VGLZ 182032, PROJECT TITLE Preventative Maintenance of Hazardous Waste Sheds SELFRIDGE ANGB, MI
RFIs COA 7/7/2020 Prepared by: A. Vermeersch
Item # Question Answer
1 Will the Containment wells under the floor grating be required to be painted?
No. Per Addendum #1 dated 7/7/2020.
Interior of the containers is no longer included in the SOW.
2 Will the Galvanized Floor Grates be required to be painted?
No. Per Addendum #1 dated 7/7/2020.
Painting Interior of the containers is no longer included in the SOW.
3 Does the Government have any information on the actual weight of the units?
USG does not have weight of the container available. Lifting of the units is not required. Per Addendum #1 dated 7/7/2020. Painting exterior underside of the containers is no longer included in the
SOW.
4 Will the underside of the chemical storage containers be required to be painted?
Per Addendum #1 dated 7/7/2020. Painting exterior underside of the containers is no longer included in the SOW.
5 I noticed that the larger units are not adequately grounded. Please advise?
No action required as a part of this contract.
6 Please clarify all new labeling will be provided by Government. Contractor to install
Per Addendum #1 dated 7/7/2020.
Reinstallation of labels NOT is required.
USG will remove labels that will be reinstalled. All others are to be removed with the corrosion.
7 Can our construction materials be stored inside the units as they are being worked on?
Contractors can use this as an option but will not be issued a key. This methodology may prove inconvenient, but is available if they choose.