Basewide Fall Protection - PWS Revised.pdf

PDF 974 KB Posted

Attached to
152 AW Base-wide Fall Protection
Solicitation number
W50S8C26QA007
Issued by

About this file

This is a Performance Work Statement (PWS) for Base-Wide Facility Fall Protection Services at the Nevada Air National Guard installation located at 1776 National Guard Way, Reno, Nevada 89502.

The contractor shall furnish and install permanent rooftop fall protection systems on multiple buildings to protect maintenance personnel working on exterior roofs. The contract period of performance is six months, with services provided between 0700-1600 hours Tuesday through Friday, excluding recognized US federal holidays and facility closures. All fall protection equipment must comply with OSHA standards 1926.501, 1926.502, 1910.28, 1910.29, and 1910.66(e)(3), as well as ANSI Z359 standards and be sealed by a Professional Engineer. The freestanding pedestrian egress barrier system must include railings with top and mid-rails meeting OSHA specifications, withstand 200-pound minimum structural loads in any direction, include rubber pads on base mounting, positive locking receiver posts with drain holes, and be manufactured in the USA with American Welding Society certification. Specific installations are required across 12 buildings including safety guardrail barriers (ranging from 8 to 136 linear feet), hatch guardrails, marking warning lines, standing seam safety rails, and safety ladder kits. The contractor must provide comprehensive submittals including product data, shop drawings, systems manuals with maintenance procedures, site-specific safety plans, quality control plans, project schedules, manufacturer warranties, hazardous chemical documentation, and waste disposal manifests. A final inspection walkthrough with the COR and certified inspector is required prior to project acceptance. The contractor must obtain base identification and vehicle passes for all personnel, complete Antiterrorism Awareness Level I training within 45 days, and comply with all installation security policies and regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver. October 2022

PERFORMANCE WORK STATEMENT (PWS)

FOR

Base-Wide Facility Fall Protection Services

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Exterior Facility Fall Protection Installation Services, as defined in this PWS.

1.2 Background: Multiple buildings on base require installation of fall protection devices to protect maintenance personnel working on the respective roofs. This project will ensure the required safety devices are both procured and properly installed.

1.3 Period of Performance (PoP): The Period of Performance shall be 6 months.

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0700-1600 on Tuesday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at 1776 National Guard Way (multiple buildings) Reno, NV 89502. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.1.1 Telework:

The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance.

Telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays.

The contractor shall not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.3 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS).

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative

(COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

2. The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures] to obtain a vehicle pass.

3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

4. When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with

5. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

6. Failure to comply with these requirements may result in withholding of final payment.

1.4.5.1.Reserved

1.4.5.2 For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (DAFI) 31-145, DAFI 31-101 and Air Force Manual (DAFMAN) 31-101V3), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)

1.4.5.3 Antiterrorism Awareness Level I Training (AT Level I). This standard language is for contractor employees with an area of performance within a US Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on Joint Knowledge Online (JKO) at https://jkodirect.jten.mil/Atlas2/ faces/page/login/Login.seam. For those without a CAC, select "Non-CAC" user on the JKO site. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.

1.4.5.4 Reserved

1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.6 Reserved

1.4.5.7 Reserved

1.4.5.8 Reserved

1.4.5.9 Reserved

1.4.5.10 Reserved

1.4.5.11 Reserved

1.4.5.12 Reserved

1.4.5.13 Reserved

1.4.5.14 Reserved

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.6.1 Reserved

1.4.6.2 Reserved

1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating high-reach equipment used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5.

The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced.

The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.

The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.10.1 Reserved

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at

FAR 22.17.

1.4.12 Reserved

1.4.13 Reserved

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.4.15 Reserved

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CM Contract Manager COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense DSCA Defense Counterintelligence and Security Agency FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance

IS Information System(s) KO Contracting Officer NGB National Guard Bureau OCI Organizational Conflict of Interest PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SCR Service Contract Reporting SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: The Government will furnish the necessary workspace/access for the contractor to perform services outlined in this PWS.

3.2 Materials: None

3.3 Equipment: None

3.4 Services: None

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

4.2 Reserved

4.3 Reserved

5.0 Requirements: The contractor shall: Furnish and install all parts/material required to equip the listed facilities with the respective listed safety equipment.

