177the Fighter Wing, Det. 1 Warren Grove Range
FY20: Fire Break Maintenance
Solicitation: W50S8F-20-Q-0004
PRE-PROPOSAL CONFERENCE
August 11, 2020 177 Fighter Wing NJANG
Egg Harbor Twp., NJ
This meeting is strictly informational.
It is the responsibility of the contractor to review and respond to all the information in the solicitation prior to submitting a Proposal.
Funds are presently available for this procurement
Key Project Personnel
Contracting Office o Johanna Paz
Contracting Officer o MSgt Kirk Sherry Contract Specialist o MSgt Tammy Hickerson Contract Specialist
Warren Grove Range o Lt Col Gregory Poston
Commander o SMSgt Kenneth Rogers Operations NCOIC o MSgt Steve Gaskill Project Manager
Solicitation Information
• Solicitation posted to beta.SAM.gov on July 31, 2020
• NAICS: 115310 - Support Activities for Forestry, $8M
• Total Small Business Set-Aside: FAR 19.5
• Basis for Award: Best Value based on Price and Technical Capability
• Wage Determination
• Service Contract Act Wage Determination 2005-2006, Revision No. 31, dated 21 Feb
2020 applies.
• Performance Period: 01 September 2020 – 31 December 2020 o Includes Administrative Activities, Mobilization, De-Mobilization, Punch List, Cleanup, and Closeout Documents
• Solicitation Amendments have been issued:
• Solicitation Amendments 01 posted on August 05, 2020
• Solicitation Amendments 02 posted on August 06, 2020
• Additional Solicitation Amendments will be issued and MUST be acknowledged in the Offerors Proposal
Project Information
• Background – Warren Grove Range maintains a network of fire control breaks to assist in the prevention and containment of controlled burns on federally owned land.
• Scope - The project involves maintaining, clearing, & widening fire control breaks in 4 separate areas on Warren Grove Range.
o The Contractor is responsible for providing ALL supervision, maintenance, equipment, & personnel required for successful completion of the Performance Work Statement with in the Period of Performance.
o Contractor shall attend an on-site Coordination Meeting and Site Visit scheduled no more than two weeks after contact award.
Contractor shall evaluate the site with WGR Personnel, NJ Forest Fire Service, and 177FW Environmental Personnel prior to beginning clearing activities. NJ Department of Environmental Protection, NJ Pinelands Commission, and Rutgers Research personnel may be in attendance.
Project Information
• The Bid Submission, SF1442, contains five priced Contract Line Items (CLIN):
• CLIN 0001 – BASE BID: AREA #1
• CLIN 0002 – BASE BID: AREA #2
• CLIN 0003 – OPTION 01: AREA #3
• CLIN 0004 – OPTION 02: AREA #4
• CLIN 0005 – BASE BID: SAM (formerly eCMRA)
• No further Bid Break-Out is required by bidders.
Base Access
• This project is on a secure military facility
• All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113.
o Background Investigation requests MUST be submitted 10 days before access to base is required.
o Failure by the Contractor to submit the request in a timely manner will result in access to the base being denied at No Fault of the Government. The Contractor will NOT be entitled to delay claims.
• The Government reserves the right to limit or restrict access to the facility for any person based on adverse results to the background investigation.
• All personnel accessing the military facility consent to search of their persons, property, & vehicles every time they enter the base.
Site Facilities
• Contractor Site Facilities o Contractor shall provide & maintain their own sanitary facilities (port-a-john toilets, wash stations…) for the duration of the project o Site Office Trailer / Storage: Government facilities are NOT available for administrative use, break areas or secure storage.
• Contractor shall provide such facilities as he deems required for completion of the project o Utilities (water, natural gas, electric, comm…) are NOT available in the vicinity of the project area. Contractor shall provide for his own utilities, i.e. generator & water tanks.
Key Project Personnel
• Project Management & Site Superintendent o The contractor shall be required to provide a dedicated Site Superintendent through completion of the project.
o The Site Superintendent MUST be on site at all times during active construction activities.
o The Site Superintendent must be appointed in writing by the Contractor & approved by the Contracting Officer prior to mobilizing to the site.
