This document is a Past Performance Reference Questionnaire for a federal contract opportunity. The solicitation is for the Mill & Overlay of Airfield Pavements at the 177th Fighter Wing, Egg Harbor Township, NJ. The project involves milling 2 inches and overlaying 2 inches of asphalt pavement, covering approximately 35,000 square feet across two locations on the active airfield.

The questionnaire is to be completed by clients/references of the offeror, providing evaluation of the offeror's performance in areas such as quality, schedule, customer satisfaction, management, cost control, and safety. The completed questionnaires are to be submitted directly to the 177th Fighter Wing Contracting Office. This is a Total Small Business set-aside contract with a NAICS code of 237310 and a magnitude between $100,000 and $250,000. A pre-proposal conference and site visit will be conducted.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A

PAST PERFORMANCE REFERENCE

QUESTIONNAIRE

Solicitation: W50S8F-24-R-0002 Project: Mill & Overlay Airfield Pavements Offeror:

Instructions to Offeror for sending Reference Questionnaire Forms:

Prepare and submit to the owners of the projects listed in your Exhibit A “Performance Relevancy Questionnaires”, a Past Performance Reference Questionnaire (Exhibit C). For Government contracts, the Client POC should be the Contracting Office. For commercial references, send to personnel with duties similar to those for Government contracts. Offerors should follow-up and encourage references to return completed questionnaires in a timely manner. If you have multiple references at one location (i.e. at a military base), send one cover letter and questionnaires for each contract for which you need a reference. Your questionnaire package should contain the following:

· Cover Letter (See SAMPLE on the next page)

· Respondent Info Rating Sheets (Exhibit C) (the following 4 pages). Offeror should put name in spaces indicated and ensure it is on every page for identification purposes.

OFFEROR SHOULD PLACE THEIR NAME ON TOP OF EACH QUESTIONNAIRE PAGE

In accordance with SECTION 00120 – PROPOSAL EVALUATIONS AND BASIS FOR AWARD, completed questionnaires should be sent directly to the Contracting Office.

OFFEROR SHOULD DELETE THESE INSTRUCTIONS BEFORE SENDING OUT QUESTIONNAIRES

SAMPLE TRANSMITTAL LETTER FOR

PAST PERFORMANCE EVALUATION QUESTIONNAIRE

Offeror’s Company Letterhead

Date:

To Client:

We have listed your firm as a reference for the work we have performed for you as listed below. Our firm will be submitting a proposal under a project advertised by the 177th Fighter Wing, New Jersey Air National Guard in Egg Harbor Township, NJ. In accordance with Federal Acquisition Regulations (FAR), they will evaluate our firm's past performance. Your candid response to the attached questionnaire will assist the government evaluation team in this process. We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. Space is provided for comments. Only one response from each office is required. Understand that while the responses to this questionnaire may be released to the offeror, FAR 15.306(e)(4) prohibits the release of the names of the persons providing the responses. Complete confidentiality will be maintained. Only one response from each firm is required.

Please return your completed questionnaire directly to the 177th Fighter Wing Contracting Office via email to:

177fw.contracting.org@us.af.mil

This documentation must arrive NOT LATER THAN [offeror to enter date], so that it can be evaluated by the Government with our proposal.

If you have questions regarding the attached questionnaire, or require assistance, please contact the 177th Fighter Wing Contracting Officer, MSgt Kirk Sherry at 177fw.contracting.org@us.af.mil and kirk.sherry@us.af.mil via email (preferred) at: or alternatively by telephone at 609-761-6096. Thank you for your assistance.

Signature and Title

National Guard PAST PERFORMANCE QUESTIONNAIRE (Exhibit A)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor / Offeror Information Firm Name: CAGE Code:

Address: SAM UEI Number:

Phone Number: Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub-Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify): Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy): Actual Completion Date (mm/dd/yy): Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable): Explain Differences:

4. Project Description:
Complexity of Work:HighMedRoutine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name: Title:

Phone Number: Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

THE 177th FIGHER WING CONTRACTING OFFICE REQUIRES THE CLIENT COMPLETE THIS

QUESTIONNAIRE AND RETURN DIRECTLY TO:

177fw.contracting.org@us.af.mil

THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional
Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory
Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.

TO BE COMPLETED & RETURNED BY CLIENT ONLY

Return Directly to: 177fw.contracting.org@us.af.mil

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts
EVGSMUN

b) Ability to meet quality standards specified for technical performance

E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
EVGSMUN
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
EVGSMUN

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
EVGSMUN
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
EVGSMUN

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project?
EVGSMUN
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
EVGSMUN
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
EVGSMUN
d) Overall customer satisfaction
EVGSMUN

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
EVGSMUN
b) Knowledge/expertise demonstrated by contractor personnel
EVGSMUN
c) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
EVGSMUN
d) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
EVGSMUN

5. COST/FINANCIAL MANAGEMENT

a) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
YesNo

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U N

b) Contractor complied with all security requirements for the project and personnel security requirements.
EVGSMUN

7. GENERAL

a) Compliance with contractual terms/provisions (explain if specific issues)
EVGSMUN
b) Would you hire or work with this firm again? (If no, please explain below)
YesNo
c) In summary, provide an overall rating for the work performed by this contractor.
EVGSMUN

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):