RFI LOG W50S8524B0002.pdf
PDF 93 KB Posted
- Attached to
- VGLZ 212001 REPAIR B34 SIMULATOR HVAC SYSTEM
- Solicitation number
- W50S8524B0002
About this file
This document is a Request for Information (RFI) regarding the VGLZ 212001 REPAIR SIMULATOR HEATING, VENTILATION, AIR CONDITIONING B34 solicitation.
The RFI provides responses to two questions. The first question asks if there are any "Brand Name Justifications" for the equipment listed, to which the answer is no, beyond the need for compatibility with the existing DDC system. The second question relates to the 80-120 week lead time for the project's transformer, which has been updated via Amendment 01 to remove the transformer requirement.
The related federal contract opportunity is a solicitation for the VGLZ 212001 REPAIR B34 SIMULATOR HVAC SYSTEM project. The solicitation has a period of performance of 365 calendar days after the Notice to Proceed, is set aside for 100% Small Business, and has a NAICS code of 238220 (Plumbing, Heating, and Air-Conditioning Contractors) with a size standard of $19.0 Million. The project magnitude is between $1,000,000.00 and $5,000,000.00, and proposals are due by the date specified in the solicitation and any amendments. A pre-bid conference and site visit are highly encouraged. An original bid bond is required with the bid.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI LOG W50S8524B0002VGLZ 212001 REPAIR SIMULATOR HEATING, VENTILATION, AIR CONDITIONING
B34
1. Are there any “Brand Name Jus fica ons” for the equipment listed on Sheet M‐701?
A1. No there are not any brand name jus fica ons beyond that for the DDC system. The
Contractor is instructed to assure any new system is compa ble with ours. That can be done by other systems.
2. Regarding B34 simulator project transformer, it has a lead me of 80‐120 weeks + 16 weeks of shop drawings prepara on + Govt review and approval me. Project will go substan al past the allocated POP. Please review and revise.
A2: There are no transformer requirements. The project descrip on paragraph in SECTION 00
21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS has been updated via
Amendment 01.
File details come from the government source that posted it. Updated .