUBLE WALL GWB
ON BOTH SIDES.
Continuous acoustic sealant in void - both sides of partition
Scheduled wall Base (both sides of partition)
3 12" (89mm) sound attenuation material, fastened to prevent sliding down and leaving void at the top
8" Gypsum Wall Board (GWB) - sound group 4 requires additional layer of 58" GWB with foil backing or layer of approved ultra radiant R Foil
Entire wall assembly shall be finished and painted from true floor to true ceiling
Metal angle moldings and steel support grid systems
Acoustical ceiling
Fire safe non-shrink grout, or acoustic sealant in all voids above track (note 2)
- both sides of partition
Bottom of Deck
Structural floor Finished floor
16 gauge continuous track (top & bottom) w/ anchors at 32" o.c. maximum) - bed in continuous bead of acoustical sealant
Two layers of 58" Gypsum Wall Board (GWB) mounted on 3-5/8" 16 gauge metal framing or 2x4 studs at 16" o.c. For the second layer use GWB with foil backing or layer of approved ultra radiant R Foil
Scheduled wall finish to be continuous above false ceiling and below raised floor
Wall A - Suggested Standard Acoustic Wall Construction for STC 50
Controlled Side Uncontrolled Side
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
S
T
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S
T
A
F
U E
L I N
G
W
I N
G
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
M
I N
U T
E M
L U
M B
U S
O
H
A N
S I
D
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
O
H I O
N L Z
G
B l d g
S
E C
U R
E
A
R E
A
U
P G
R A
D E
S
B U
I L D
I N
G
A
W
I N
E B
R E
N N
E R
S
P
R I C
E
S
P
R I C
E
A
W
I N
E B
R E
N N
E R
F L O
A
N
A
R C
H I T
E C
T U
R A
L
A-102
A
T
I O
N A
L
G
U A
R D
SCALE: 1/2" = 1'-0 '
Standard Acoustic Wall Construction
B1
PLAN
NORTH
1. VERIFY EXISTING CONDITIONS. COORDINATE THE EXTENT OF DEMOLITION
WORK AND EXISTING WORK TO REMAIN, WITH NEW WORK.
2. EXISTING FLOOR PLANS ARE BASED ON COPIES OF ARCHIVE DRAWINGS
PROVIDED BY THE GOVERNMENT. ACTUAL EXISTING WALL LOCATION/
ASSEMBLY MAY VARY. REPORT DISCREPANCIES, CONFLICTS OR
UNEXPECTED CONDITIONS TO THE CONTRACTING OFFICER.
3. REPAIR/ PATCH VISIBLE OPENINGS IN WALLS, PARTITIONS, FLOORS AND
CEILINGS WHERE DEMOLITION OCCURS. MATCH EXISTING ADJACENT
SURFACE FINISHES.
4. COORDINATE WITH CONTRACTING OFFICER ALL EQUIPMENT TO BE
SALVAGED.
5. ALL SHUTDOWN OF MECHANICALS, SPRINKLERS, FIRE ALARM AND/ OR
ELECTRICAL SYSTEMS SHALL BE COORDINATED WITH THE COR AND MAY BE
REQUIRED TO OCCUR DURING OR AFTER BUSINESS HOURS.
6. IN-SERVICE EQUIPMENT SHALL BE PROTECTED FROM CONSTRUCTION
ACTIVITIES AT ALL TIMES.
7. MAINTAIN AN UNOBSTRUCTED EXIT PATH TO THE PRIMARY EXITS FOR THE
DURATION OF CONSTRUCTION.
8. WORK AREA SHALL BE KEPT CLEAN OF DEBRIS AND DUST AT THE END OF
EACH WORK DAY.
9. PER REGULATIONS, CAMERAS, PHONES OR ANY OTHER TRANSMITTING AND
RECEIVING ELECTRONICS WILL NOT BE PERMITTED WITHIN THE WORK
AREAS AND ADJACENT OFFICES AND HALLWAY.
10. ALL WORK WILL COMPLY WITH UFC 4-010-05 (26 MAY 2023)
GENERAL ARCHITECTURAL NOTES
ARCHITECTURAL KEYNOTES
1. CTTA REQUIRED COUNTERMEATURES (FOIL BACKED GWB OR LAYER OF
APPROVED ULTRA RADIANT R-FOIL) SHALL BE INSTALLED IAW BEST
PRACTICES FOR ARCHITECTURAL RAIDO FREQUENCY (RF) SHIELDING. FOIL
SHALL BE LOCATED BETWEEN THE TWO LAYERS OF GWB.
