Abstract to Offerors_update 17Sept21.pdf
PDF 802 KB Posted
- Attached to
- Repair Main Gate Federal contract opportunity
- Solicitation number
- W50S8A-21-B-5202
About this file
This abstract of offers summarizes four bids received in response to Solicitation Number W50S8A-21-B-5202 issued by the Department of the Army New Hampshire Army National Guard. The solicitation sought bids for repairs to the main gate at an estimated cost of $506,144. Bids were received from KMK Construction, Inc. at $915,378.51; Perimeter Sec. Partners at $974,025; Scott L Ballweg at $974,025; and Cornerstone P&S at $989,000. The government estimate for the project was $974,025.
The related federal contract opportunity provided additional details regarding Solicitation Number W50S8A-21-B-5202. Specifically, the solicitation was issued by the Department of the Army New Hampshire Army National Guard to repair the main gate and included attached specification plans and drawings. Bidders were instructed that the site visit date, time, security information and location were identified in the SF1442 form.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract to Offerors_main Gate.pdf | ||
| Bid Opening Sign in-sheet.pdf | ||
| W50S8A-21-B-5202 _RFI Tracker 9Sept21.xlsx | XLSX spreadsheet | |
| NH20210025 16JUL21.pdf | ||
| Amendment 0002.pdf | ||
| Site Visit Sign in.pdf | ||
| PAS Attachment 1 Pre-Award Survery Questionnaire.docx | DOCX document | |
| PAS Attachment 2 Determination of Responsibility Document.docx | DOCX document | |
| PAS Attachment 3 Construction Contractor Experience Data.pdf | ||
| SF1442.pdf | ||
| Site visit map.pptx | PPTX presentation | |
| Amendment 0001.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
NGB 2021 C-42
W50S8A-21-B-5202
USPFO, NH National Guard Joint Contracting Office
16 Sept 2021 1 2
001 Repair Main Gate 1 Job $506,144.00 $506,144.00 $915,378.51
Total Price $506,144.00 $915,378.51
$974,025.00 $974,025.00
$974,025.00
Scott L Ballweg, Chief of Contracting Office
16 Sept 2021
Repair Main Gate Project Number: SZCQ192390
20%
KMK Construction, Inc.
20%
Perimeter Sec. Partners
$915,378.51 scott.ballweg Typewritten Text
& KO
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
NGB 2021 C-43
001 Job1 $989,000.00 $989,000.00
Total Price $1,269,000.00
$1,269,000.00 $1,269,000.00 $1,327,000.00 $1,327,000.00
$1,327,000.00$989,000.00 $1,759,500.00
$1,759,500.00$1,759,500.00
2 2
Cornerstone P&SRepair Main Gate
SZCQ192390
W50S8A-21-B-5202
20% & $3M
Tantra
2 2
20% & $3M
Careno Construction Company
20%20%
| 2021-09-17T10:58:47-0400 | |
| BALLWEG.SCOTT.LAWRENCE.1006466326 |
File details come from the government source that posted it. Updated .