This document is a Project Manual for the Mill & Overlay of Airfield Pavements at the 177th Fighter Wing Air National Guard in Egg Harbor, New Jersey. The key details are:

The project requires milling 2 inches and overlaying 2 inches of asphalt pavement at two separate locations on the active airfield, totaling approximately 35,000 square feet. The work includes preparing the surface, applying tack coat, and installing hot mix asphalt. Specific requirements are provided for the asphalt materials, compaction, and pavement markings. The project is a total small business set-aside with a NAICS code of 237310 and a magnitude of construction between $100,000 and $250,000. A pre-proposal conference and site visit will be conducted. Contractors must review and adhere to all solicitation requirements and amendments posted to SAM.gov.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Manual For Mill & Overlay Airfield Pavements

AQRC222011

Prepared for:

177th Fighter Wing

Air National Guard

Egg Harbor, New Jersey

Prepared by:

177th Civil Engineering Squadron

Prepared date:

February. 16th 2024

SECTION TABLE OF CONTENTS

DIVISION 32 - EXTERIOR

IMPROVEMENTS

PART 1

SECTION UFC 3-270-1

Maintenance and Repair

1. General- Types of maintenance and repair of asphalt pavement.

2. Equipment

3. Execution

PART 2

SECTION UFC 3-250-03

Asphalt Surface Layer

1. General

2. Products

3. Execution

PART 3

SECTION UFC 3-260-04

Pavement Markings

1. General

2. Quality Assurance

3. Project/Site Condition

4. Application

Part 1. MAINTENANCE AND REPAIR OF PAVEMENT

1. GENERAL

1.1 UNIT PRICES

1.1.1 Measurement

Asphalt pavement rehabilitation is measured by the number of square yards of pavement to be removed.

1.1.2 Payment

Asphalt milling is paid for in the contract as a lump sum line item and must include the cost of Milling for both locations.

1.2 ADMINISTRATIVE REQUIREMENTS

Submit a schedule of work to the Contracting Officer. Describe the work to be accomplished; noting the location of work, distances from the ends of runways, taxiways, buildings, and other structures; and indicating dates and hours during which the work will be accomplished.

Schedule the work to conform to aircraft operating schedules. The Government will try to schedule aircraft operations so as to permit the maximum amount of time for the Contractor's work. However, in the event of any emergency, intense operational demands, adverse wind conditions, and other unforeseen difficulties, discontinue all work at locations in the aircraft operational area. Keep the approved schedule of work current and notify the Contracting Officer of any changes prior to beginning each day's work.

1.3 PURPOSE OF REHABILITATION

The primary purpose for applying surface treatments and carrying out other repairs in asphalt pavements is to reduce the cost associated with vehicle or aircraft damage due to foreign object damage, to extend the service life of the pavement and to reduce the lifecycle costs for the pavement structure. The needed repair is considered to be Cold milling and re-surfacing the area.

1.4 WEATHER EFFECT

All re-surfacing work must be performed during dry weather and on dry surfaces. Place courses only when the surface temperature of the underlying course is greater than 40 degrees F (4 degrees C) for course thicknesses greater than 3 inches (75 millimeters) and 45 degrees F (7 degrees C) for course thicknesses 3 inches (75 millimeters) or less. When hot asphalt mixtures are placed on cold pavements, they may quickly cool, making adequate compaction difficult. Moreover, asphalt and asphalt mixtures do not bond adequately to damp surface.

2. EQUIPMENT

2.1 PAVEMENT REPAIR EQUIPMENT

All equipment must be inspected before and during the repair project to ensure safe operation and proper application. Follow proper safety procedures in accordance with OSHA guidelines and standard practices for the protection of all project personnel. Make hand tools available for working in areas where machinery is not practical or allowed.

3. EXECUTION

3.1 COLD MILLING

Pavement milling is the process or removing at least part of the surface of a paved area such as a road, bridge or parking lot. Milling removes anywhere from just enough thickness to level and smooth the surface to a full depth removal. Recycling of the road surface is one of the main reasons for milling a road surface. Milling is widely used for pavement recycling, where the pavement is removed and ground up to be used as the aggregate in new pavement. This reduces the impact that resurfacing has on the environment.