2. PARTITION SHALL BE SEALED CONTINUOUSLY WITH ACOUSTICAL SEALANT
WHENEVER IT ABUTS ANOTHER ELEMENT (E.G. WALL, COLUMN, MULLION,
ETC.)
3. ANY ELECTRICAL OR COMMUNICATIONS OUTLETS REQUIRED ON THE
PERIMETER WALL SHALL BE SURFACE MOUNTED.
OFFICE
OFFICE
OFFICE
2'-0" X 4'-0" ACOUSTICAL CEILING TILE
2'-0" X 4'-0" LED LIGHT FIXTURE
2'-0" X 4'-0" LED LIGHT FIXTURE W/BATTERY
BACK-UP
2'-0" X 2'-0" LED LIGHT FIXTURE W/BATTERY
BACK-UP
1'-0" X 4'-0" LED PENDANT LIGHT FIXTURE
1'-0" X 4'-0" LED PENDANT LIGHT FIXTURE
W/BATTERY BACK-UP
2'-0" X 2'-0" MECHANICAL DIFFUSER
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
T
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S
T
A
F
U E
L I N
G
W
I N
G
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
M
I N
U T
E M
L U
M B
U S
O
H
A N
S I
D
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
O
H I O
N L Z
G
B l d g
S
E C
U R
E
A
R E
A
U
P G
R A
D E
S
B U
I L D
I N
G
A
W
I N
E B
R E
N N
E R
S
P
R I C
E
S
P
R I C
E
A
W
I N
E B
R E
N N
E R
F L O
A
N
A
R C
H I T
E C
T U
R A
L
A-103
A
T
I O
N A
L
G
U A
R D
SCALE: 1/2" = 1'-0 '
Ceiling Grid Details
B1
PLAN
NORTH
1. VERIFY EXISTING CONDITIONS. COORDINATE THE EXTENT OF DEMOLITION
WORK AND EXISTING WORK TO REMAIN, WITH NEW WORK.
2. EXISTING FLOOR PLANS ARE BASED ON COPIES OF ARCHIVE DRAWINGS
PROVIDED BY THE GOVERNMENT. ACTUAL EXISTING WALL LOCATION/
ASSEMBLY MAY VARY. REPORT DISCREPANCIES, CONFLICTS OR
UNEXPECTED CONDITIONS TO THE CONTRACTING OFFICER.
3. REPAIR/ PATCH VISIBLE OPENINGS IN WALLS, PARTITIONS, FLOORS AND
CEILINGS WHERE DEMOLITION OCCURS. MATCH EXISTING ADJACENT
SURFACE FINISHES.
4. COORDINATE WITH CONTRACTING OFFICER ALL EQUIPMENT TO BE
SALVAGED.
5. ALL SHUTDOWN OF MECHANICALS, SPRINKLERS, FIRE ALARM AND/ OR
ELECTRICAL SYSTEMS SHALL BE COORDINATED WITH THE COR AND MAY BE
REQUIRED TO OCCUR DURING OR AFTER BUSINESS HOURS.
6. IN-SERVICE EQUIPMENT SHALL BE PROTECTED FROM CONSTRUCTION
ACTIVITIES AT ALL TIMES.
7. MAINTAIN AN UNOBSTRUCTED EXIT PATH TO THE PRIMARY EXITS FOR THE
DURATION OF CONSTRUCTION.
8. WORK AREA SHALL BE KEPT CLEAN OF DEBRIS AND DUST AT THE END OF
EACH WORK DAY.
9. PER REGULATIONS, CAMERAS, PHONES OR ANY OTHER TRANSMITTING AND
RECEIVING ELECTRONICS WILL NOT BE PERMITTED WITHIN THE WORK
AREAS AND ADJACENT OFFICES AND HALLWAY.
10. ALL WORK WILL COMPLY WITH UFC 4-010-05 (26 MAY 2023)
GENERAL ARCHITECTURAL NOTES
ARCHITECTURAL KEYNOTES.
