SELFRIDGE ANGB, MICHIGAN
09 91 13 1 EXTERIOR PAINTING
SECTION 09 91 13 - EXTERIOR PAINTING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes surface preparation and the application of paint systems on exterior substrates.
B. Related Requirements:
1. Division 05 Sections for shop priming of metal substrates with primers specified in this Section.
2. Division 06 Sections for shop priming carpentry with primers specified in this Section.
3. Division 08 Sections for factory priming windows and doors with primers specified in this Section.
4. Section 09 91 23, Interior Painting, for surface preparation and the application of paint systems on interior substrates.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product. Include preparation requirements and application instructions.
B. LEED Submittals:
1. Refer to Section 01 81 13, Sustainable Design Requirements, for information regarding LEED® submission requirements.
2. The Contractor and/or Subcontractor shall submit the following information under a separate tab for LEED information.
a. A complete list materials.
b. Material costs for each material listed. Material costs shall not include installation or shipping costs.
c. Location of material manufacturer.
d. Location of material extraction/harvest.
e. Post-consumer and pre-consumer recycled content of each material.
C. Samples for Verification: For each type of paint system and each color and gloss of topcoat.
1. Submit Samples on rigid backing, 8 inches (200 mm) square.
09 91 13 2 EXTERIOR PAINTING
2. Step coats on Samples to show each coat required for system.
3. Label each coat of each Sample.
4. Label each Sample for location and application area.
D. Product List: For each product indicated, include the following:
1. Cross-reference to paint system and locations of application areas. Use same designations indicated on Drawings and in schedules.
2. Printout of current "MPI Approved Products List" for each product category specified, with the proposed product highlighted.
3. VOC content.
1.4 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Paint: 5 percent, but not less than 1 gal. (3.8 L) of each material and color applied.
1.5 QUALITY ASSURANCE
A. Mockups: Apply mockups of each paint system indicated and each color and finish selected to verify preliminary selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.
1. COR will select one surface to represent surfaces and conditions for application of each paint system specified in Part 3.
a. Vertical and Horizontal Surfaces: Provide samples of at least 100 sq. ft. (9 sq. m).
b. Other Items: COR will designate items or areas required.
2. Final approval of color selections will be based on mockups.
a. If preliminary color selections are not approved, apply additional mockups of additional colors selected by COR at no added cost to Contracting Officer.
3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless COR specifically approves such deviations in writing.
4. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F (7 deg C).
09 91 13 3 EXTERIOR PAINTING
1. Maintain containers in clean condition, free of foreign materials and residue.
2. Remove rags and waste from storage areas daily.
1.7 FIELD CONDITIONS
A. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F (10 and 35 deg C).
B. Do not apply paints in snow, rain, fog, or mist; when relative humidity exceeds 85 percent; at temperatures less than 5 deg F (3 deg C) above the dew point; or to damp or wet surfaces.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
B.
1. Sherwin-Williams Company (The).
2. Behr Process Corporation.
3. Benjamin Moore & Co.
4. Bennette Paint Manufacturing Company, Inc.
5. Color Wheel Paints & Coatings.
6. Columbia Paint & Coatings.
7. Coronado Paint.
8. Davis Paint Company.
9. Del Technical Coatings.
10. Durant Performance Coatings.
11. General Paint.
12. ICI Paints.
13. Kelly-Moore Paints.
14. Kwal Paint.
15. Miller Paint.
16. PARA Paints.
17. PPG Architectural Finishes, Inc.
18. Pratt & Lambert.
19. Vista Paint.
2.2 PAINT, GENERAL
A. MPI Standards: Provide products that comply with MPI standards indicated and that are listed in its "MPI Approved Products List."
B. Material Compatibility:
09 91 13 4 EXTERIOR PAINTING
1. Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.
2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.
