This document is a Statement of Work (SOW) for a federal contract opportunity to replace carpets in several offices, conference rooms, and communal spaces at the Stewart Air National Guard Base in Newburgh, New York.
The SOW outlines the contractor's responsibilities, which include demolishing and disposing of the existing carpet, preparing the subfloors, and installing new carpet tiles and base cove. The carpet, adhesive, and base cove materials are specified. The contractor must complete the work within 45 days of the 5th business day after contract award and provide submittals for any proposed equals or items not identified in the finishes section. The government will provide water, sewer, and electrical connections, as well as an unsecured outdoor storage area. The contractor must comply with all relevant safety and quality requirements. The related federal contract opportunity is a Request for Quote (RFQ) with a small business set-aside for the carpeting and installation work in Building 202 at the Stewart Air National Guard Base. Quotes are due by 11:00 AM EST on September 18, 2024, and the award will be made to the lowest priced quote that demonstrates the ability to meet the SOW requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 167.jpeg | JPEG file | |
| 172.jpeg | JPEG file | |
| 196.jpeg | JPEG file | |
| 171.jpeg | JPEG file | |
| 175.jpeg | JPEG file | |
| 189.jpeg | JPEG file | |
| Solicitation Amendment 0001.pdf | ||
| 168.jpeg | JPEG file | |
| 191C.jpeg | JPEG file | |
| 179.jpeg | JPEG file | |
| 174.jpeg | JPEG file | |
| 191A.jpeg | JPEG file | |
| 170.jpeg | JPEG file | |
| 192A.jpeg | JPEG file | |
| 177.jpeg | JPEG file | |
| 192.jpeg | JPEG file | |
| 181.jpeg | JPEG file | |
| 180.jpeg | JPEG file | |
| RFI 2.pdf | ||
| 166.jpeg | JPEG file | |
| 169.jpeg | JPEG file | |
| 195.jpeg | JPEG file | |
| 191B.jpeg | JPEG file | |
| 188.jpeg | JPEG file | |
| 185A.jpg | JPG image | |
| 173.jpeg | JPEG file | |
| Attachment 2.pdf | ||
| RFI 1.pdf | ||
| Attachment 1.pdf |
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
105 AIRLIFT WING (ANG)
ONE MAGUIRE WAY
NEWBURGH NY 12550-5075
1. Background
Stewart Air National Guard Base Operations building requires new carpets in several offices, conference rooms and communal spaces.
2. Scope
Contractor shall furnish all tools, parts, material, labor, supplies, equipment and incidentals required to properly perform work outlined below. All work shall be performed in a safe manner and shall be accomplished in accordance with all local, state, federal, and safety regulations to include any hazardous waste disposal if necessary.
3. Objectives
Demolition
- The contractor shall remove all carpet from the rooms shown on Attachment 1.
- The contractor shall remove all base cove around the perimeter of each space identified on Attachment 1.
- The contractor will be responsible for disposal of all debris/demolished material. It will be the contractor responsibility to remove all material from the base.
- The contractor will be responsible for moving any remaining furniture required to perform the work described herein, throughout the period of performance.
Preparation
- The contractor shall remove all excess adhesive from the subfloor in preparation for new carpet tile.
- The contractor shall remove all excess adhesive from the walls in preparation for the new base cove.
Install
- The contractor shall install carpet in all the rooms identified on Attachment 1. See finishes for material.
- The contractor shall install base cove along the perimeter of each space identified in Attachment 1.
Finishes
- Carpet: Mohawk authentic format tile, 24-inch x 24-inch, designing point or approved equal
- Carpet adhesive: Mohawk enpress or approved equal
- Base Cove: Tarkett rubber, 4- 1/2-inch, color charcoal or approved equal
- Base cove adhesive: Liquid nails or approved equal
Misc.
- Upon completion of the above items, contractor shall complete a through walkthrough with the KO.
- Any paint/walls or floor damaged during the period of performance shall be repaired by the contractor.
- The contractor shall begin work within 5 business days of award. The period of performance will be 45 days starting on the 5th business day after award.
- The contractor shall submit submittals to the KO prior to the start of any work.
submittals are required for any items not identified in the “finishes” section above or proposed equals.