1. REMOVE AND REPLACE IN KIND 2' X 4' ACOUSTICAL CEILING TILE AND GRID.
S
E
S
C H
E D
U L E
SEE SCHEDULE
0'-2"
S E
E
S
C H
E D
U L E
SEE SCHEDULE
DOOR SCHEDULE
DOOR FRAME
HARDWAR
E GROUP
REMARKS
MARK WIDTH HEIGHT WIDTH TYPE MATERIAL TYPE MATERIAL
240 3'-0" 7'-0" 1-3/4" F H.M. 1 H.M. 1
DOOR HARDWARE SCHEDULE (BUILDERS MANUFACTURES HARDWARE ASSOCIATION ANSI/BHMA A156)
HARDWARE GROUP 1 (DOOR 240)
3 EA, 4 1/2" x 4 1/2" HINGE A8111 BY 652 BY NRP (NON-REMOVABLE PIN)
1 EA DOOR CLOSURE C02011 WITH OPTION PT4C
1 EA HIGH SECURITY PEDESTRIAN
DOOR DEADBOLT DEVICE
FEDERAL SPECIFICATION FF-L-2890C TYPE 1- PDPL-ANSI/BHMA A156.2 GRADE 1 F44 COMPLETE WITH STAND-ALONE ACCESS CONTROL
CAPABILITY - COMBINATION PRE-ASSEMBLED LOCK. COMPLETE WITH FEDERAL SPECIFICATION FF-L-2740 COMBINATION LOCK.
1 EA KICK PLATE J102 BY 630 ON PUSH SIDE OF DOOR
FINISH SCHEDULE
SPACE FLOOR
WALLS (BASED ON PLAN NORTH)
CEILING
FINISH
REMARKS
ROOM
ROOM
NAME
MATERIAL
MATERIAL
BASE
NORTH EAST SOUTH WEST
240 EXISTING EXISTING P-1 P-1 P-1 P-1
ACT SHERWIN WILLIAMS PAINT TO MATCH EXISTING PAINT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
S
T
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S
T
A
F
U E
L I N
G
W
I N
G
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
M
I N
U T
E M
L U
M B
U S
O
H
A N
S I
D
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
O
H I O
N L Z
G
B l d g
S
E C
U R
E
A
R E
A
U
P G
R A
D E
S
B U
I L D
I N
G
A
W
I N
E B
R E
N N
E R
S
P
R I C
E
S
P
R I C
E
A
W
I N
E B
R E
N N
E R
F L O
A
N
A
R C
H I T
E C
T U
R A
L
A-104
A
T
I O
N A
L
G
U A
R D
SCALE: 3/4" = 1'-0 '
DOOR DETAILS
B1
PLAN
NORTH
1. VERIFY EXISTING CONDITIONS. COORDINATE THE EXTENT OF DEMOLITION
WORK AND EXISTING WORK TO REMAIN, WITH NEW WORK.
2. EXISTING FLOOR PLANS ARE BASED ON COPIES OF ARCHIVE DRAWINGS
PROVIDED BY THE GOVERNMENT. ACTUAL EXISTING WALL LOCATION/
ASSEMBLY MAY VARY. REPORT DISCREPANCIES, CONFLICTS OR
UNEXPECTED CONDITIONS TO THE CONTRACTING OFFICER.
3. REPAIR/ PATCH VISIBLE OPENINGS IN WALLS, PARTITIONS, FLOORS AND
CEILINGS WHERE DEMOLITION OCCURS. MATCH EXISTING ADJACENT
SURFACE FINISHES.
4. COORDINATE WITH CONTRACTING OFFICER ALL EQUIPMENT TO BE
SALVAGED.
5. ALL SHUTDOWN OF MECHANICALS, SPRINKLERS, FIRE ALARM AND/ OR
ELECTRICAL SYSTEMS SHALL BE COORDINATED WITH THE COR AND MAY BE
REQUIRED TO OCCUR DURING OR AFTER BUSINESS HOURS.
6. IN-SERVICE EQUIPMENT SHALL BE PROTECTED FROM CONSTRUCTION
ACTIVITIES AT ALL TIMES.
7. MAINTAIN AN UNOBSTRUCTED EXIT PATH TO THE PRIMARY EXITS FOR THE
DURATION OF CONSTRUCTION.
8. WORK AREA SHALL BE KEPT CLEAN OF DEBRIS AND DUST AT THE END OF
EACH WORK DAY.
