This is a Combined Synopsis/Solicitation and Request for Quotation (RFQ) issued by the Department of the Air Force, 152nd Airlift Wing for the Nevada Air National Guard.

The solicitation (W50S8C-26-Q-A009) seeks quotes for the purchase and installation of a new Self-Contained Breathing Apparatus (SCBA) Air Compressor, including removal and disposal of the existing system. The requirement is set as a Total Small-Business Set-Aside under NAICS code 333912 (Heating Equipment Manufacturing). Quotes must be submitted by May 5, 2026, at 10:00 AM PDT, with written questions due by April 24, 2026, at 10:00 AM PDT. The point of contact is Contract Specialist SSgt Wendy Cano Perez (wendy.cano_perez@us.af.mil, 775-788-9350) and Contracting Officer Capt. Alex Norris (alex.norris@us.af.mil, 775-788-4662). Delivery is FOB Destination to the 152nd Civil Engineering Squadron at 1776 National Guard Way, Reno, NV 89502.

Quotes must include part numbers, product descriptions, delivery/lead times, installation timeframes, and all pricing with FOB destination included. Two line items are required: equipment cost and a separate labor/installation/testing/inspection job cost, with a total bottom-line price. Quotes are valid for 150 days after the response deadline. Award will be made on a best-value basis to a responsible, responsive vendor meeting all technical requirements and providing the lowest evaluated price. Technical acceptability is evaluated on a pass/fail basis regarding specifications compliance and ability to meet PWS requirements. Funds are not currently available, so no contract award will be made until appropriated funds are available.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

152D AIRLIFT WING (AMC)

RENO-TAHOE AIR NATIONAL GUARD BASE NEVADA

Combined Synopsis/Solicitation

Requirement Title: 152 CES SCBA Air Compressor

Solicitation Number: W50S8C-26-Q-A009

Solicitation Issue Date: Thursday, 16 April 2026

Response Deadline: Tuesday, 05 May 2026 no later than 10:00 AM PDT

Point(s) of Contact: Contract Specialist: SSgt Wendy Cano Perez – wendy.cano_perez@us.af.mil 775-788-9350

Contracting Officer: Capt. Alex Norris - alex.norris@us.af.mil 775-788-4662

1. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued.

2. Solicitation number W50S8C-26-Q-A009 is issued as a request for quotation (RFQ) for a supply and service of installing a new

SCBA Air compressor and the removal of the old one.

3. IAW FAR 19.501 a "set-aside for small business" is the limiting of an acquisition exclusively for participation by small business concerns. A small business set-aside may be open to any of the small business concerns identified at 19.000(a)(3).

The type of set-aside used (if applicable) is: Total Small-Business Set-aside

The Federal Service Code / Product Supply Code is: N043

The North American Industry Size Classification System (NAICS) code associated with this requirement is: 333912

Award will be made to the offeror who represents the best value to the Government as outlined in accordance with the criteria set forth within the solicitation.

Description:

The Nevada Air National Guard, 152 Mission Support Contracting Office in Reno, Nevada, intends to award a Firm Fixed Price

Purchase Order for the purchase of equipment and installation of a new Air Compressor for Self-Contained Breathing Apparatus

(SCBA). The specifications of the new Air Compressor are within the Performance Work Statement. Additionally, the removal and disposal of the existing system.

Contractor will furnish all labor, supplies, parts, transportation, tools, equipment, inspections and facilities necessary to perform work required to complete the project in accordance with this Performance Work Statement.

The quote shall contain a; part number, description, all relevant product data, delivery/product lead time, installation time, and price.

This price should include delivery as FOB destination only. The quote should also provide a total line-item price for all the labor/ installation/testing/inspection involved and provide a bottom-line price for the summation of the quote.

Place of Delivery/Performance/Acceptance/FOB Point:

FOB: Destination

152nd Civil Engineering Squadron

General Information

Requirement Information mailto:wendy.cano_perez@us.af.mil mailto:alex.norris@us.af.mil

1776 National Guard Way

Reno, NV 89502

Line Item Description Quantity Unit Unit Price Extended Price

0001 SCBA Air Compressor (Equipment)

Contractor will furnish all labor, supplies, parts, transportation, tools, equipment, inspections and facilities necessary to perform work required to complete the project in accordance with this Performance Work Statement.

Each

0002 SCBA Air Compressor (Removal of old equipment and installation on new)

Contractor will furnish all labor, supplies, parts, transportation, tools, equipment, inspections and facilities necessary to perform work required to complete the project in accordance with this Performance Work Statement.

JOB

TOTAL: $

FAR provision 52.212-1 Instructions to Offerors - Commercial Products and Commercial Services (September 2023, applies to this acquisition. As prescribed in FAR 12.301(b)(1), the following addendum is provided for this solicitation and hereby amends any language therein:

The following words stating “offer”, “offeror”, and “proposal” are replaced with “quotation”, “vendor”, and “quote”.

Paragraph (a) first sentence revised as follows: “The NAICS code and small business size standard for this acquisition appear above.

Quoted amounts need to be net prices without tax.

The Government reserves the right to award on an "All or None" basis

Provide Quote Expiration Date, Best Delivery Date, and any Discount Terms

Quotes, attachments, and all other correspondence as listed in this solicitation must be emailed to both points of contact POCs).

