This document is a Schedule of Material Submittals (AF Form 66 Modified) for Project No. VGLZ 232024, which involves the demolition of Building 1405. The project has a 180-calendar day period of performance after the Notice to Proceed. It is a 100% Small Business set-aside with a NAICS code of 238910 (Site Preparation Contractors) and a $19.0 million size standard.
The key details of the required submittals include items such as an Affirmative Procurement Reporting Form, Key Personnel List, Progress Schedule, Construction Schedule, various test reports and permits, certifications, warranties, record drawings, and punch list. The document also indicates that the solicitation and related information will be posted on SAM.gov, and that funding for the contract is anticipated to become available prior to September 30, 2024.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
VGLZ 232024
APPROVED DISAPPROVED
1 Affirmative Procurement Reporting Form X
2 Key Personnel List X
3 Submittal Schedule (AF 66, Contractor Modified) X
4 Progress Schedule, Af 3064 X
5 Schedule of Values X
6 Joint Progress Report, AF 3065 X
7 Construction Schedule (sequence of construction) X
8 OSHA Trained Represenative and Certification X
9 Industrial Hygienist and Certification X
10 Burn Permit X
11 Test Reports: Hazardous Materials X
12 Test Reports: Soil Compaction X
13 Recycling and Disposal Form X
14 Pre-excavation photographs X
15 Excavation Plan X
16 Excavating Permit X
17 SANGB Form 23 X
18 Radioactive Source Permit X
19 Solid Waste Disposal and Diversion Tracking Form. X
20 Lamp Removal Work Plan X
21 PCB and Lamp Disposal Plan X
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U T
SOLICITATION/CONTRACT NO.PROJECT TITLE
Demolition of Building 1405
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L o r
D
AT
A
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D
AT
IO
N
S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
22 NESHAP Notification and/or Notification IDs X
23 Form 5 Tank Inspections X
24 Form 6 Tank, Drum, Totes X
25 Soil Analysis Report X
26 Soil Erosion Plan X
27 Soil Analysis Report X
28 DD Form 1354 X
29 O&M Data Spreadsheet X
30 Warranty X
31 Punch List X
32 Substantial Conpletion Request X
33 Record Drawings and specifications X
34 Sod or Seed Mix X X
35 Soil Mix X X