Attach 18 - Revised Pre-Bid RFIs and Responses_.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Renovate Alert Rooms, 3390 Federal contract opportunity
Solicitation number
W50S8B22B0002
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Alert Rooms, 3390, newest first.
File Type Posted
OF 1419 Abstract.pdf PDF
OF 1419A.pdf PDF
Attach 11 -DOL Wage Determination NJ20220027 06_24_2022.pdf PDF
SF1442 W50S8B22B00020003 Amendment 0003.pdf PDF
SF1442 W50S8B22B00020001 Amendment 0002.pdf PDF
Attach 20 - Alert Rooms Finish Specs.pdf PDF
Attach 21 - Alert Rooms Furnishings Attachment.pdf PDF
Attach 01 - Attachment Schedule_Updated 7_18_22.xlsx XLSX spreadsheet
Attach 17 - Pre-Bid Conference_Site Visit Attendance.pdf PDF
Attach 16 - Pre-Bid Conference Slides.pdf PDF
Attach 01 - Attachment Schedule_Updated 7_14_22.xlsx XLSX spreadsheet
Attach 18 - Pre-Bid RFIs and Responses_.xlsx XLSX spreadsheet
SF1442 W50S8B22B00020001 Amendment 0001.pdf PDF
Attach 19 - Pre-Bid RFI Attachment.docx DOCX document
Attach 11 - DOL Wage Determination.pdf PDF
Attach 02 - Section 00010 Notes.docx DOCX document
Attach 14 - JB MDL Antiterrorism Awareness for Contractors.pdf PDF
Attach 12 - Insurance Requirements.docx DOCX document
Attach 09 - B3390_E4-Electric.pdf PDF
Attach 08 - B3390_A19-Wall Detail.pdf PDF
Attach 05 - Alert Room Fixtures.pdf PDF
Attach 01 - Attachment Schedule.xlsx XLSX spreadsheet
Attach 15 - Appendix 4 to Annex C Contractor Appendix.DOCX DOCX document
Attach 13 - AT Statement.pdf PDF
Attach 06 - B3390_A2-Dimensions.pdf PDF
Attach 04 - SOW V9 PTFL 192102 - Renovate Alert Rooms 3390.pdf PDF
Attach 03 - Bidder Instructions.docx DOCX document
Attach 10 - B3390_E9-Lighting.pdf PDF
Attach 07 - B3390_A15-Bathroom-Dims.pdf PDF
W50S8B22B0002 Repair Alert Rooms.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

108 Wing
Pre-Bid Questions & Clarifications
Solicitation #:W50S8B-22-B-0002
Project Name & Number:PTFL19102 Repair Alert Rooms, 3390
Updated:Updated 18 July 2022
RFI #SubmittedAnsweredQuestionResponseResponse By
130-Jun-2213-Jul-22Will the rooms be emptied before construction / will the furniture be removed from the rooms?Yes, there are plans to have the furniture removed before construction.R. Lanzetti
230-Jun-2213-Jul-22Can we install 1/4" gypsum board over the existing wallpaper in lieu of wallpaper removal?No, concerned with difference between new gypsum board face and face of the door frames would not provide enough depth for the new Medium Density Fiberboard (MDF) Moulding. Window sill overhang is also very small. Concern with added work required to account for 1/4" spacing for the outlets and light switches. See attached pictures.R. Lanzetti
330-Jun-2213-Jul-22What is the required / expected level of finish to the walls (Level 1, 2, 3, 4, or 5)?These rooms had not been refinished in 24 years, so the final finish is important. The final wall finish should be a level 4 or 5 finish, with a primer and two coats of paint. See attachment for finish level definition.R. Lanzetti
405-Jul-2213-Jul-22Who will be responsible to remove, store and reinstall existing furniture in rooms?The personnel using the alert rooms have plans to remove and store the furniture.R. Lanzetti
505-Jul-2213-Jul-22Will we be able to renovate all rooms at same time?Yes, plans are being coordinated to allow all rooms to be renovated at the same time.R. Lanzetti
605-Jul-2213-Jul-22There is a door to the exterior of building at end of corridor near kitchen, closest to room 1016, can this be used for access during construction activities?Yes, though the door will be locked at the end of each workday.R. Lanzetti
705-Jul-2213-Jul-22SOW calls for new ceiling tiles, please advise if the ceiling grid needs to be replaced also.No, ceiling grid may be reused, or remain in place for new ceiling tiles.R. Lanzetti
805-Jul-2213-Jul-22Does the door and frames get painted in these alert rooms? -Bathroom door, entry and closet doors? - If so both sides?Doors are wood, or wood veneer, will not be touched or painted. Door frames will be repainted, on each side, a color selected by the occupants.
R. Lanzetti
905-Jul-2213-Jul-22Is there VWC inside the closets as well or just in the rooms?Yes, there is currently Vinyl Wall Covering (VWC) or wallpaper on the inside walls of the closets.R. Lanzetti
1011-Jul-2218-Jul-22Please provide specs for the following trades: 1. LVT flooring; 2. Cove base (the SOW for cove base calls for MDF type trim) 3. Ceramic wall & Floor Tiles 4. Room darkening roman shades 5. Painting 6. All plumbing fixtures/toilet accessories as called for in para 4.2 for plumbing trade.See supplied specifications attached (Attach 20). Change reference to roman shades to Room Darkening Shades. Use room darkening shades that are typically used in Hotel rooms. There is no specification section provided for the Room Darkening Shades.R. Lanzetti
1112-Jul-2218-Jul-22Can the government provide a basis of design for each of the fixtures provided in "Attach 05 - Alert Room Fixtures.See Furnishings attachement (Attach 21) for manufacturer style/model info.R. Lanzetti
1212-Jul-2214-Jul-22Is only the shower stall area receiving ceramic tile?The floor tile and wall base tile will also be replaced with new tile. The only wall tile will be in the shower stall.R. Lanzetti
1312-Jul-2214-Jul-22What is the height of the new wood MDF base?A common style for MDF trim is LWM-623, The height for this style is 3-1/4" x 1/2" x length.R. Lanzetti
1412-Jul-2214-Jul-224.2.4.3 is calling for two glass panels and one glass door. Are you looking for a frame-less glass enclosure?
Shower glass panels may have a frame, or be frameless. Either will be accepted.R. Lanzetti
1512-Jul-2214-Jul-22Will the new lighted mirror switch be located by the overhead light switch?
Lighted mirror switch may be located by the overhead light switch. Overhead light switch to be closer to the door. Lighted mirror may not require light switch.R. Lanzetti