C. VOC Content: Provide materials that comply with VOC limits of authorities having jurisdiction.
D. Colors: As indicated in a color schedule.
2.3 METAL PRIMERS
A. Primer, Alkyd, Anti-Corrosive for Metal: MPI #79.
1. VOC Content: E Range of E1.
B. Primer, Alkyd, Quick Dry, for Metal: MPI #76.
1. VOC Content: E Range of E1.
C. Primer, Quick Dry, for Aluminum: MPI #95.
1. VOC Content: E Range of E1.
2.4 WATER-BASED PAINTS
A. Latex, Exterior Semi-Gloss (Gloss Level 5): MPI #11.
1. VOC Content: E Range of E1.
2.5 SOLVENT-BASED PAINTS
A. Alkyd, Exterior, Semi-Gloss (Gloss Level 5): MPI #94.
1. VOC Content: E Range of E1.
2.6 ALUMINUM PAINT
A. Aluminum Paint: MPI #1.
1. VOC Content: E Range of E1.
2.7 SOURCE QUALITY CONTROL
09 91 13 5 EXTERIOR PAINTING
A. Testing of Paint Materials: Contracting Officer reserves the right to invoke the following procedure:
1. Contracting Officer will engage the services of a qualified testing agency to sample paint materials. Contractor will be notified in advance and may be present when samples are taken. If paint materials have already been delivered to Project site, samples may be taken at Project site. Samples will be identified, sealed, and certified by testing agency.
2. Testing agency will perform tests for compliance with product requirements.
3. Contracting Officer may direct Contractor to stop applying paints if test results show materials being used do not comply with product requirements. Contractor shall remove noncomplying paint materials from Project site, pay for testing, and repaint surfaces painted with rejected materials. Contractor will be required to remove rejected materials from previously painted surfaces if, on repainting with complying materials, the two paints are incompatible.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.
B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:
1. Concrete: 12 percent.
C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.
D. Proceed with coating application only after unsatisfactory conditions have been corrected.
1. Application of coating indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Comply with manufacturer's written instructions and recommendations in "MPI Manual" applicable to substrates and paint systems indicated.
B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.
1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection.
09 91 13 6 EXTERIOR PAINTING
C. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and incompatible paints and encapsulants.
1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce paint systems indicated.
D. Concrete Substrates: Remove release agents, curing compounds, efflorescence, and chalk. Do not paint surfaces if moisture content or alkalinity of surfaces to be painted exceeds that permitted in manufacturer's written instructions.
E. Steel Substrates: Remove rust, loose mill scale, and shop primer if any. Clean using methods recommended in writing by paint manufacturer.
F. Shop-Primed Steel Substrates: Clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with the same material as used for shop priming to comply with SSPC-PA 1 for touching up shop-primed surfaces.
G. Galvanized-Metal Substrates: Remove grease and oil residue from galvanized sheet metal by mechanical methods to produce clean, lightly etched surfaces that promote adhesion of subsequently applied paints.
H. Aluminum Substrates: Remove loose surface oxidation.
3.3 APPLICATION
A. Apply paints according to manufacturer's written instructions and recommendations in "MPI Manual."
1. Use applicators and techniques suited for paint and substrate indicated.
2. Paint surfaces behind movable items same as similar exposed surfaces. Before final installation, paint surfaces behind permanently fixed items with prime coat only.
3. Paint both sides and edges of exterior doors and entire exposed surface of exterior door frames.
4. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.
5. Primers specified in painting schedules may be omitted on items that are factory primed or factory finished if acceptable to topcoat manufacturers.
B. Tint undercoats same color as topcoat, but tint each undercoat a lighter shade to facilitate identification of each coat if multiple coats of same material are to be applied. Provide sufficient difference in shade of undercoats to distinguish each separate coat.
C. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.
D. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.
09 91 13 7 EXTERIOR PAINTING
3.4 FIELD QUALITY CONTROL
A. Dry Film Thickness Testing: Government may engage the services of a qualified testing and inspecting agency to inspect and test paint for dry film thickness.