9. PER REGULATIONS, CAMERAS, PHONES OR ANY OTHER TRANSMITTING AND
RECEIVING ELECTRONICS WILL NOT BE PERMITTED WITHIN THE WORK
AREAS AND ADJACENT OFFICES AND HALLWAY.
10. ALL WORK WILL COMPLY WITH UFC 4-010-05 (26 MAY 2023)
GENERAL ARCHITECTURAL NOTES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
T
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S
T
A
F
U E
L I N
G
W
I N
G
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
M
I N
U T
E M
L U
M B
U S
O
H
A N
S I
D
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
O
H I O
N L Z
G
B l d g
S
E C
U R
E
A
R E
A
U
P G
R A
D E
S
B U
I L D
I N
G
A
W
I N
E B
R E
N N
E R
S
P
R I C
E
S
P
R I C
E
A
W
I N
E B
R E
N N
E R
F L O
A
N
D
E M
O L I T
I O
N
D-101
A
T
I O
N A
L
G
U A
R D
DEMOLITION PLAN
B1
PLAN
NORTH
1. VERIFY EXISTING CONDITIONS. COORDINATE THE EXTENT OF DEMOLITION
WORK AND EXISTING WORK TO REMAIN, WITH NEW WORK.
2. EXISTING FLOOR PLANS ARE BASED ON COPIES OF ARCHIVE DRAWINGS
PROVIDED BY THE GOVERNMENT. ACTUAL EXISTING WALL LOCATION/
ASSEMBLY MAY VARY. REPORT DISCREPANCIES, CONFLICTS OR
UNEXPECTED CONDITIONS TO THE CONTRACTING OFFICER.
3. REPAIR/ PATCH VISIBLE OPENINGS IN WALLS, PARTITIONS, FLOORS AND
CEILINGS WHERE DEMOLITION OCCURS. MATCH EXISTING ADJACENT
SURFACE FINISHES.
4. COORDINATE WITH CONTRACTING OFFICER ALL EQUIPMENT TO BE
SALVAGED.
5. ALL SHUTDOWN OF MECHANICALS, SPRINKLERS, FIRE ALARM AND/ OR
ELECTRICAL SYSTEMS SHALL BE COORDINATED WITH THE COR AND MAY BE
REQUIRED TO OCCUR DURING OR AFTER BUSINESS HOURS.
6. IN-SERVICE EQUIPMENT SHALL BE PROTECTED FROM CONSTRUCTION
ACTIVITIES AT ALL TIMES.
7. MAINTAIN AN UNOBSTRUCTED EXIT PATH TO THE PRIMARY EXITS FOR THE
DURATION OF CONSTRUCTION.
8. WORK AREA SHALL BE KEPT CLEAN OF DEBRIS AND DUST AT THE END OF
EACH WORK DAY. PROTECT SURROUNDING AREA FROM DUST AND DEBRIS.
9. PER REGULATIONS, CAMERAS, PHONES OR ANY OTHER TRANSMITTING AND
RECEIVING ELECTRONICS WILL NOT BE PERMITTED WITHIN THE WORK
AREAS AND ADJACENT OFFICES AND HALLWAY.
10. STABILIZE AREA OF WORK.
11. ALL WORK WILL COMPLY WITH UFC 4-010-05 (26 MAY 2023)
GENERAL DEMOLITION NOTES
DEMOLITION KEYNOTES
1. DEMO GWB WALL.
2. REMOVE WINDOWS FOR INFILL.
3. DEMO ACOUSTICAL CEILING TILE AND GRID AS REQUIRED TO FACILITATE
NEW GWB WALL AND ABOVE CEILING WORK.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
T
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S
T
A
F
U E
L I N
G
W
I N
G
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
M
I N
U T
E M
L U
M B
U S
O
H
A N
S I
D
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
O
H I O
N L Z
G
B l d g
S
E C
U R
E
A
R E
A
U
P G
R A
D E
S
B U
I L D
I N
G
A
W
I N
E B
R E
N N
E R
S
P
R I C
E
S
P
R I C
E
A
W
I N
E B
R E
N N
E R
F L O
A
N
E
L E
C T
R I C
A L
E-101
A
T
I O
N A
L
G
U A
R D
SCALE: 1/2" = 1'-0 '
ARCHITECTURAL FLOOR PLAN
B1
PLAN
NORTH
1. VERIFY EXISTING CONDITIONS. COORDINATE THE EXTENT OF ELECTRICAL
WORK AND EXISTING WORK TO REMAIN, WITH NEW WORK.
