This document contains a pre-award survey questionnaire for Solicitation Number W50S8A-21-B-5202 to repair the main gate at Pease Air Force Base. The questionnaire asks the bidder questions about their understanding of project scope, equipment and personnel to be used, ownership and current use of equipment, ability to meet the performance period, work plan and schedule, any unusually restrictive or challenging requirements, understanding of contract line item resources, mobilization timeline, supplies and equipment availability, percentage of work to be self-performed or subcontracted, and names and resumes of key personnel including the project manager, superintendent, quality control manager, and safety officer.

View the file

Other files for this federal contract opportunity

Other files attached to Repair Main Gate, newest first.
File Type Posted
Abstract to Offerors_update 17Sept21.pdf PDF
Bid Opening Sign in-sheet.pdf PDF
Abstract to Offerors_main Gate.pdf PDF
W50S8A-21-B-5202 _RFI Tracker 9Sept21.xlsx XLSX spreadsheet
NH20210025 16JUL21.pdf PDF
Amendment 0002.pdf PDF
Site Visit Sign in.pdf PDF
PAS Attachment 2 Determination of Responsibility Document.docx DOCX document
PAS Attachment 3 Construction Contractor Experience Data.pdf PDF
SF1442.pdf PDF
Site visit map.pptx PPTX presentation
Amendment 0001.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Award Survey Questionnaire Solicitation Number W50S8A-21-B-5202 Repair Main Gate, Pease AFB

1. Do you understand the full scope of the project in which you have submitted a bid? Any work done within the same line of work and with whom?

2. Describe and list all the plant/equipment (include the size and name of the plant if applicable) that you intend to use in the construction of this contract. How do you intend to transport the plant/equipment? Where it is located now? Are you relocating any personnel for the duration of this project? How many employees are being temporarily relocated?

3. Do you own or lease the equipment? Please list equipment below.

4. Is the plant/equipment intended to be used in this contract being used in another job? Provide name of job, location and duration.

5. Have you put in a bid or will be bidding for any other job where you are also intending to use this equipment?

6. Are you aware of the required performance period for this contract? Do you think that you can meet this performance period without difficulty or its length has affected your bid? Please provide your schedule for completion of the project.

7. Description of your work plan to include production per day, equipment to be used, order of work, how many days/wk and hrs/day you will be working?

8. Were there any contract requirements or project conditions that you found to be overly restrictive or exceptionally challenging, that would require extra resources or effort and that would be considered beyond what would normally be expected on this type of work? If so, which bid items were affected?

9. Do you completely understand the scope of work that is included for each CLIN? Could you explain the resources that are included in each CLIN?

10. If awarded the contract, when do you plan to mobilize?

11. Do you have all of the supplies and equipment needed to execute this job within the time allowed under this contract?

12. Are you aware of what percent of work you shall perform on the site with your own organization under this contract? Do you have any plan to subcontract any work? If so, name portion of work, subcontractor and what percentage of work?

13. Provide the names and brief resumes of the following personnel.

Project Manager: _____________________________ Superintendent: _____________________________ Quality Control Manager: _____________________________ Safety Officer: _____________________________ NOTE: Nothing discussed or stated during the pre-award survey shall be construed as a modification to the requirements of the solicitation. The Contractor will be held responsible for performing the work as stated in the solicitation if selected as the contractor.