A3 AF 66 Schedule of Material Submittals (for RFQ).xlsx
XLSX spreadsheet 36 KB Posted
- Attached to
- LTUY222008 Basewide Safety Repairs Federal contract opportunity
- Solicitation number
- W50S8K23Q0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S8K23Q00010002 Basewide Safety Amend 2.pdf | ||
| CLIN 0007 Bldg 280 Boiler Information.pdf | ||
| A2 SOW LTUY222008 Basewide Safety Repairs 20230421.pdf | ||
| W50S8K23Q00010001 Basewide Safety Amend 1.pdf | ||
| RFI 7 Street lights e1.pdf | ||
| RFI 7 LED Light Specs.pdf | ||
| B6 W50S8K23Q0001 RFI Log (cao 20230419).xlsx | XLSX spreadsheet | |
| RFI 7- Light Pole Information.pdf | ||
| RFI 7 Street lights e2.pdf | ||
| RFI 4 Diagram LTUY00040FP.pdf | ||
| W50S8K23Q0001 Basewide Safety Repairs.pdf | ||
| A2 SOW LTUY222008 Basewide Safety Repairs 20230313.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||
| LTUY222008 | Basewide Safety Repairs | W50S8K23Q0001 | ||||||
| TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||
| Notes for Submittal Dates |
1. Pre-Construction Meeting
2. As Required
| 3. No more than 10 business days after NTP | 4. NLT than 10 business days before site delivery | |
| 5. NLT than 10 business days before specific work element begins. | 6. NLT than 10 business days before commencement of work. |
7. NLT than 2 business before Pre-Final Inspection
8. No more than 5 business days after final inspection LINE NUMBER ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL NO. OF COPIES REQUIRED Last # ID#AAAAL-QiQ2U
MATTHEWS, JOHN E CIV USAF ANG 131 CES/CEP (2021-04-14 00:37:03)
Latest submittal # REQUIRED SUBMITTAL DATE ID#AAAAL-QiQ2Q
MATTHEWS, JOHN E CIV USAF ANG 131 CES/CEP (2021-04-14 00:37:03)
REQUIRED SUBMITTAL DATE DATE RECEIVED BY CONTRACTING
ID#AAAAL-QiQ2o
MATTHEWS, JOHN E CIV USAF ANG 131 CES/CEP (2021-04-14 00:37:03)
DATE RECEIVED BY CONTRACTING DATE RECEIVED BY CIVIL ENGINEERING
ID#AAAAL-QiQ2k
MATTHEWS, JOHN E CIV USAF ANG 131 CES/CEP (2021-04-14 00:37:03)
DATE RECEIVED BY CIVIL ENGINEERING DATE RETURNED TO CONTRACTING
ID#AAAAL-QiQ2c
MATTHEWS, JOHN E CIV USAF ANG 131 CES/CEP (2021-04-14 00:37:03)
DATE RETURNED TO CONTRACTING DATE CONTRACTOR NOTIFIED
ID#AAAAL-QiQ2g
MATTHEWS, JOHN E CIV USAF ANG 131 CES/CEP (2021-04-14 00:37:03)
| DATE CONTRACTOR NOTIFIED | STATUS CODE | REMARKS | |||||||||
| PRODUCT DATA | SHOP DRAWINGS | CERTIFICATE OF COMPLIANCE | SAMPLES | COLOR SELECTION | MANUFACTURER'S | ||||||
| RECOMMENDATIONS | MANUFACTURER'S QUALIFICATIONS | INSTALLER'S QUALIFICATIONS | PRODUCT TEST REPORTS | FIELD QUALITY-CONTROL | |||||||
| TEST REPORTS | OTHER SPECIFIED MATERIALS, | ||||||||||
| DATA, OR SCHEDULES | OPERATING AND MAINTENANCE | ||||||||||
| INSTRUCTIONS | MANUFACTURER'S WARRANTY | OTHER SPECIFIED MATERIALS, | |||||||||
| DATA, OR SCHEDULES | 0 | Approved - No Exceptions Taken | Approved as Noted | Revise and Resubmit | Disapproved | Cancelled | |||||
| Notes for Description & Copies columns. |
A. If exact match per SOW, sample not required.
B. If exact match per SOW, color selection not req'd SUBMITTAL NUMBER
| 1 | Bldg 1 Light Post | 1 | 1 | 5 | |
| 2 | Bldg 1 Light Fixture | 1 | 1 | 5 | |
| 3 | Bldg 1 Single line diagram for lights | 1 | 5 | ||
| 4 | CONCRETE FILL/REPAIR COMPOUNDS FOR TILE INSTALLATION | 1 | 5 | ||
| 5 | TILE ADHESIVE | 1 | 5 | ||
| 6 | Bldg 36 Column Mortar Mixture | 1 | 5 | ||
| 7 | Bldg 44 Stair Railing Materials and Cutout | 1 | 1 | 1 | 5 |
| 8 | Concrete Specifications for Bldg 44 Stairs | 1 | 5 | ||
| 9 | Bldg 40 Door | 1 | 1 | 1 | 5 |
| 10 | Bldg 40 Door Frame | 1 | 1 | 1 | 5 |
| 11 | Bldg 280 Fresh Air Intake Materials | 1 | 1 | 5 | |
| 12 | |||||
| 13 | |||||
| 14 | |||||
| 15 | |||||
| 16 | |||||
| 17 | |||||
| 18 | |||||
| 19 | |||||
| 20 | |||||
| 21 | |||||
| 22 | |||||
| 23 | |||||
| 24 | |||||
| 25 | |||||
| 26 | |||||
| 27 | |||||
| 28 | |||||
| 29 | |||||
| 30 |
page &P of
File details come from the government source that posted it. Updated .