1. Contractor shall touch up and restore painted surfaces damaged by testing.
2. If test results show that dry film thickness of applied paint does not comply with paint manufacturer's written recommendations, Contractor shall pay for testing and apply additional coats as needed to provide dry film thickness that complies with paint manufacturer's written recommendations.
3.5 CLEANING AND PROTECTION
A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.
B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by COR, and leave in an undamaged condition.
D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.
3.6 EXTERIOR PAINTING SCHEDULE
A. Steel Substrates:
1. Alkyd System:
a. Prime Coat: Primer, alkyd, anticorrosive for metal, MPI #79.
b. Prime Coat: Shop primer specified in Division 05 Section where substrate is specified.
c. Intermediate Coat: Exterior alkyd enamel matching topcoat.
d. Topcoat: Alkyd, exterior, semi-gloss (Gloss Level 5), MPI #94.
2. Aluminum Paint System:
a. Prime Coat: Primer, alkyd, anti-corrosive for metal, MPI #79.
b. Prime Coat: Shop primer specified in Division 05 Section where substrate is specified.
c. Intermediate Coat: Aluminum paint, MPI #1.
d. Topcoat: Aluminum paint, MPI #1.
09 91 13 8 EXTERIOR PAINTING
B. Aluminum Substrates:
1. Alkyd System:
a. Prime Coat: Primer, quick dry, for aluminum, MPI #95.
b. Intermediate Coat: Exterior alkyd enamel matching topcoat.
c. Topcoat: Alkyd, exterior, semi-gloss (Gloss Level 5), MPI #94.
END OF SECTION 09 91 13
09 91 23 1 INTERIOR PAINTING
SECTION 09 91 23 - INTERIOR PAINTING
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes surface preparation and the application of paint systems on the following interior substrates:
1. Concrete.
2. Concrete masonry units (CMU).
3. Steel.
4. Wood.
5. Gypsum board.
6. Spray-textured ceilings.
B. Related Sections: Division 05 Sections for shop priming of metal substrates with primers specified in this Section.
1.3 SUBMITTALS
A. Product Data: Paint Schedule indicating total paint system per substrate as indicated on Finish Schedule for each type of product indicated. Schedule must include MSDS Sheet as well as product data for each paint material.
B. Samples for Initial Selection: For each type of topcoat product indicated.
C. Product List: For each product indicated, include the following:
1. Cross-reference to paint system and locations of application areas. Use same designations indicated on Drawings and in schedules.
2. Printout of current "MPI Approved Products List" for each product category specified in Part 2, with the proposed product highlighted.
D. LEED Submittals:
1. Refer to Section 01 81 13, Sustainable Design Requirements, for information regarding LEED® submission requirements.
2. The Contractor and/or Subcontractor shall submit the following information under a separate tab for LEED information.
09 91 23 2 INTERIOR PAINTING
a. A complete list materials.
b. Material costs for each material listed. Material costs shall not include installation or shipping costs.
c. Location of material manufacturer.
d. Location of material extraction/harvest.
e. Post-consumer and pre-consumer recycled content of each material.
f. Product Data for Credit EQ 4.2: For paints and coatings used inside the building envelope during construction provide manufacturer’s literature documenting VOC content of each product submitted. VOC content shall comply with requirements of credit EQc4.2.
1.4 QUALITY ASSURANCE
A. MPI Standards (Master Painters Institute):
1. All materials, preparations and workmanship shall conform to the requirements of the latest edition of the Architectural Painting Specification Manual by MPI. All paint manufacturers and products used shall be as listed under the Approved Product List of MPI.
2. Painting work shall be in accordance with MPI premium grade finish.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F (7 deg C).
1. Maintain containers in clean condition, free of foreign materials and residue.
2. Remove rags and waste from storage areas daily.
1.6 PROJECT CONDITIONS
A. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F (10 and 35 deg C).
B. Do not apply paints when relative humidity exceeds 85 percent; at temperatures less than 5 deg F (3 deg C) above the dew point; or to damp or wet surfaces.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Sherwin-Williams Company (The).
