04-Sup02 Form 66 mod.pdf

PDF 66 KB Posted

Attached to
VGLZ 232024 Demolition of B-1405
Solicitation number
W50S8524B0014
Issued by

About this file

This document is a Schedule of Material Submittals (AF Form 66 Modified) for Project No. VGLZ 232024, which involves the demolition of Building 1405. The project has a 180-calendar day period of performance after the Notice to Proceed. It is a 100% Small Business set-aside with a NAICS code of 238910 (Site Preparation Contractors) and a $19.0 million size standard.

The key details of the required submittals include items such as an Affirmative Procurement Reporting Form, Key Personnel List, Progress Schedule, Construction Schedule, various test reports and permits, certifications, warranties, record drawings, and punch list. The document also indicates that the solicitation and related information will be posted on SAM.gov, and that funding for the contract is anticipated to become available prior to September 30, 2024.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

VGLZ 232024

APPROVED DISAPPROVED

1 Affirmative Procurement Reporting Form X

2 Key Personnel List X

3 Submittal Schedule (AF 66, Contractor Modified) X

4 Progress Schedule, Af 3064 X

5 Schedule of Values X

6 Joint Progress Report, AF 3065 X

7 Construction Schedule (sequence of construction) X

8 OSHA Trained Represenative and Certification X

9 Industrial Hygienist and Certification X

10 Burn Permit X

11 Test Reports: Hazardous Materials X

12 Test Reports: Soil Compaction X

13 Recycling and Disposal Form X

14 Pre-excavation photographs X

15 Excavation Plan X

16 Excavating Permit X

17 SANGB Form 23 X

18 Radioactive Source Permit X

19 Solid Waste Disposal and Diversion Tracking Form. X

20 Lamp Removal Work Plan X

21 PCB and Lamp Disposal Plan X

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O

U T

SOLICITATION/CONTRACT NO.PROJECT TITLE

Demolition of Building 1405

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

M

AT

ER

IA

L o r

D

AT

A

SH

O

P D

R

AW

IN

G

S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

22 NESHAP Notification and/or Notification IDs X

23 Form 5 Tank Inspections X

24 Form 6 Tank, Drum, Totes X

25 Soil Analysis Report X

26 Soil Erosion Plan X

27 Soil Analysis Report X

28 DD Form 1354 X

29 O&M Data Spreadsheet X

30 Warranty X

31 Punch List X

32 Substantial Conpletion Request X

33 Record Drawings and specifications X

34 Sod or Seed Mix X X

35 Soil Mix X X

File details come from the government source that posted it. Updated .