Milling can also remove distress from the surface, providing a better driving experience and/or longer roadway life.

3.2 TACK COAT

Tack coat shall be applied to the existing pavement surface before it is overlaid with new asphalt overlay. The tack coat provides bond between the old and new pavement. Procedural steps for tack coat:

3.2.1. Prepare the surface: clean and dry surface and ensure it is free of dust, loose dust and other debris.

3.2.2. Apply the tack: use a distributor to apply tack coats over large area or hand-wand for small area.

Apply the tack coat at a proper application rate in an even and uniform coat over the entire area. Application rates for tack coats range from 0.05 to 0.1 gallon per square yard (0.23 to 0.45 liter per square meter).

Allow tack coat to cure before placing the overlay or patch material. Cure times will vary according to the type of tack material used and climatic conditions but typically it is a few minutes up to one to two hours. When asphalt cement is used as a tack coat, no cure time is required.

3.3 PROJECT/SITE CONDITIONS

3.3.1 Environmental Requirements

Ensure pavement surface is free of snow, ice or slush. Ensure surface temperature is at least 5 degrees C 40 degrees F and rising at the beginning of operations.

3.3.2 Airfield Traffic Control

Coordinate performance of all work in the controlled zones of the airfield with the Contracting Officer.

3.3.3 Emergency Landing and Takeoff

Emergencies take precedence over all operations. Upon notification from the Control Tower of an emergency landing or imminent takeoff, stop all operations immediately and evacuate all personnel and equipment to an area not utilized for aircraft traffic which is at least 76 m 250 feet measured perpendicular to and away from the near edge of the runway unless otherwise authorized by the Contracting Officer or the Contracting Officer's Representative. Equipment and chemicals or detergents as well as excess water must be able to clear the work area within 3 minutes.

3.3.4 Airfield Lighting

When night operations are necessary, provide all necessary lighting and equipment. Direct or shade lighting to prevent interference with aircraft, the air traffic control tower, and other base operations. Provide lighting and related equipment capable of being removed from the runway within 15 minutes of notification of an emergency. Night work must be coordinated with the Flight Operations Manager or Airfield Manager and approved in advance by the Contracting Officer or authorized representative.

3.4 SAFETY

Comply with OSHA 29 CFR 1910.

PART 2 ASPHALT SURFACE LAYER

2.1 GENERAL

2.1.1 UNIT PRICES

2.1.2 Measurement

Asphalt pavement is measured by the tons delivered and installed.

2.1.3 Payment

Asphalt pavement is paid for in the contract as a lump sum line item and must include the cost of Asphalt for both locations.

2.1.4 TYPE OF DAMAGE

Rutting can occur in Hot Mix Asphalt (HMA) pavements when subjected to slow moving traffic. To repair the rutting confined to the existing HMA surface by cold milling followed by HMA overlay.

2.2 PRODUCTS

2.2.1 HOT MIX ASPHALT

Hot mix asphalt shall be produced by heating the asphalt binder to decrease it viscosity and drying the aggregate to remove moisture prior to mixing.

Mixing shall be performed with the aggregate at about 300 degrees F (roughly 150 degrees C) for virgin asphalt, 330 degrees F (166 degrees C) for polymer modified asphalt, and asphalt cement at 200 degrees F (93 degrees C). Paving and compaction shall be performed while the asphalt is sufficiently hot.

2.2.1.1 Bituminous material shall conform to the following requirements:

Bituminous asphalt properties shall be Performance Graded (PG) materials conforming to the requirements of AASHTO Provisional Specification MP-1.

Bituminous asphalt shall be PG 64-22 as required by the type of bituminous concrete pavement.

The Contractor shall furnish vendor's certified test reports for each lot of bituminous material shipped to the project. The vendor's certified test report for the bituminous material can be used for acceptance.