2. Benjamin Moore & Co.
3. ChemRex.
09 91 23 3 INTERIOR PAINTING
4. Columbia Paint & Coatings.
5. Davis Paint Company.
6. Duron, Inc.
7. Envirocoat Technologies Inc.
8. ICI Paints.
9. Iowa Paint Manufacturing Company, Inc.
10. Kelly-Moore Paints.
11. M.A.B. Paints.
12. McCormick Paints.
13. Porter Paints.
14. PPG Architectural Finishes, Inc.
2.2 PAINT, GENERAL
A. Material Compatibility:
1. Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.
2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.
B. VOC Content of Field-Applied Interior Paints and Coatings: Provide products that comply with the following limits for VOC content, exclusive of colorants added to a tint base, when calculated according to 40 CFR 59, Subpart D (EPA Method 24); these requirements do not apply to paints and coatings that are applied in a fabrication or finishing shop:
1. Flat Paints, Coatings, and Primers: VOC content of not more than 50 g/L.
2. Nonflat Paints, Coatings, and Primers: VOC content of not more than 150 g/L.
3. Anti-Corrosive and Anti-Rust Paints Applied to Ferrous Metals: VOC not more than 250 g/L.
4. Floor Coatings: VOC not more than 100 g/L.
5. Shellacs, Clear: VOC not more than 730 g/L.
6. Shellacs, Pigmented: VOC not more than 550 g/L.
7. Flat Topcoat Paints: VOC content of not more than 50 g/L.
8. Nonflat Topcoat Paints: VOC content of not more than 150 g/L.
9. Anti-Corrosive and Anti-Rust Paints Applied to Ferrous Metals: VOC not more than 250 g/L.
10. Floor Coatings: VOC not more than 100 g/L.
11. Shellacs, Clear: VOC not more than 730 g/L.
12. Shellacs, Pigmented: VOC not more than 550 g/L.
13. Primers, Sealers, and Undercoaters: VOC content of not more than 200 g/L.
14. Dry-Fog Coatings: VOC content of not more than 400 g/L.
15. Zinc-Rich Industrial Maintenance Primers: VOC content of not more than
340 g/L.
16. Pre-Treatment Wash Primers: VOC content of not more than 420 g/L.
C. Chemical Components of Field-Applied Interior Paints and Coatings: Provide topcoat paints and anti-corrosive and anti-rust paints applied to ferrous metals that comply with the following
09 91 23 4 INTERIOR PAINTING
chemical restrictions; these requirements do not apply to paints and coatings that are applied in a fabrication or finishing shop:
1. Aromatic Compounds: Paints and coatings shall not contain more than
1.0 percent by weight of total aromatic compounds (hydrocarbon compounds containing one or more benzene rings).
2. Restricted Components: Paints and coatings shall not contain any of the following:
a) Acrolein.
b) Acrylonitrile.
c) Antimony.
d) Benzene.
e) Butyl benzyl phthalate.
f) Cadmium.
g) Di (2-ethylhexyl) phthalate.
h) Di-n-butyl phthalate.
i) Di-n-octyl phthalate.
j) 1,2-dichlorobenzene.
k) Diethyl phthalate.
l) Dimethyl phthalate.
m) Ethylbenzene.
n) Formaldehyde.
o) Hexavalent chromium.
p) Isophorone.
q) Lead.
r) Mercury.
s) Methyl ethyl ketone.
t) Methyl isobutyl ketone.
u) Methylene chloride.
v) Naphthalene.
w) Toluene (methylbenzene).
x) 1,1,1-trichloroethane.
y) Vinyl chloride.
