Attach_14_20-B-0002_4MunDr_Ph02_Bid_QA_20200611.pdf

PDF 129 KB Posted

Attached to
AQRC172008B- Replace Munitions Storage Igloo Doors, Ph. 2
Solicitation number
W50S8F-20-B-0002
Issued by

View the file

Other files

File Type Posted
W50S8F-20-B-0002_MunDrPh02_OF_1419_Signed_Sherry and Paz.pdf PDF
W50S8F-20-B-0002_Amend_02_SF30.pdf PDF
Attach_01rev02_20-B-0002_MunDrPh2__Attach_Sched.xlsx XLSX spreadsheet
Attach_15_20-B-0002_MunDr-Ph02_High_Sec_Hasp_Spec.pdf PDF
Attach_13b_20-B-6002_B260_Overall.pdf PDF
Attach_13c_20-B-6002_MunDr_Ph02_Pics_Door_B.pdf PDF
W50S8F-20-B-0002_Amend_01_SF30.pdf PDF
Attach_13e_20-B-6002_MunDr_Ph02_Pics_Door_S.pdf PDF
Attach_13a_20-B-6002_MunDr_Ph02_Pics_Door_A.pdf PDF
Attach_13d_20-B-6002_MunDr_Ph02_Pics_Door_G.pdf PDF
Attach_01rev01_20-B-0002_MunDrPh2__Attach_Sched.xlsx XLSX spreadsheet
Attach_12_20-B-0002_MunDr_Ph02_Pre-Bid_Conf_PPTand Reg.pdf PDF
Attach_04_20-B-0002_MunDrPh2_SOW_20200522.docx DOCX document
Attach_08_20-B-6002_MunDrPh2_InsuranceRequire.docx DOCX document
Attach_09_20-B-6002_MunDrPh2_EnviroManagSystem.pdf PDF
Attach_07_20-B-0002_MunDrPh2_DOL_Wage_Rate.pdf PDF
Attach_011_20-B-6002_MunDrPh2_177FW_VicinityMaps.pdf PDF
Attach_01_20-B-0002_MunDrPh2__Attach_Sched.xlsx XLSX spreadsheet
Attach_05_20-B-0002_MunDrPh2_Specifications.pdf PDF
W50S8F-20-B-0002_SF1442_IFB_Solicitation_20200523.pdf PDF
Attach_010_20-B-6002_MunDrPh2_OPSEC_Letter.docx DOCX document
Attach_03_20-B-6002_MunDrPh2_Section 00_21_00_20200522.docx DOCX document
Attach_02_20-B-6002_MunDrPh2_Section 00_20_00_20200522.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: W50S8F-20-B-0002 Project Name & Number: AQRC172008B: B260 Replace Munitions Storage Igloo Doors

Updated: Thursday, June 11, 2020

RFI # Submitted Answered Question Response Response By 1 02-Jun-20 09-Jun-20 How many unique door sizes? In Dwgs/SOW 177 CES 2 02-Jun-20 09-Jun-20 Are they all Type 1 (hinged, double leaf)? In Dwgs/SOW 177 CES

3 02-Jun-20 09-Jun-20 It appears they are double leaf – can they have a center frame support?

Should this support be removable?

No 177 CES

4 02-Jun-20 09-Jun-20 Are we replacing existing doors? If so can we get more details about the existing door construction?

In Dwgs/SOW.

Ref: Pictures & Virtual Site Visit Link detailed in Pre-Bid Conference Meeting posted in Amendment 01 on June 3

177 CES

5 02-Jun-20 09-Jun-20

a) Do the doors need to watertight or airtight?

b) If not, do we need to use the exact weather stripping mentioned in spec 2.7.3.1? or

c) Do we have some leeway for our own design.

Neither air nor watertight 177 CES

6 02-Jun-20 09-Jun-20 Is the blast pressure internal (Unseating) or external (Seating)?

Internal

177 CES

7 02-Jun-20 09-Jun-20

a) What type of latching is preferred?

b) Is this to be a quick acting door? )

c) Or if the pressure is Seating, do they need any latches at all? (no latches are illustrated on contract drawings).

Provide doors as detailed in the Drawings & Specs 177 CES

8 02-Jun-20 09-Jun-20 Are there any more details about the “security hasp”? Specifications Attached 177 CES

9 08-Jun-20 11-Jun-20 Does the contractor have to maintain the 40F temperature inside the storage bay while the door are being replaced No 177 CES

10 08-Jun-20 11-Jun-20 Will the project require temporary partitions listed in the specifications. No 177 CES

11 08-Jun-20 11-Jun-20 In the quality requirements listed in the specifications section it is stated that mockups will be required on the jobsite and for laboratory testing, will this be required? No

177 CES

12 08-Jun-20 11-Jun-20 It is stated that all outside testing agencies will be procured and paid by the Air National Guard, will these tests be required?

Testing shall be performed IAW with the drawing and specifications. The Government reserves the right to conduct testing and inspections IAW 52.246-1 Contractor Inspection Requirements and 52.246-12 Inspection of Construction.

https://www.acquisition.gov/content/52246-1-contractor-inspection-requirements https://www.acquisition.gov/content/52246-12-inspection-construction

177 CES

13 08-Jun-20 11-Jun-20 Are there any special requirements for field welding on the existing frame embedded in the concrete?

Testing shall be performed IAW with the drawing and specifications specifically, but not limited to Section 0133002.1-L 177 CES

177th Fighter Wing Pre-Bid RFI Questions & Clarifications