Attach_08_ArmDrm_Submittal_Register_20240708.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Asphalt Paving: Mill & Overlay Airfield Pavement
- Solicitation number
- W50S8F-24-R-0002
- Issued by
-
Department of the Army National Guard
About this file
This document is an Attachment for a federal contract opportunity titled "Asphalt Paving: Mill & Overlay Airfield Pavement". The attachment is a Schedule of Material Submittals for the Mill & Overlay Airfield Pavements project, AQRC222011. It lists the various submittal items required from the contractor, such as safety plans, quality control plans, project schedules, material data sheets, paint and milling depth information, recycling slips, asphalt submittals, field test reports, and close-out documents. The due dates for these submittals range from prior to mobilization to prior to final payment.
The related federal contract opportunity is a Request for Quote (RFQ) for the Mill and Overlay of Airfield Asphalt Pavements at the 177th Fighter Wing in Egg Harbor Township, NJ. The work involves milling 2 inches and overlaying 2 inches of asphalt pavement across approximately 35,000 square feet, split between two separate locations on the active airfield. This is a 100% small business set-aside contract with a magnitude of construction between $100,000 and $250,000. Bid guarantee, payment, and performance bonds are required for offers above $150,000. The contract will be awarded in accordance with FAR Parts 13 and 36.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | Mill & Overlay Airfield Pavements | AQRC222011 | AQRC222011 | ||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | Contractor | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||
| NUMBER OF COPIES REQUIRED | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||||||||||
| SUBMITTAL NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MFGR'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATION INSTRUCTION | PERFORMANCE TEST REPORT | OTHER | SUBMISSION DATE | DATE CONTRACTOR NOTIFIED | ||||||||
| APPROVED | DISAPPROVED | ||||||||||||||||||||
| 1 | Job Specific Safety Plan | x | Prior to Mobilizaton | 1 | |||||||||||||||||
| 2 | Job Specific Quality Control Plan | x | Prior to Mobilizaton | 2 | |||||||||||||||||
| 3 | AF 3064 (or equivalent)– Project Schedule | x | Prior to Mobilizaton | 3 | |||||||||||||||||
| 4 | AF 3065 – Progress Report | x | Prior to Mobilizaton | 4 | |||||||||||||||||
| 5 | Key Personnel Letter | x | NTP | 5 | |||||||||||||||||
| 6 | MSDS Sheets as required | x | NTP | 6 | |||||||||||||||||
| 7 | Type of paint and quantity of beads required | x | x | x | x | x | NTP | 7 | |||||||||||||
| 8 | Yellow Reflective paint | x | x | x | x | x | NTP | 8 | |||||||||||||
| 9 | Milling depth | x | x | x | x | x | NTP | 9 | |||||||||||||
| 10 | Recycling Slips | x | NLT 5 Days from recycling | 10 | |||||||||||||||||
| 11 | Asphalt submital | x | x | x | x | x | NTP | 11 | |||||||||||||
| 12 | Other submittals as required by Specifications or Drawings | x | x | x | x | x | NTP | 12 | |||||||||||||
| 13 | 13 | ||||||||||||||||||||
| 14 | Field Test Reports | x | NLT 5 Days from date of test | 14 | |||||||||||||||||
| 15 | Close-out Documents - Electronic copies only | Prior to Final Payment | 15 | ||||||||||||||||||
| 16 | Contractor Warranties | 3 | Prior to Final Payment | 16 | |||||||||||||||||
| 17 | Record Drawings | 3 | Prior to Final Payment | 17 | |||||||||||||||||
| 18 | O&M Manual (if applicable) | 3 | 3 | 3 | 3 | Prior to Final Payment | 18 | ||||||||||||||
| 19 | Maintenance Summary Forms | 3 | Prior to Final Payment | 19 | |||||||||||||||||
| 20 | DD 1354 Worksheet | 1 | Prior to Final Payment | 20 |