What if I have a Question?
• Questions must be submitted via email to the
Contracting Office o No Later than 4:30pm, EST, August 17, 2020 o List the Solicitation #: W50S8F-20-Q-0004 in the Email Subject Line to ensure your question is answered before the Proposal Due Date.
o Submit questions by Email to:
• kirk.sherry@us.af.mil and johann.paz.1@us.af.mil
• Answers will be posted to beta.SAM.gov in the form of a Solicitation Amendment on a SF30 o Contractors will not receive personalized responses to questions.
Questions received after the above date & time will not be answered.
mailto:kirk.sherry@us.af.mil mailto:johann.paz.1@us.af.mil
Contractor Responsibility
• Contractors MUST be registered and Current in System for Award Management (SAM) at the time of Proposal Submission.
• Contractors must have self-certified as a small business under NAICS code 115310.
o The related SBA size standard is $8M
Proposal Requirements
• Clear and Concise Proposal addressing ALL requirements detailed in the Solicitation.
• Cover Letter – 1 Page
• Bid Price Sheet – 1 Page
• Signed SF30: Solicitation Amendments - 1 Page for each
Amendment
• Technical Capability Statement – 3 Pages Maximum ref:
Performance Work Statement Item 4.2
• If providing an Alternate Solution; Contractor MUST indicate how the solution will meet the Government’s Requirements and the intent of the Solicitation.
• Ref: Performance Work Statement Item 4.2.5
Proposal Due Date
August 21, 2020
@ 1:00pm, local time
Proposal Submission
• Mailed in: Postal Delivery / FEDEX / UPS… o Offerors shall email the Contracting Office giving notification that they have mailed in their Proposal & provide a tracking number to the Contracting Office.
o Mark the Outer Envelope:
• SOLICITATION #: W50S8F-20-Q-0004
• SENSITIVE – PROPOSAL ENCLOSED
• Hand Delivery to 177th Fighter Wing o All hand deliveries are by appointment only & must be during normal business hours.
o The Contractor must email the Contracting Office a minimum of 24 hours in advance for an Appointment
• Email to the Contracting Office o Proposals may be emailed to the 177th Fighter Wing Contracting Office at the below email addresses.
o List the Solicitation #: W50S8F-20-Q-0004 in the Email Subject Line o Proposals MUST be in PDF format and no larger than 15MB o Contractors are responsible for ensuring that their files legible, readable, & not corrupt.
o Contactors are responsible for emailing their proposals in enough time that they are received at the Government servers No Later Than the due date & time.
Contracting Email Addresses:
kirk.sherry@us.af.mil & johanna.paz.1@us.af.mil mailto:kirk.sherry@us.af.mil mailto:johanna.paz.1@us.af.mil
Proposal Submission
Bidders are responsible for ensuring that their Proposals are received by the Due Date & Time. Allow ample time for mail, shipping, communication, traffic delays, electrical outages…
Late Proposals will NOT be Accepted
What do I need to submit After Award?
• Subcontractor Information o Certificate of Insurance and Standard Form SF1413 o Due 14 days after of Notice to Proceed per FAR 52.222-11
• Professional Land Surveyor Qualifications
• Project Schedule
• Background Investigation Requests; Key Personnel Letter…
Technical Discussion
• Technical Discussion
• Question & Answers
This Presentation will be posted to beta.SAM.gov as a Solicitation Amendment on a SF30
| 177the Fighter Wind, Det. 1�Warren Grove Range�FY20: Fire Break Maintenance��Solicitation: W50S8F-20-Q-0004��PRE-PROPOSAL CONFERENCE� |
| Slide Number 2 |
| Key Project Personnel |
| Solicitation Information |
| Project Information |
| Project Information |
| Base Access |
| Site Facilities |
| Key Project Personnel |
| What if I have a Question? |
| Contractor Responsibility |
| Proposal Requirements |
| Proposal Due Date |
| Proposal Submission |
| Proposal Submission |
| What do I need to submit �After Award? |
| Technical Discussion |
| This Presentation will be posted to beta.SAM.gov as a Solicitation Amendment on a SF30 |