- All questions are to be submitted in writing by

- Quotes are required to be valid until

BASIS FOR CONTRACT AWARD: (Addendum to 52.212-2, DEVIATION)

Evaluation of Quotes: In accordance with FAR 12.201-1 and FAR 12.205(a)(2), the following is provided:

a. Evaluation factors. The Government intends to award a purchase order resulting from this Request for Quotation (RFQ) to the vendor whose quotation conforms to the solicitation and is considered most advantageous to the Government, price and other factors considered. The following factors will be used to evaluate offers:

1. Technical Capability

2. Price

3. Period of Performance

b. Basis of Award: The award will be given to the vendor whose quotation represents the best value to the government.

Award will be given to the vendor who is deemed responsible, responsive, and represents the best value to the government based on the assessment of price and technical capability. To be eligible for award, a quotation must meet all technical

Instructions to Offerors

24 April 2026 10:00 AM PDT

150 days after the response deadline.

Evaluation Criteria requirements, conform to all required terms and conditions, and provide all information required as defined in Addendum to

52.212-1. To be rated "technically acceptable" the offer must have an "acceptable" rating in the Technical Factor. The technical area will be evaluated on an "acceptable" or "unacceptable" basis. If the quotation received is determined to be unacceptable, the vendor will be excluded from competition and will not be considered for award. Additionally, info offers are rated technically acceptable, the Contracting Officer has reserved the right to cancel the Solicitation in lieu of conducting discussions. In this case, the Government is under no obligation to release a new Solicitation.

EVALUATION FACTORS:

PRICE EXHIBIT

a. A quote's Total Evaluated Price (TEP) will be determined by the sum of all separately priced CLINs as presented on the combined synopsis/solicitation. If separate CLIN prices AND a TEP (as applicable) are not included, not clearly stated, miscalculated and/or not understandable, the offer may be rejected as non-responsive.

TECHNICAL EXHIBIT

a. Each technical factor will be evaluated on an acceptable/unacceptable basis and assigned a rating on whether the quote meets the solicitation requirements. Extra credit will not be assigned for exceeding the acceptable/ unacceptable criteria. A rating of "Acceptable" will be required in the factor to be eligible for award.

b. Technical Acceptable/Unacceptable Ratings

1. Rating Description:

Acceptable: Quote meets the requirements of the solicitation.

Unacceptable: Quote does not meet the requirements of the solicitation.

c. Technical Factor 1

1. Description: Specifications Compliance

2. Measure of Merit: Technical Acceptability will be based on the offeror providing sufficient explanation/ documentation to demonstrate their ability to conform to the requirements of the PWS. Failure to comply with the PWS will result in a Technically Unacceptable rating. Quotes that receive a technically unacceptable rating will not be consider for award. Contractor provided, in sufficient detail, a description of the products being provided to include a full list of materials and shall contain part number and description.

See Provisions and Clauses in the below Attachment.

Attachment 1 – Performance Work Statement

Attachment 2 - Wage Determination

Attachment 3 – Provisions and Clauses

☐ Funds Available

☒ Funds Not Currently Available

Award will be made to the offeror who represents the best value to the Government as outlined in accordance with the criteria set forth within the solicitation. No contract award will be made until appropriated funds are made available.

NG Agency Protest Program is intended to encourage interested parties to seek resolution of their concerns with the National

Guard (NG) as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability

Office (GAO) or other external forum.

Clauses and Provisions

Attachments

Other Pertinent Facts

Contract award or performance is suspended during the protest to the same extent, and within the same time periods as if filed at the GAO. The NG protest decision goal is to resolve protests within 35 calendar days from filing. An agency protest may be filed with either the Contracting Officer or the NG Agency’s Protest Decision Authority, but not both, in accordance with NG protest procedures.

To be timely, the protests must be filed with the periods specified in FAR 33.103. To file a protest under the NG Agency

Protest Program, the protest must request resolution under that program and be sent to the address below:

National Guard Bureau

Office of the Director of Acquisitions/ Head of Contracting Activity

ATTN: NGB-AQ-O

111 S. George Mason Dr.

Arlington, VA 22204

Email: ng.ncr.ngb-arng.mbx.ngb-task-order-ombudsman@mail.mil

All other agency-level protests should be sent to the Contracting Officer for resolution at the address in the solicitation. See

FAR clause 52.233-2.

NG Public-facing, general Protest information is found at: https://www.nationalguard.mil/Leadership/Joint-Staff/Special-

Staff/Director-of-Acquisitions/

Directorate of Acquisitions information for the contracting enterprise is found at https://gko.portal.ng.mil/ngb/STAFF/D01/D01/OI/Protests%20and%20Complaints/Forms/AllItems.as https://www.nationalguard.mil/Leadership/Joint-Staff/Special-Staff/Director-of-Acquisitions/ https://www.nationalguard.mil/Leadership/Joint-Staff/Special-Staff/Director-of-Acquisitions/ https://gko.portal.ng.mil/ngb/STAFF/D01/D01/OI/Protests%20and%20Complaints/Forms/AllItems.as

File details come from the government source that posted it. Updated .