All provided/installed equipment shall comply with OSHA 1926.501 (Duty to have Fall Protection), 1926.502 (Fall protection systems criteria and practices), 1910.28 (Duty to have fall protection and falling object protection.), 1910.29 (Fall protection systems and falling object protection - criteria and practices) and 1910.66(e)(3) (Roof Guarding for Building Maintenance).

5.0.1 The contractor shall purchase and install permanent rooftop fall protection system on the exterior of buildings identified by Nevada Air National Guard (NVANG) in accordance with Occupational Safety and Health Act (OSHA), American National Standards Institute (ANSI), U.S. Army Corps of Engineers (USACE) Safety PAM 385-1.

Fall protection system construction shall be weather resistant.

5.0.2 The system shall meet American National Standards Institute (ANSI) Z359 standards and be sealed by a Professional Engineer.

5.0.3 Contractor shall provide freestanding pedestrian egress barrier system on roof, including railings, bases, and hardware.

1. Standards: System shall have top and mid rail in accordance with OSHA Standards - 29 Code of Federal Regulations (CFR) 1910.29 (b).

2. Structural Load: 200 pounds (lb) (90.7 kilograms (kg), minimum, in any direction to all components in accordance with OSHA Regulation 29 CFR 1926.502.

3. Railings: Free of sharp edges and snag points.

4. Mounting Bases: Provide rubber pads on bottom of bases.

5. Receiver Posts: Shall have a positive locking system into holes that allow rails to be mounted in any direction. Receiver posts shall have drain holes.

6. Product origin: Railings and Base Castings are specified as 100% made in USA.

Manufacturer must provide steel mill and foundry certificates for verification prior to shipment.

7. Quality/Standards Certifications: Manufacturer must be American Welding Society (AWS) Welding Certified for Welding Standards AWS D1.1 & AWS D1.3 Third party qualification documentation required prior to shipment.

8. Roof pads shall be provided under each base to protect roof membrane.

5.0.4 No rooftop penetrations are allowed with exception to penetrations to rooftop hatch framing assemblies for installation of Hatch Guardrail systems. The contractor shall ensure that all framing penetrations are sealed watertight after installation is complete.

5.1 Building 9

5.1.1 Safety Guardrail Barrier – Permanent, Non-fixed – (2) 136’ straight runs

5.1.2 Hatch Guardrail – (2) Size to be verified prior to ordering

5.2 Building 56

5.2.1 Safety Guardrail Barrier – Permanent, Non-fixed – (1) 38’ straight run, (1) 10’ straight run

5.3 Building 67

5.3.1 Marking Warning Line – (1) 80’ run

5.4 Building 76

5.4.1 Safety Guardrail Barrier – Permanent, Non-fixed – (6) 10’ straight runs

5.4.2 Safety Ladder Kit – Non-penetrating (10’ of protection on ea. side) – (1) Ladder kit

5.5 Building 84

5.5.1 Hatch Guardrail – (1) Size to be verified prior to ordering

5.6 Building 88

5.6.1 Standing Seam Safety Rail – Non-penetrating – (1) 8’ standing seam run

5.6.2 Safety Guardrail Barrier – Permanent, Non-fixed – (1) 10’ straight run

5.6.3 Hatch Guardrail – (1) Size to be verified prior to ordering

5.7 Building 111

5.7.1 Safety Guardrail Barrier – Permanent, Non-fixed – (1) 8’x8’corner run, (1) 21’ straight run

5.8 Building 130

5.8.1 Hatch Guardrail – (3) Size to be verified prior to ordering

5.9 Building 300

5.9.1 Hatch Guardrail – (1) Size to be verified prior to ordering

5.10 Building 600

5.10.1 Hatch Guardrail – (1) Size to be verified prior to ordering

5.11 Building 700

5.11.1 Hatch Guardrail – (1) Size to be verified prior to ordering

5.11.2 Safety Guardrail Barrier – Permanent, Non-fixed – (4) 10’ straight runs

(1) 16’ straight run, (1) 8’x10’ corner run

5.12 Building 800

5.12.1 Hatch Guardrail – (1) Size to be verified prior to ordering

5.12.2 Safety Guardrail Barrier – Permanent, Non-fixed – (1) 22’ straight run

(1) 12’ straight run, (1) 8’x10’ corner run

5.13 Quote to include an option for: powder coating all safety guardrail components (excluding Hatch Guardrail) Blue to match the metal roofs of the surrounding buildings (contractor to coordinate with COR for color selection prior to procurement)

5.14 All work shall conform to applicable local, State, Federal and Air Force Codes and Regulations to include with DAFMAN 91-203, UFC 3-110-03, UFGS-01 35 26 and AF TO 00-25-245. Contractor shall verify all conditions in the field and report discrepancies to the COR for clarification.