2. EXISTING FLOOR PLANS ARE BASED ON COPIES OF ARCHIVE DRAWINGS
PROVIDED BY THE GOVERNMENT. ACTUAL EXISTING WALL LOCATION/
ASSEMBLY MAY VARY. REPORT DISCREPANCIES, CONFLICTS OR
UNEXPECTED CONDITIONS TO THE CONTRACTING OFFICER.
3. NEW UTILITIES SHALL BE SURFACE MOUNTED ON BOTH THE CONTROLLED
SIDE OF THE ROOM AND THE UNCONTROLLED WALL OF ROOM 236 AND ALL
PENETRATIONS INTO THE CONTROLLED SIDE SHALL BE PROPERLY SEALED
TO STC 50 STANDARDS AND INCLUDE DIELECTRIC BREAKS AT THE POINT OF
PENETRATION.
1. COORDINATE WITH CONTRACTING OFFICER ALL EQUIPMENT TO BE
SALVAGED.
2. ALL SHUTDOWN OF MECHANICALS, SPRINKLERS, FIRE ALARM AND/ OR
ELECTRICAL SYSTEMS SHALL BE COORDINATED WITH THE COR AND MAY BE
REQUIRED TO OCCUR DURING OR AFTER BUSINESS HOURS.
3. IN-SERVICE EQUIPMENT SHALL BE PROTECTED FROM CONSTRUCTION
ACTIVITIES AT ALL TIMES.
4. MAINTAIN AN UNOBSTRUCTED EXIT PATH TO THE PRIMARY EXITS FOR THE
DURATION OF CONSTRUCTION.
5. WORK AREA SHALL BE KEPT CLEAN OF DEBRIS AND DUST AT THE END OF
EACH WORK DAY.
6. PER REGULATIONS, CAMERAS, PHONES OR ANY OTHER TRANSMITTING AND
RECEIVING ELECTRONICS WILL NOT BE PERMITTED WITHIN THE WORK
AREAS AND ADJACENT OFFICES AND HALLWAY.
7. ALL WORK WILL COMPLY WITH UFC 4-010-05 (26 MAY 2023)
GENERAL ELECTRICAL NOTES
ELECTRICAL KEYNOTES
1. ALL REINSTALLED ELECTRICAL OUTLETS AND DATA PORTS TO BE INSTALLED
ON EXTERIOR OF WALL IN CONDUIT SURFACE MOUNTED.
ELECTRICAL
OUTLET
DATA
CONNECTION
PORT
3 4 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
S
T
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S
T
A
F
U E
L I N
G
W
I N
G
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
M
I N
U T
E M
L U
M B
U S
O
H
A N
S I
D
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
O
H I O
N L Z
G
B l d g
S
E C
U R
E
A
R E
A
U
P G
R A
D E
S
B U
I L D
I N
G
A
W
I N
E B
R E
N N
E R
S
P
R I C
E
S
P
R I C
E
A
W
I N
E B
R E
N N
E R
F L O
A
N
M
E C
H A
N I C
A L
M-101
A
T
I O
N A
L
G
U A
R D
SCALE: 1/2" = 1'-0 '
ARCHITECTURAL FLOOR PLAN
B1
PLAN
NORTH
1. VERIFY EXISTING CONDITIONS. COORDINATE THE EXTENT OF DEMOLITION
WORK AND EXISTING WORK TO REMAIN, WITH NEW WORK.
2. EXISTING FLOOR PLANS ARE BASED ON COPIES OF ARCHIVE DRAWINGS
PROVIDED BY THE GOVERNMENT. ACTUAL EXISTING WALL LOCATION/
ASSEMBLY MAY VARY. REPORT DISCREPANCIES, CONFLICTS OR
UNEXPECTED CONDITIONS TO THE CONTRACTING OFFICER.
3. REPAIR/ PATCH VISIBLE OPENINGS IN WALLS, PARTITIONS, FLOORS AND
CEILINGS WHERE DEMOLITION OCCURS. MATCH EXISTING ADJACENT
SURFACE FINISHES.
