This document is a Questions and Answers (Q&A) document related to Solicitation No. W50S85-24-Q-0005 for Gray Water Removal Exercise Northern Strike 24-2 at Camp Grayling Joint Maneuver Training Center in Michigan.
The solicitation is seeking a contractor to provide professional services, supervision, equipment, vehicles, labor, tools, quality control, storage, transportation, and supplies for the daily supply of clean potable water, collection, and transportation of gray water from various training sites to a water treatment plant. The period of performance is July 16 to August 24, 2024, with set up from July 16-23, services from July 24 to August 18, and tear down/pack up from August 19-24. The solicitation indicates that services are estimated to support no more than 15 locations. The contractor must have proper HAZMAT waste certification as outlined by the Department of Health Services and Camp Grayling Environmental Office to transport the gray water over public roads.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ques�ons & Answers Solicita�on No. W50S85-24-Q-0005 – Gray Water Removal
Exercise Northern Strike 24-2 – Camp Grayling Joint Maneuver Training Center, MI
Q1. With regards to the potable water, will Camp Grayling be providing the potable water with their water cer�fica�ons?
A1. Yes, there are points available on loca�on for both potable and nonpotable water as long as it is in support of military units.
Q2. Is the bid just for containment and removal of gray water?
A2. That is the primary purpose, however, in the event a unit cannot transport their own water it would be requested for a refresh of water in addi�on to the pickup of gray water.
Q3. Reference [4.2 Containers to capture Graywater.] Can a more detailed descrip�on be provided?
A3. This is primarily in support of units conduc�ng field feeding which requires the means to dispose of the waste water that is typically discharged via a large hose. The container would need to be able to accommodate this. The 464 QM preference is 2 each 2,000 gallon tanks in support of their shower/laundry opera�ons. With 10% increase the preference would be for 2,200 gallon tanks to avoid spillage.
Q4. Reference [5.3 Provide containers at each site that are at a minimum 10% larger capacity than the es�mated gallons to be removed each day.] Can a more detailed descrip�on be provided?
A4. Th This is primarily in support of units conduc�ng field feeding which requires the means to dispose of the waste water that is typically discharged via a large hose. The container would need to be able to accommodate this. The 464 QM is reques�ng 2 each 2,000 gallon tanks in support of their shower/laundry opera�ons.
Q5. Reference [4.3 Fresh potable water.] Is the vendor permited to access potable water available on site?
A5. Yes, there are points available on loca�on for both potable and nonpotable water as long as it is in support of military units in this contract.
Q6. Reference [5.1 Daily supply clean potable water, collect and transport Graywater to Government iden�fied loca�ons on Camp Grayling and Grayling Airforce Base.} What size tanks/containers are needed for this and how many?
A6. Please see updated graywater excel sheet for daily averages document.
Q7. Reference [5.3 Provide containers at each site that are at a minimum 10% larger capacity than the es�mated gallons to be removed each day.] Can the daily capacity of each group be provided in order to accommodate this requirement?
A7. Provided in updated excel document – Graywater with Daily Averages.
Q8. Reference [4.5 HAZMAT waste cer�fica�on as outlined by the Department of Health Services and Camp Grayling Environmental Office.] Also reference [5.4 Contractor shall be required to have proper HAZMAT waste cer�fica�on as outlined by the Department of Health Services and Camp Grayling Environmental Office in order to transport Graywater over public roads. Publica�on CG Regula�on 200-1 Environmental Protec�on and Enhancement will be provided.] The State of MI does not require HAZMAT for gray/black water removal therefore a licensed septage haulers for the State of MI should be adequate, correct?
A8. Correct. This will not require black water removal as it is for field feeding and in the field shower/laundry.