This document contains an RFI tracker and details of a federal contract solicitation for repair work at a main gate. The RFI tracker includes questions received from contractors between September 3-7 regarding the opportunity requirements, such as confirmation that no hazardous materials are present, responsibility for moving barriers, and basis of design information for the required gate. The attached solicitation is from the Department of the Army New Hampshire Army National Guard to repair the main gate at Pease Air National Guard Base under solicitation number W50S8A-21-B-5202. Bids are due by an unspecified date. The work includes demolition of the existing gate and construction of a new gate per the attached specification, plans and drawings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract to Offerors_update 17Sept21.pdf | ||
| Abstract to Offerors_main Gate.pdf | ||
| Bid Opening Sign in-sheet.pdf | ||
| NH20210025 16JUL21.pdf | ||
| Amendment 0002.pdf | ||
| Site Visit Sign in.pdf | ||
| PAS Attachment 1 Pre-Award Survery Questionnaire.docx | DOCX document | |
| PAS Attachment 2 Determination of Responsibility Document.docx | DOCX document | |
| PAS Attachment 3 Construction Contractor Experience Data.pdf | ||
| SF1442.pdf | ||
| Site visit map.pptx | PPTX presentation | |
| Amendment 0001.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Tracker
| SZCQ192390 Repair Main Gate | |||||||
| RFI Number | RFI Text | Date Received from CTR | COR Response Text | KO/KS Response Text | Sketch Posted (Title or N/A) | KO Initials | SAM.gov Date of Change |
| 1 | Can the Government confirm if the existing or new security gate system needs to have any security work through Advantor performed? | 3-Sep-21 | 4-Sep-21 | There is no work required by Advantor | NA | 9-Sep-21 | |
| 2 | Please confirm if there are any hazardous materials? | 3-Sep-21 | No hazardous materials have been reported. Pease is located on a known PFC contaminated aquifer with historically high levels of PFOA and PFAS. The contractor will follow the requirments of specification section 01 35 40, 3.4, c "Water Resources", (2) "Groundwater" | NA | 9-Sep-21 | ||
| 3 | Should taxes be carried in proposals? | 3-Sep-21 | New Hampshire does not have state taxes. | NA | 9-Sep-21 | ||
| 4 | Please confirm if any state, local or federal permits are required? | 3-Sep-21 | Comply with Specification Section 01 30 00, 1.12 "Permits" | NA | 9-Sep-21 | ||
| 5 | During the site visit we notice a lot of concrete jersey barriers. Please confirm who is responsible for removing, storing, and reinstalling them? | 3-Sep-21 | The NHANG will move the barriers and place them in the location as shown on sheet G-003 | NA | 9-Sep-21 | ||
| 6 | Drawing G-003 General Note 5 states to arrange for a NHANG security detail when the secure perimeter cannot be maintained. Please confirm if the detail is provided by the NHANG at a no cost to the contractor or are we to carry a cost for the detail? Also, if required more than ten days will there be a cost and if so how much? | 3-Sep-21 | As long the temporary fence (8' foot temporary security fence with a single strand of barbed wire, anchored to the pavement to prevent intruders from scaling or getting under the fence) is the first thing you accomplish before you start demolition then the security detail will not be required. This fence only applys to the fence in front of the existing gate. The fence behind the gate can be a standard fence with no special features. | NA | 9-Sep-21 | ||
| 7 | Can the Government provide boring logs? | 3-Sep-21 | Refer to Existing Keynote 19 on Sheet CX101 and 3/C-501 for available subsurface information. The depth to groundwater will vary due to seasonal and weather conditions. | NA | 9-Sep-21 | ||
| 8 | Fence contractors are having a tough time finding a gate that will comply with the specifications and drawings. Can the government provide a basis of design? | 3-Sep-21 | The basis of design is TyMetal Corporation www.tymetal.com 1-800-328-4283 | NA | 9-Sep-21 | ||
| 9 | |||||||
| 10 | |||||||
| 11 | |||||||
| 12 | |||||||
| 13 | |||||||
| 14 | |||||||
| 15 | |||||||
| 16 | |||||||
| 17 | |||||||
| 18 | |||||||
| 19 | |||||||
| 20 | |||||||
| 21 | |||||||
| 22 | |||||||
| 23 | |||||||
| 24 | |||||||
| 25 | |||||||
| 26 | |||||||
| 27 | |||||||
| 28 | |||||||
| 29 | |||||||
| 30 | |||||||
| 31 | |||||||
| 32 | |||||||
| 33 | |||||||
| 34 | |||||||
| 35 | |||||||
| 36 | |||||||
| 37 | |||||||
| 38 | |||||||
| 39 | |||||||
| 40 |