B6 W50S8K23Q0001 RFI Log (cao 20230419).xlsx

XLSX spreadsheet 19 KB Posted

Attached to
LTUY222008 Basewide Safety Repairs
Solicitation number
W50S8K23Q0001
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Project: LTUY222008 Basewide Safety Repairs
Solicitation: W50S8K23Q0001
NumberRFIGovernment ResponseSOW Revision Needed (Y/N)
1Does govt. require any embedded metal treads on new steps as seen on other steps around base?NoN
2SOW Item 2 stays to install new 4” thick concrete stoop outside new door. Can existing asphalt pad (if sound) be acceptable as suitable base for new concrete?No, asphalt will need to be excavatedN
3For the interior ramp, is it to be installed directly on top of existing flooring (if any)?Building purpose changed after SOW written. Ramp no longer necessaryY - Will be included in amendment.
4Do you have any dwgs showing the existing electrical and circuits for Building 40 work?One showing outlets and fixtures, but not circuits. Will be sent as a separate file.N
5Is it anticipated that any ACM tiles, mastic or materials will be encountered when replacing subfloor in bldg. 36 hallway?This building had asbestos tile, but it was remediated in a 1996 renovation.N
6Is there any data on existing rubber sheet goods that are to be reset after subfloor replacement?Rubber flooring is Nora Norament Grano flooring color 4896 AmmoniteN
7Does the govt. know the mfg. of the existing light pole to be matched and/or are there any additional specifications available such as minimum lumens, etc?Light specs included as a separate file. Pole manufacturer information will be provided.N

Sheet2