2.2.1.2 Recycled asphalt will not be permitted for use on this project.

2.2.1.3 Surface layer material acceptance: prior of the delivery of the materials to the job site, the Contractor shall submit certified test reports to the Engineer for Coarse aggregate, fine aggregate and bituminous material.

The certification(s) shall show the appropriate ASTM test(s) for each material, the test results, and a statement that the material meets the specification requirement. Plant-produced material shall be tested for stability, flow, and air voids on a lot basis. Sampling shall be from material deposited into trucks at the plant or from trucks at the job site.

Samples shall be taken in accordance with ASTM D 979.

2.2.1.4 Compaction: After placing, the mixture shall be thoroughly and uniformly compacted by power rollers. Rollers of the vibratory, steel wheel, and pneumatic-tired type shall be used. They shall be in good condition, capable of operating at slow speeds to avoid displacement of the bituminous mixture. The number, type, and weight of rollers shall be sufficient to compact the mixture to the required density while it is still in a workable condition.

2.3 EXECUTION

2.3.1 COMPACTION OF MIXTURE

After placing, the mixture shall be thoroughly and uniformly compacted by power rollers. The surface shall be compacted as soon as possible when the mixture has attained sufficient stability so that the rolling does not cause undue displacement, cracking or shoving. The sequence of rolling operations and the type of rollers used shall be at the discretion of the Contractor. The speed of the roller shall, at all times, be sufficiently slow to avoid displacement of the hot mixture and be effective in compaction. Any displacement occurring as a result of reversing the direction of the roller, or from any other cause, shall be corrected at once. Sufficient rollers shall be furnished to handle the output of the plant. Rolling shall continue until the surface is of uniform texture, true to grade and cross section, and the required field density is obtained. To prevent adhesion of the mixture to the roller, the wheels shall be equipped with a scraper and kept properly moistened but excessive water will not be permitted.

Any mixture that becomes loose and broken, mixed with dirt, contains check-cracking, or in any way defective shall be removed and replaced with fresh hot mixture and immediately compacted to conform to the surrounding area.

This work shall be done at the Contractor's expense. Skin patching shall not be allowed.

PART 3 PAVEMENT MARKINGS

3.1. GENERAL

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION

OFFICIALS (AASHTO)

AASHTO M 247 (2013) Standard Specification for

Glass Beads Used in Pavement Markings

AASHTO M 248 (1991; R 2012) Standard Specification for Ready-Mixed White and Yellow Traffic Paints

AASHTO M 249 (2012; R2016) Standard Specification for White and Yellow Reflective Thermoplastic Striping Material (Solid Form)

ASTM INTERNATIONAL (ASTM)

ASTM D1652 (2011; E 2012) Standard Test Method for Epoxy Content of Epoxy Resins

ASTM D2074 (2007; R2013) Standard Test Methods for Total, Primary, Secondary, and Tertiary Amine Values of Fatty Amines by Alternative Indicator Method

ASTM D2240 (2015) Standard Test Method for

Rubber Property - Durometer Hardness

ASTM D2621 (1987; R 2016) Standard Test Method for Infrared Identification of Vehicle Solids from Solvent-Reducible Paints

ASTM D2697 (2003; R 2014) Volume Nonvolatile Matter in Clear or Pigmented Coatings

ASTM D3335 (1985a; R 2014) Low Concentrations of Lead, Cadmium, and Cobalt in Paint by Atomic Absorption Spectroscopy

ASTM D3718 (1985a; R 2015) Low Concentrations of Chromium in Paint by Atomic Absorption Spectroscopy

ASTM D3924 (2016) Standard Specification for

Environment for Conditioning and Testing Paint, Varnish, Lacquer, and Related Materials

ASTM D3960 (2005; R 2013) Determining Volatile

Organic Compound (VOC) Content of Paints and Related Coatings

ASTM D4060 (2014) Abrasion Resistance of

Organic Coatings by the Taber Abrader

ASTM D4061 (2013) Standard Test Method for Retro reflectance of Horizontal Coatings

ASTM D4280 (2012) Extended Life Type, Non-plowable, Raised, Retroreflective Pavement Markers