D. Colors: As indicated in a color schedule.
2.3 BLOCK FILLERS
A. Interior/Exterior Latex Block Filler: MPI #4.
1. VOC Content: E Range of E2.
2.4 PRIMERS/SEALERS
A. Interior Latex Primer/Sealer: MPI #50.
1. VOC Content: E Range of E1.
2. Environmental Performance Rating: EPR 1.
09 91 23 5 INTERIOR PAINTING
2.5 METAL PRIMERS
A. Alkyd Anticorrosive Metal Primer: MPI #79.
1. VOC Content: E Range of E1.
B. Quick-Drying Alkyd Metal Primer: MPI #76.
1. VOC Content: E Range of E1.
2.6 LATEX PAINTS
A. High-Performance Architectural Latex (Satin): MPI #140 (Gloss Level 4).
1. VOC Content: E Range of E1.
2. Environmental Performance Rating: EPR 4.5.
B. High-Performance Architectural Latex (Semigloss): MPI #141 (Gloss Level 5).
1. VOC Content: E Range of E1.
2. Environmental Performance Rating: PR 5.
2.7 ALKYD PAINTS
A. Interior Alkyd (Eggshell): MPI #51 (Gloss Level 3).
1. VOC Content: E Range of E1.
B. Interior Alkyd (Semigloss): MPI #47 (Gloss Level 5).
1. VOC Content: E Range of E1.
2. Environmental Performance Rating: EPR 1.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of work.
B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:
1. Concrete: 12 percent.
2. Masonry (Clay and CMU): 12 percent.
3. Wood: 15 percent.
4. Gypsum Board: 12 percent.
09 91 23 6 INTERIOR PAINTING
C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.
D. Begin coating application only after unsatisfactory conditions have been corrected and surfaces are dry.
1. Beginning coating application constitutes Contractor's acceptance of substrates and conditions.
3.2 PREPARATION
A. Comply with manufacturer's written instructions and recommendations in "MPI Architectural Painting Specification Manual" applicable to substrates indicated.
B. Remove plates, machined surfaces, and similar items already in place that are not to be painted.
If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.
1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection if any.
2. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.
C. Clean substrates of substances that could impair bond of paints, including dirt, oil, grease, and incompatible paints and encapsulants.
1. Remove incompatible primers and reprime substrate with compatible primers as required to produce paint systems indicated.
D. Concrete Masonry Substrates: Remove efflorescence and chalk. Do not paint surfaces if moisture content or alkalinity of surfaces to be painted exceeds that permitted in manufacturer's written instructions.
E. Steel Substrates: Remove rust and loose mill scale. Clean using methods recommended in writing by paint manufacturer.
F. Gypsum Board Substrates: Do not begin paint application until finishing compound is dry and sanded smooth.
G. Spray-Textured Ceiling Substrates: Do not begin paint application until surfaces are dry.
3.3 APPLICATION
A. Apply paints according to manufacturer's written instructions.
1. Use applicators and techniques suited for paint and substrate indicated.
2. Paint surfaces behind movable equipment and furniture same as similar exposed surfaces. Before final installation, paint surfaces behind permanently fixed equipment or furniture with prime coat only.
09 91 23 7 INTERIOR PAINTING
3. Paint front and backsides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces.
B. Tint each undercoat a lighter shade to facilitate identification of each coat if multiple coats of same material are to be applied. Tint undercoats to match color of topcoat, but provide sufficient difference in shade of undercoats to distinguish each separate coat.
C. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.
D. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.
E. Painting Mechanical and Electrical Work: Paint items exposed in equipment rooms and occupied spaces including, but not limited to, the following:
1. Mechanical Work:
a) Uninsulated metal piping.
b) Uninsulated plastic piping.
c) Pipe hangers and supports.
d) Tanks that do not have factory-applied final finishes.
e) Visible portions of internal surfaces of metal ducts, without liner, behind air inlets and outlets.
f) Duct, equipment, and pipe insulation having cotton or canvas insulation covering or other paintable jacket material.
g) Mechanical equipment that is indicated to have a factory-primed finish for field painting.
2. Electrical Work:
a) Switchgear.
b) Panelboards.
c) Electrical equipment that is indicated to have a factory-primed finish for field painting.
