Attach 18 - Pre-Bid RFIs and Responses_.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Renovate Alert Rooms, 3390 Federal contract opportunity
- Solicitation number
- W50S8B22B0002
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| 108 Wing |
| Pre-Bid Questions & Clarifications |
| Solicitation #: | W50S8B-22-B-0002 |
| Project Name & Number: | PTFL19102 Repair Alert Rooms, 3390 |
| Updated: | Updated 14 July 2022 |
| RFI # | Submitted | Answered | Question | Response | Response By |
| 1 | 30-Jun-22 | 13-Jul-22 | Will the rooms be emptied before construction / will the furniture be removed from the rooms? | Yes, there are plans to have the furniture removed before construction. | R. Lanzetti |
| 2 | 30-Jun-22 | 13-Jul-22 | Can we install 1/4" gypsum board over the existing wallpaper in lieu of wallpaper removal? | No, concerned with difference between new gypsum board face and face of the door frames would not provide enough depth for the new Medium Density Fiberboard (MDF) Moulding. Window sill overhang is also very small. Concern with added work required to account for 1/4" spacing for the outlets and light switches. See attached pictures. | R. Lanzetti |
| 3 | 30-Jun-22 | 13-Jul-22 | What is the required / expected level of finish to the walls (Level 1, 2, 3, 4, or 5)? | These rooms had not been refinished in 24 years, so the final finish is important. The final wall finish should be a level 4 or 5 finish, with a primer and two coats of paint. See attachment for finish level definition. | R. Lanzetti |
| 4 | 05-Jul-22 | 13-Jul-22 | Who will be responsible to remove, store and reinstall existing furniture in rooms? | The personnel using the alert rooms have plans to remove and store the furniture. | R. Lanzetti |
| 5 | 05-Jul-22 | 13-Jul-22 | Will we be able to renovate all rooms at same time? | Yes, plans are being coordinated to allow all rooms to be renovated at the same time. | R. Lanzetti |
| 6 | 05-Jul-22 | 13-Jul-22 | There is a door to the exterior of building at end of corridor near kitchen, closest to room 1016, can this be used for access during construction activities? | Yes, though the door will be locked at the end of each workday. | R. Lanzetti |
| 7 | 05-Jul-22 | 13-Jul-22 | SOW calls for new ceiling tiles, please advise if the ceiling grid needs to be replaced also. | No, ceiling grid may be reused, or remain in place for new ceiling tiles. | R. Lanzetti |
| 8 | 05-Jul-22 | 13-Jul-22 | Does the door and frames get painted in these alert rooms? -Bathroom door, entry and closet doors? - If so both sides? | Doors are wood, or wood veneer, will not be touched or painted. |
Door frames will be repainted, on each side, a color selected by the occupants.
| R. Lanzetti | |||||
| 9 | 05-Jul-22 | 13-Jul-22 | Is there VWC inside the closets as well or just in the rooms? | Yes, there is currently Vinyl Wall Covering (VWC) or wallpaper on the inside walls of the closets. | R. Lanzetti |
| 10 | 11-Jul-22 | Please provide specs for the following trades: 1. LVT flooring; 2. Cove base (the SOW for cove base calls for MDF type trim) 3. Ceramic wall & Floor Tiles 4. Room darkening roman shades 5. Painting 6. All plumbing fixtures/toilet accessories as called for in para 4.2 for plumbing trade. | Response will be provided in a separate amendment | ||
| 11 | 12-Jul-22 | Can the government provide a basis of design for each of the fixtures provided in "Attach 05 - Alert Room Fixtures. | Response will be provided in a separate amendment | ||
| 12 | 12-Jul-22 | 14-Jul-22 | Is only the shower stall area receiving ceramic tile? | The floor tile and wall base tile will also be replaced with new tile. The only wall tile will be in the shower stall. | R. Lanzetti |
| 13 | 12-Jul-22 | 14-Jul-22 | What is the height of the new wood MDF base? | A common style for MDF trim is LWM-623, The height for this style is 3-1/4" x 1/2" x length. | R. Lanzetti |
| 14 | 12-Jul-22 | 14-Jul-22 | 4.2.4.3 is calling for two glass panels and one glass door. Are you looking for a frame-less glass enclosure? | ||
| Shower glass panels may have a frame, or be frameless. Either will be accepted. | R. Lanzetti | ||||
| 15 | 12-Jul-22 | 14-Jul-22 | Will the new lighted mirror switch be located by the overhead light switch? | ||
| Lighted mirror switch may be located by the overhead light switch. Overhead light switch to be closer to the door. | R. Lanzetti |