5.15 The Contractor to protect against construction debris, including dust, from entering non-project areas.

5.15.1 Contractor shall protect installed products until completion of project.

5.16 In the event of damages of any nature caused by this work due to improper protection, precaution or safety measures, such damages shall be repaired, or such property shall be replaced by the Contractor at no cost to the Government. Contractor shall touch-up, repair, or replace damaged products before substantial completion.

5.17 All workers on site will be required to be up to date regarding life safety training, OSHA certification, along with anything in relation to the project requirements.

5.18 Submittals. Contractor shall provide one electronic copy of all submittals to the KO and COR, for review and approval prior to order and install. All submittals shall be in PDF format.

5.18.1 List of Submittals:

1.Product Data, Shop Drawings, and Manufacturer’s Instructions.

2. Systems Manual to include Maintenance Procedures, Operation Procedures, Installation Certificate stamped by Professional Engineer, Product Certificate, and As- Built Drawings.

3. Site Specific Safety Plan.

4. Site Quality Control Plan.

5. Project Schedule.

6. Manufacturer’s warranty.

7. SDS’s and quantities used of all Hazardous chemicals brought onto base

8. Waste manifests/Bills of Lading for all solid waste hauled off base proving waste has been properly disposed of

5.19 FINAL ACCEPTANCE. Upon completion, the Contractor must schedule a Final Inspection walkthrough with the COR and a certified inspector to the satisfaction of the Government. This final project walkthrough must demonstrate that all contract work has been completed, including any deficiencies known to exist in accordance with the contract and scope. Once all contract work has been fulfilled, project acceptance will be granted.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication

Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar Defense Federal Acquisition

Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/in dex.html or https://www.acquisition.gov/dfars Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm

DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)

01/23/2014 (Change 1:

07/28/2020) http://www.esd.whs.mil/Directives/issuances/dodm

Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors

(paragraph 9)

August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201 -2.pdf

DoDM 5200.2 Procedures for the DoD Personnel Security Program

(PSP)

04/03/2017 https://www.esd.whs.mil/Directives/issuances/dodm/

DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common

Access Card (CAC)

09/09/14 (Change 1:

05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/

Homeland Security Presidential Directive (HSPD)-12

Policy for a Common Identification Standard for Federal Employees and

Contractors

08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11 Department of Defense Privacy and

Civil Liberties Programs

01/29/2019 https://www.esd.whs.mil/Directives/issuances/dodi/

DoD 5400.11-R Department of Defense Privacy

Program

05/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/

DoDD 8140.01 Cyberspace Workforce Management

10/05/2020 https://www.esd.whs.mil/Directives/issuances/dodd/

DoD 8570.01-M Information Assurance Workforce

Improvement Program

12/19/2005 (Change 4:

11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/

DoD 5220.22-M National Industrial Security Program

Operating Manual (NISPOM)

02/28/2006 (Change 2:

05/18/2016)

DAFI 31-145

Antiterrorism

11 Feb 2025 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

DAFI 31-101

Base Defense Operations 10 Sep https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

DAFMAN 31-101V3

Installation Perimeter Access Controls

09 Oct 2024 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131 https://www.acquisition.gov/?q=browsefar http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html https://www.acquisition.gov/dfars http://www.esd.whs.mil/Directives/issuances/dodm http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf https://www.esd.whs.mil/Directives/issuances/dodm/ https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.esd.whs.mil/Directives/issuances/dodi/ https://www.esd.whs.mil/Directives/issuances/dodd/

AFPD 17-1

Information Dominance Governance and Management

04/12/2016 https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

AFMAN 17-1301

Computer Security (COMPUSEC) 02/12/2020 https://www.e-publishing.af.mil/Product-

Index/#/?view=pubs&orgID=10141&catID=1&series =-1&modID=449&tabID=131

AFI 10-701

Operations Security

7/24/2019 (Change 1:

06/09/2020) https://www.e-publishing.af.mil/Product- Index/#/?view=pubs&orgID=10141&catID=1&series

=-1&modID=449&tabID=131

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form Date Website I-9

Employment Eligibility Verification

10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf

DD 441

Department of Defense Security

Agreement

Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001 -0499.htm

DD 250

Material Inspection and

Receiving Report

Aug 2000 https://www.esd.whs.mil/Directives/forms/dd0001_0499/ https://www.uscis.gov/sites/default/files/files/form/i-9.pdf http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance

Objective Performance Standard Acceptable Quality

Levels (AQL) Surveillance Method / By

Whom 5.1-5.19

Furnish and install safety devices

The contractor shall provide, properly install and verify correct installation of all equipment listed at each building listed in sections 5.1-

5.19 of this PWS.

Inspection by certified inspector is completed.

100% Inspection / Certified Inspector & COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title

Frequency Number of Copies

Medium/Format Submit To

1.4.5.3 AT Level 1

Awareness Training

Certificates

Provide within 15 calendar days after employee completes training.

1 Electronic Submission

COR

5.18.1 Submittals Provide throughout project 1 Electronic

Submission

KO and COR

A .G

.E

F A

C

IL

IT

Y

N U

M B

E R

F A

C

IL

IT

Y

N U

M E

R

IC

A L

F A

C

IL

IT

Y

L E

G E

N D

SA

N

G A

/F A

M

IL

Y

SU

P P

O R

T

301 67 66 F

IT

N

E

SS C

E N

T E

R

H E

A D

Q U

A R

T E

R S

L O

X O

X Y

G E

N

ST

O R

SH

E D

M A

IN

T

E N

A N

C E

H A

N G

E R

C

H A

PE

L

502 88 84 82

C

IV

IL

E N

G

IN

E E

R

IN

G

SQ

U A

D

SQ

U

A D

R O

N O

P E

R A

T

IO

N S

E N

G

IN

E I &

R

SH

O P

G A

T E

H O

U

SE

SE

C

U R

E E

N T

R Y

C E

R F

−P / C

O U

N T

E R

−D R

U G

F

U E

L C

E L

L H

A N

G A

R E

N G

IN

E

T E

ST

ST

A N

D (O

P E

N

SM

A

L L

A

IR

T E

R M

IN

A

L

P O

L O

PE

R

A T

IO

N

S/L A

B

400/402 B

A

SE

SU

P

P L

Y

/ ST

O R

A G

E

M U

N

IT

IO

N

S / M A

IN

T

. ST

O

R 121/122

E N

G

IN

E

SH

O P

ST

O

R A

G E

C

O M

M U

N

IC

A T

IO

N

S/

IN

T E

L L

IG

E

N C

E F

A C

IL

IT

Y

V

E H

IC

L

E M

A

IN

T . F

A C

IL

IT

Y

V

E H

IC

L

E M

A

IN

T

. ST

O R

A G

E

C E

ST

O

R A

G E

E

Q U

IP

N /A

F

IR

E

ST

A

T

IO

N M

A F

F S/ M

C

SA

T (M

O D

U L

A R

S)

P O

L F

U E

L

ST

A N

D S (C

A N

O P

Y

IN

T

E L

L

IG

E N

C E

C A

N O

P Y

304/305 P

O L

P U

M P

S/F

IL

T E

R H

O U

SE

F

IN

A

N C

E / C

O N

T R

A C

T

IN

G

SE

C

U R

IT

Y

F O

R C

E S

ST

A

R B

A

SE

/ O P

S/ M X

S

M E

D

IC

A L

/ D

IN

IN

G

P O

L

JE

T F

U E

L

ST

O R

. T A

N K

S 302/306

A N

G

A N

G

A N

G

A N

G

O verall B ase U tilities M ap - R oof Fall

Protection at Facilities

A p ril 0

A pril 04, 2026

N V A N

G Project N o.: 1001

B ase In frastru ctu re P lan

A p ril 2

- R oof Fall P rotection M ap N evada A ir N ational G uard - 1776 N ational G uard W ay R eno, N evada 89502 U

C TL xxxxxx

1.4.5.1.Reserved

File details come from the government source that posted it. Updated .