4. COORDINATE WITH CONTRACTING OFFICER ALL EQUIPMENT TO BE
SALVAGED.
5. ALL SHUTDOWN OF MECHANICALS, SPRINKLERS, FIRE ALARM AND/ OR
ELECTRICAL SYSTEMS SHALL BE COORDINATED WITH THE COR AND MAY BE
REQUIRED TO OCCUR DURING OR AFTER BUSINESS HOURS.
6. IN-SERVICE EQUIPMENT SHALL BE PROTECTED FROM CONSTRUCTION
ACTIVITIES AT ALL TIMES.
7. MAINTAIN AN UNOBSTRUCTED EXIT PATH TO THE PRIMARY EXITS FOR THE
DURATION OF CONSTRUCTION.
8. WORK AREA SHALL BE KEPT CLEAN OF DEBRIS AND DUST AT THE END OF
EACH WORK DAY.
9. PER REGULATIONS, CAMERAS, PHONES OR ANY OTHER TRANSMITTING AND
RECEIVING ELECTRONICS WILL NOT BE PERMITTED WITHIN THE WORK
AREAS AND ADJACENT OFFICES AND HALLWAY.
10. ALL WORK WILL COMPLY WITH UFC 4-010-05 (26 MAY 2023)
GENERAL MECHANICAL NOTES
MECHANICAL KEYNOTES
1. 42"X42" DUCT WORK PENETRATION. PERMANENTLY AFFIXED BARS AS
REFERENCED IN UFC 4-010-05 PARA. 3-4.12 VENTS AND DUCTS. ADD
VIEWPORT AS SEEN ON M-102 DETAILS.
2. 10"X10" DUCT WORK PENETRATION. ADD VIEWPORT AS SEEN ON M-102
DETAILS.
3. 12"X12" DUCT WORK PENETRATION. ADD VIEWPORT AS SEEN ON M-102
DETAILS.
4. 42"X42" DUCT WORK PENETRATION. ADD VIEWPORT AS SEEN ON M-102
DETAILS.
5. 14"X14 DUCT WORK PENETRATION. ADD VIEWPORT AS SEEN ON M-102
DETAILS.
3"X2"X1/4" OR HEAVIER ANGLES
SNUG TO WALL OR FLOOR AND
SLEEVE ALL AROUND ( NOTE A)
CAP
OR
WALL
DUCT
MANBARS
(NOTE C)
S-TYPE SLIP
CONNECTOR (TYP.)
DUCT
NOTES:
A. SHOP WELD SLEEVE ASSEMBLY. ALL SHOP WELDS SHALL BE CONTINUOUS 1/8"
(MIN) THICK. WELDED ANGLES SHALL BE LOCATED OUT OF THE SPECIAL USE
BOUNDARY; BLOT, SCREW, RIVET, OR TACKWELD CONNECTIONS SHALL BE WITHIN
THE SPECIAL USE BOUNDARY; SEE ARCHITECTURE FOR SPECIAL USE BOUNDARY
LOCATIONS.
B.
PROVIDE MINIMUM 12"X12" ACCESS DOOR WITHIN SPECIAL USE BOUNDARY, SEE
ARCHITECTURE FOR SPECIAL USE BOUNDARY LOCATIONS. LOCATE DOOR ON
BOTTOM OF DUCT IF INSUFFICIENT DEPTH OF DUCT. INCREASE DUCT SIZE AS
REQUIRED TO ACCOMMODATE ACCESS DOOR.
C.
PROVIDE MANBARS IN SLEEVE.
14 GA OR HEAVIER SLEEVE
NONSECURE SIDE SECURE SIDE
FLEXIBLE NON-CONDUCTIVE
BREAK AT WALL
ACOUSTICALLY LINED, THRU-WALL DUCT
INSULATED ACCESS
HATCH (IN BOTTOM
0F DUCT) SEE NOTE B.
6" M
AX
6" MAX
CENTER OF FRAME
CENTER OF FRAME
FRAME AND SLEEVE
WELD BARS AND ANGLES AT ALL
INTERSECTIONS AND JOINTS.