3.4 FIELD QUALITY CONTROL
A. Testing of Paint Materials: Contracting Officer reserves the right to invoke the following procedure at any time and as often as Contracting Officer deems necessary during the period when paints are being applied:
1. Contracting Officer will engage the services of a qualified testing agency to sample paint materials being used. Samples of material delivered to Project site will be taken, identified, sealed, and certified in presence of Contractor.
2. Testing agency will perform tests for compliance with product requirements.
3. Contracting Officer may direct Contractor to stop applying paints if test results show materials being used do not comply with product requirements. Contractor shall remove noncomplying-paint materials from Project site, pay for testing, and repaint surfaces painted with rejected materials. Contractor will be required to
09 91 23 8 INTERIOR PAINTING
remove rejected materials from previously painted surfaces if, on repainting with complying materials, the two paints are incompatible.
3.5 CLEANING AND PROTECTION
A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.
B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Contracting Officer, and leave in an undamaged condition.
D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.
3.6 INTERIOR PAINTING SCHEDULE (PAINT SYSTEMS)
A. CMU Substrates:
1. PS1-Alkyd Over Latex Sealer System: MPI INT 4.2N.
a. Prime Coat: Interior/exterior latex block filler.
b. Sealer Coat: Interior latex primer/sealer.
c. Intermediate Coat: Interior alkyd matching topcoat.
d. Topcoat: Interior alkyd semigloss.
B. Steel Substrates:
1. PS2-Alkyd System: MPI INT 5.1E.
a. Prime Coat: Alkyd anticorrosive metal primer.
b. Intermediate Coat: Interior alkyd matching topcoat.
c. Topcoat: Interior alkyd semigloss (MPI 5.3B).
d. Scheduled for metal door frames and relight window units.
2. PS3-High-Performance Architectural Latex System: MPI INT 6.3A.
a. Prime Coat: Interior latex-based wood primer.
b. Intermediate Coat: High-performance architectural latex matching topcoat.
c. Topcoat: High-performance architectural latex (satin).
C. Gypsum Board Substrates:
1. PS4-Alkyd Over Latex Primer System: MPI INT 9.2C.
a. Prime Coat: Interior latex primer/sealer.
09 91 23 9 INTERIOR PAINTING
b. Intermediate Coat: Interior alkyd matching topcoat.
c. Topcoat: Interior alkyd eggshell.
2. PS5-Alkyd Over Latex Primer System: MPI INT 9.2C.
a. Prime Coat: Interior latex primer/sealer.
b. Intermediate Coat: Interior alkyd matching topcoat.
c. Topcoat: Interior alkyd gloss.
3. PS6-Alkyd Over Latex Primer System: MPI INT 9.2C.
a. Prime Coat: Interior latex primer/sealer.
b. Intermediate Coat: Interior alkyd matching topcoat.
c. Topcoat: Interior alkyd semi-gloss.
END OF SECTION 09 91 23
09 96 00 1 HIGH-PERFORMANCE COATINGS
SECTION 09 96 00 - HIGH-PERFORMANCE COATINGS
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes surface preparation and application of high-performance coating systems.
B. Related Requirements:
1. Division 05 Sections for shop priming of metal substrates with primers specified in this Section.
2. Division 09 painting Sections for special-use coatings and general field painting.
1.3 DEFINITIONS
A. Gloss Level 6: 70 to 85 units at 60 degrees, according to ASTM D 523.
B. Gloss Level 7: More than 85 units at 60 degrees, according to ASTM D 523.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product indicated. Include preparation requirements and application instructions.