ASTM D4383 (2012) Standard Specification for

Plowable, Raised Retroreflective Pavement Markers

ASTM D4505 (2012; R 2017) Standard Specification for Preformed Retro reflective Pavement Marking Tape for Extended Service Life

ASTM D4541 (2017) Standard Test Method for Pull- Off Strength of Coatings Using Portable Adhesion Testers

ASTM D471 (2016a) Standard Test Method for

Rubber Property - Effect of Liquids

ASTM D476 (2015) Dry Pigmentary Titanium

Dioxide Pigments

ASTM D522/D522M (2014) Mandrel Bend Test of

Attached Organic Coatings

ASTM D638 (2014) Standard Test Method for

Tensile Properties of Plastics

ASTM D6628 (2003; R 2015) Standard Specification for Color of Pavement Marking Materials

ASTM D695 (2010) Standard Test Method for

Compressive Properties of Rigid

Plastics

ASTM D711 (2010; R 2015) No-Pick-Up Time of

Traffic Paint

ASTM D7234 (2012) Standard Test Method for Pull-Off

Adhesion Strength of Coatings on Concrete Using Portable Pull-Off Adhesion Testers

ASTM D823 (1995; E 2012; R 2012) Producing Films of Uniform Thickness of Paint, Varnish, and Related Products on Test Panels.

ASTM E1347 (2006; R 2011) Color and Color Difference Measurement by Tristimulus (Filter) Colorimetry

ASTM E1710 (2011) Standard Test Method for

Measurement of Retroreflective Pavement Marking Materials with CEN- Prescribed Geometry Using a Portable Retro reflectometer

ASTM E2177 (2011) Standard Test Method for

Measuring the Coefficient of Retroreflected Luminance (RL) of Pavement Markings in a Standard Condition of Wetness

ASTM E2302 (2003; R 2016) Standard Test Method for

Measurement of the Luminance Coefficient Under Diffuse Illumination of Pavement Marking Materials Using a Portable Reflectometer

ASTM G154 (2016) Standard Practice for

Operating Fluorescent Light Apparatus for UV Exposure of Nonmetallic Materials

INTERNATIONAL CONCRETE REPAIR INSTITUTE (ICRI)

ICRI 03732 (1997) Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays

MASTER PAINTERS INSTITUTE (MPI)

MPI 32 (2012) Traffic Marking Paint, S.B.

MPI 97 (2012) Traffic Marking Paint, Latex

U.S. FEDERAL AVIATION ADMINISTRATION (FAA)

FAA AC 150/5370-10 (2014; Rev G; Errata 1 2015; Errata 2

2016) Standards for Specifying Construction of Airports

U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)

MUTCD (2015) Manual on Uniform Traffic Control Devices

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

FED-STD-595 (Rev C; Notice 1) Colors Used in Government Procurement

FS TT-B-1325 (Rev D; Notice 1; Notice 2 2017) Beads (Glass Spheres) Retro- Reflective (Metric)

FS TT-P-1952 (2015; Rev F) Paint, Traffic and

Airfield Markings, Waterborne

3.2. QUALITY ASSURANCE

3.2.1 Regulatory Requirements

Submit certificate stating that the proposed pavement marking paint meets the Volatile Organic Compound, (VOC) regulations of the local Air Pollution Control District having jurisdiction over the geographical area in which the project is located.

Submit Safety Data Sheets for each product.

3.2.2 Qualifications

Submit documentation certifying that pertinent personnel are qualified for equipment operation and handling of applicable chemicals. The documentation should include experience on five projects of similar size and scope with references for all personnel.

3.2.3 Qualifications for Airfield Marking Personnel

Submit documentation of qualifications in resume format a minimum of 14 working days before pavement marking work is to be performed showing personnel who will be performing the work have experience working on airfields, operating mobile self-powered marking, cleaning, and paint removal equipment and performing these tasks. Include with resume a list of references complete with points of contact and telephone numbers.