1/2" DIA. STEEL
SECURITY BARS
NOTES:
A. USE IN SECURE WALL PENETRATIONS LARGER THAN 96 SQ. IN. OR
IF ONE DIMENSION EXCEEDS 6 IN.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
S
T
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S
T
A
F
U E
L I N
G
W
I N
G
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
M
I N
U T
E M
L U
M B
U S
O
H
A N
S I
D
R I C
K E
N B
A C
K E
R
A
T
I O
N A
L
G
U A
S
E
O
H I O
N L Z
G
B l d g
S
E C
U R
E
A
R E
A
U
P G
R A
D E
S
B U
I L D
I N
G
A
W
I N
E B
R E
N N
E R
S
P
R I C
E
S
P
R I C
E
A
W
I N
E B
R E
N N
E R
F L O
A
N
M
E C
H A
N I C
A L
M-102
A
T
I O
N A
L
G
U A
R D
SCALE: 1/2" = 1'-0 '
Duct Penetration Through Secure Wall Detail
B1
PLAN
NORTH
1. VERIFY EXISTING CONDITIONS. COORDINATE THE EXTENT OF DEMOLITION
WORK AND EXISTING WORK TO REMAIN, WITH NEW WORK.
2. EXISTING FLOOR PLANS ARE BASED ON COPIES OF ARCHIVE DRAWINGS
PROVIDED BY THE GOVERNMENT. ACTUAL EXISTING WALL LOCATION/
ASSEMBLY MAY VARY. REPORT DISCREPANCIES, CONFLICTS OR
UNEXPECTED CONDITIONS TO THE CONTRACTING OFFICER.
3. REPAIR/ PATCH VISIBLE OPENINGS IN WALLS, PARTITIONS, FLOORS AND
CEILINGS WHERE DEMOLITION OCCURS. MATCH EXISTING ADJACENT
SURFACE FINISHES.
4. COORDINATE WITH CONTRACTING OFFICER ALL EQUIPMENT TO BE
SALVAGED.
5. ALL SHUTDOWN OF MECHANICALS, SPRINKLERS, FIRE ALARM AND/ OR
ELECTRICAL SYSTEMS SHALL BE COORDINATED WITH THE COR AND MAY BE
REQUIRED TO OCCUR DURING OR AFTER BUSINESS HOURS.
6. IN-SERVICE EQUIPMENT SHALL BE PROTECTED FROM CONSTRUCTION
ACTIVITIES AT ALL TIMES.
7. MAINTAIN AN UNOBSTRUCTED EXIT PATH TO THE PRIMARY EXITS FOR THE
DURATION OF CONSTRUCTION.
8. WORK AREA SHALL BE KEPT CLEAN OF DEBRIS AND DUST AT THE END OF
EACH WORK DAY.
9. PER REGULATIONS, CAMERAS, PHONES OR ANY OTHER TRANSMITTING AND
RECEIVING ELECTRONICS WILL NOT BE PERMITTED WITHIN THE WORK
AREAS AND ADJACENT OFFICES AND HALLWAY.
10. ALL WORK WILL COMPLY WITH UFC 4-010-05 (26 MAY 2023)
GENERAL MECHANICAL NOTES
MECHANICAL KEYNOTES
1. Duct access port for inspection.
| NLZG242008B2000SECUREAREA_A-101.pdf |
| Sheets and Views |
| A-101 |
| CUI_2000 Secure Upgrades Plans.pdf |
| NLZG242008B2000SECUREAREA_A-102.pdf |
| Sheets and Views |
| A-102 |
| NLZG242008B2000SECUREAREA_A-103.pdf |
| Sheets and Views |
| A-103 |
| NLZG242008B2000SECUREAREA_A-104.pdf |
| Sheets and Views |
| A-104 |
| NLZG242008B2000SECUREAREA_D-101.pdf |
| Sheets and Views |
| D-101 |
| NLZG242008B2000SECUREAREA_E-101.pdf |
| Sheets and Views |
| E-101 |
| NLZG242008B2000SECUREAREA_M-101.pdf |
| Sheets and Views |
| M-101 |
| NLZG242008B2000SECUREAREA_M-102.pdf |
| Sheets and Views |
| M-102 |
| CUI_2000 Upgrades Plans.pdf |
| CUI 2000 Upgrades Plans |
| 2000 A5 |
| 2000 A19 |
| CUI 2000 Upgrades Plans |
| CUI 2000 Upgrades Plans |
| 2000 Upgrades Plans - Binder Set |
| H08.pdf |
| E14.pdf |
| E19.pdf |