4. General Requirements
1. The contractor shall provide all tools, materials, equipment, transportation, removal of debris and trash, supervision, and management (except as specified as Government Furnished) necessary to install, test, and repair facility safety items located at Stewart Air National Guard Base, Newburgh, New York.
a) Any waste of excess material resulting from any contract requirement shall be removed and disposed of by contractor at a proper disposal site off Stewart Air National Guard Station. Disposal, discharge, deposit, dumping, spilling, leaking, or placing of any materials, wastes, effluents, trash, garbage, oil, grease, paint, chemicals, etc. If any waste material is dumped in unauthorized areas, the contractor shall remove the material, restore the area to the condition of the adjacent undisturbed site at contractor’s expense.
b) The contractor shall comply with all Air Force, OSHA, and building codes requirements that are abiding by the Federal government, and State of New York.
c) Any additional work completed by the contractor without approval by the Contracting Officer shall be at the contractor expense.
d) The contractor shall submit material approval form to the contracting officer within 10 days of contract notice to proceed date. No materials shall be ordered without material approval of the contracting officer and the base civil engineer.
3. Government Furnished Property and Services. The government will provide water, sewer and electrical connections. Unsecure outdoor storage area at the base is available and must be requested through the project manager prior to utilizing. Secured storage is the responsibility of the contractor.
4. Quality Control. Contractor shall develop and maintain a quality program to ensure work is performed as described in this Statement of Work and in accordance with all local, state and federal rules.
5. Quality Assurance. The Government will maintain a Quality Assurance Program to ensure work is performed as described in this Statement of Work and in accordance with all local, state, and federal rules. The Project Manager will manage the Government’s QA program.
6. Hours of Operation. The hours of work shall be between 7:00 a.m. and 4:00 p.m. Monday through Friday unless otherwise prescribed by this statement of work. Work shall not be performed on Weekends and Federal Holidays without prior coordination from the Project Manager. NOTE: No work shall commence without prior coordination with the Base Facility Manager and the government project manager. Work within each building shall not commence without prior coordination of the applicable building manger, the contractor, and government project manager.
a) The contractor shall schedule and arrange work with the 105 CE building facility manager at least seven (7) working days before beginning work on-site. The contractor shall make every effort to minimize the interference and effect on the government mission.
b) PRIOR TO ANY WORK STARTING ON A FACILITY, A MANDATORY
WALK THROUGH SHALL BE SCHEDULED AND ACCOMPLISHED WITH
THE GOVERNMENT PROJECT MANAGER OR CONSTRUCTION
INSPECTOR FOR EXPLANATION AND REQUIREMENTS OF WORK
WITHIN EACH BUILDING.
7. Technical Competence and Ability. If requested by the Government, the Contractor shall provide proof of technical competence and experience in the area of expertise required by this Statement of Work. The contractor shall be prepared to submit documents providing proof of successful competence such as training certificate or accreditations from recognized industry leaders. Contractors shall also be prepared to provide proof of successful project experience through references of former clients in related project types.
8. Dimensions and Quantity. All dimensions and quantities provided in the Statement of Work are estimates only. They are provided as a courtesy for contractors to estimate the magnitude of work or materials necessary to complete a task. They are not intended to be final measurements. The Contractor is responsible for verifying all dimensions and quantities in the field prior to submitting bids.
9. Warranty. The contractor shall guarantee all workmanship and materials covered under this statement of work for a period of no less than 1 year from the date of project acceptance. This contractor’s warranty shall be included with any manufacturer’s warranties that accompany materials or systems installed as part of this statement of work.
SUBMITTALS
All submittals will be transmitted with an AF Form 3000. When submitting on a finish, texture or other material characteristic where a photograph is unacceptable, the Contractor will provide a sample of the material for review and approval along with the product cut-sheet.
5. Delivery
All parts and materials shall be genuine replacement parts, as manufactured or recommended by the manufacturer. Only new standard parts shall be used in completed repairs. Performance shall take place at the 105th Airlift Wing, Stewart ANGB, Newburgh, NY.
6. Government Furnished Property: None
7. Security
Contractors should be aware that this is a Military Installation and that all access to this installation is granted by the 105 AW Base Defense Squadron. The U.S. government will not be held liable for any delays or breach of contract caused by refusal of the 105th AW Base Defense Squadron. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer.
A contractor’s badge will be issued once the contractor enters the main gate at Stewart Air National Guard Base. All employees are required to have the proper ID (social security card, driver’s license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper ID, they will be turned away. Vendors should be aware that Anti- Terrorism Force Protection Measures are applicable to this contract. Vendors will be briefed on these measures by Base Defense personnel if recurring or long term access is required to Stewart ANG Base. Otherwise you will be escorted at all times by a member of Stewart ANG Base.
8. Safety Requirements
The contractor shall comply with all Occupational Safety and Health Act (OSHA), federal, state, and local laws, regulations, and requirements regarding safety, as applicable to the services provided under this contract. In the event safety laws or regulations change during the term of this contract, the contractor is required to comply as such laws come into effect.