Provide certification for pavement marking machine operator and Foreman demonstrating experience successfully completing a minimum of two airfield pavement marking projects of similar size and scope. Provide documentation demonstrating personnel have a minimum of four years of experience operating similar equipment and performing the same or similar work in similar environments, similar in size and scope of the planned project.

The Contracting Officer reserves the right to require additional proof of competency or to reject proposed personnel.

3.2.4 DELIVERY AND STORAGE

Deliver paint materials, thermoplastic compound materials, and reflective media in original sealed containers that plainly show the designated name, specification number, batch number, color, date of manufacture, manufacturer's directions, and name of manufacturer.

Provide storage facilities at the job site, only in areas approved by the Contracting Officer, for maintaining materials at temperatures recommended by the manufacturer.

3.3. PROJECT/SITE CONDITIONS

3.3.1 EQUIPMENT

3.3.1.1 Application Equipment

Submit application equipment list appropriate for the material(s) to be used. Include manufacturer's descriptive data and certification for the planned use that indicates area of coverage per pass, pressure adjustment range, tank and flow capacities, and all safety precautions required for operating and maintaining the equipment. Provide and maintain machines, tools, and equipment used in the performance of the work in satisfactory operating condition, or remove them from the work site. Provide mobile and maneuverable application equipment to the extent that straight lines can be followed and normal curves can be made in a true arc.

3.3.1.2 Paint Application Equipment

3.3.1.2.1 Airfield Marking

Provide self-propelled or mobile-drawn spraying machine for applying the paint for airfield pavements with an arrangement of atomizing nozzles capable of applying the specified line width in a single pass. Provide paint applicator with paint reservoirs or tanks of sufficient capacity and suitable gages to apply paint in accordance with requirements specified. Equip tanks with suitable mechanical agitators. Equip spray mechanism with quick-action valves conveniently located, and include necessary pressure regulators and gages in full view and reach of the operator. Install paint strainers in paint supply lines to ensure freedom from residue and foreign matter that may cause malfunction of the spray guns. The paint applicator must be readily adaptable for attachment of a dispenser for the reflective media approved for use.

3.3.1.2.2 Hand Application

Provide spray guns for hand application of paint in areas where the mobile paint applicator cannot be used.

3.3.2 Reflective Media Dispenser

Attach the dispenser for applying the reflective media to the paint dispenser and designed to operate automatically and simultaneously with the applicator through the same control mechanism. The bead applicator must be capable of adjustment and designed to provide uniform flow of reflective media over the full length and width of the stripe at the rate of coverage specified in paragraph APPLICATION.

3.3 MATERIALS

Use reflectorized waterborne or methacrylate paint for airfield markings. The maximum allowable VOC content of pavement markings is 150 grams per liter. Color of markings are indicated on the drawings and must conform to FED-STD-595 for airfields. Provide materials conforming to the requirements specified herein.

3.3.1 Waterborne Paint FS TT-P-1952, Type III

3.3.2 Reflective Media

3.3.3 Reflective Media for Airfields FS TT-B-1325, Type I, Gradation A

4. APPLICATION

Apply pavement markings to dry pavements only.

4.1. Paint

Apply paint pneumatically with approved equipment at rate of coverage specified herein. Provide guidelines and templates as necessary to control paint application. Take special precautions in marking numbers, letters, and symbols. Manually paint numbers, letters, and symbols. Sharply outline all edges of markings. The maximum drying time requirements of the paint specifications will be strictly enforced, to prevent undue softening of bitumen, and pickup, displacement, or discoloration by tires of traffic. If there is a deficiency in drying of the markings, painting operations must cease until the cause of the slow drying is determined and corrected.

4.2 Waterborne Paint

4.3 Airfields

For reflectorized and non-reflectorized markings, apply paint conforming to Type III at a rate of 2.7 plus or minus 0.20 square meter per liter 108 plus or minus 8 square feet per gallon For reflectorized markings, apply paint and glass spheres at the following rates:

Bead Type Paint Type Paint Application Rate Bead Application Rate

Type I (Gradation A)

Type I, II, III 121 plus or minus 6 Sq Ft/Gallon

8 plus or minus 1 lb/gallon