B. LEED Submittals:
1. Refer to Section 01 81 13, Sustainable Design Requirements, for information regarding LEED® submission requirements.
2. The Contractor and/or Subcontractor shall submit the following information under a separate tab for LEED information.
a. A complete list materials.
b. Material costs for each material listed. Material costs shall not include installation or shipping costs.
c. Location of material manufacturer.
d. Location of material extraction/harvest.
e. Post-consumer and pre-consumer recycled content of each material.
f. Product Data for Credit EQ 4.2: For paints and coatings used inside the building envelope during construction provide manufacturer’s literature documenting VOC
09 96 00 2 HIGH-PERFORMANCE COATINGS
content of each product submitted. VOC content shall comply with requirements of credit EQc4.2.
C. Samples for Initial Selection: For each type of topcoat product indicated.
D. Samples for Verification: For each type of coating system and in each color and gloss of topcoat indicated.
1. Submit Samples on rigid backing, 8 inches (200 mm) square.
2. Step coats on Samples to show each coat required for system.
3. Label each coat of each Sample.
4. Label each Sample for location and application area.
E. Product List: For each product indicated, include the following:
1. Cross-reference to paint system and locations of application areas. Use same designations indicated on Drawings and in schedules.
2. Printout of current "MPI Approved Products List" for each product category specified in Part 2, with the proposed product highlighted.
3. VOC content.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials, from the same product run, that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
1. Coatings: 5 percent, but not less than of each material and color applied.
1.6 QUALITY ASSURANCE
A. Mockups: Apply mockups of each coating system indicated to verify preliminary selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.
1. Contracting Officer will select one surface to represent surfaces and conditions for application of each coating system specified in Part 3.
a. Other Items: Contracting Officer will designate items or areas required.
2. Final approval of color selections will be based on mockups.
a. If preliminary color selections are not approved, apply additional mockups of additional colors selected by Contracting Officer at no added cost to the Government.
3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Contracting Officer specifically approves such deviations in writing.
09 96 00 3 HIGH-PERFORMANCE COATINGS
4. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F (7 deg C).
1. Maintain containers in clean condition, free of foreign materials and residue.
2. Remove rags and waste from storage areas daily.
1.8 FIELD CONDITIONS
A. Apply coatings only when temperature of surfaces to be coated and surrounding air temperatures are between 50 and 95 deg F (10 and 35 deg C).
B. Do not apply coatings when relative humidity exceeds 85 percent; at temperatures less than 5 deg F (3 deg C) above the dew point; or to damp or wet surfaces.
C. Do not apply exterior coatings in snow, rain, fog, or mist.
PART 2 - PRODUCTS
2.1 HIGH-PERFORMANCE COATINGS, GENERAL
A. MPI Standards: Provide products that comply with MPI standards indicated and are listed in "MPI Approved Products List."
B. Material Compatibility:
1. Provide materials for use within each coating system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.
2. For each coat in a coating system, provide products recommended in writing by manufacturers of topcoat for use in coating system and on substrate indicated.
3. Provide products of same manufacturer for each coat in a coating system.
C. VOC Content: Products shall comply with VOC limits of authorities having jurisdiction and, for interior coatings applied at project site, the following VOC limits, exclusive of colorants added to a tint base, when calculated according to 40 CFR 59, Subpart D (EPA Method 24).
1. Flat Paints and Coatings: 50 g/L.
2. Nonflat Paints and Coatings: 150 g/L.
3. Primers, Sealers, and Undercoaters: 200 g/L.
4. Anti-Corrosive and Anti-Rust Paints Applied to Ferrous Metals: 250 g/L.
5. Zinc-Rich Industrial Maintenance Primers: 340 g/L.
6. Pre-Treatment Wash Primers: 420 g/L.
09 96 00 4 HIGH-PERFORMANCE COATINGS
7. Floor Coatings: 100 g/L.
8. Shellacs, Clear: 730 g/L.
9. Shellacs, Pigmented: 550 g/L.
D. Low-Emitting Materials: Interior coatings shall comply with the testing and product requirements of the California Department of Health Services' "Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers."
E. Colors: As indicated on Drawings and/or Delivery Order Requirements.
2.2 EPOXY COATINGS
A. Basis of Design:
1. Provide the following system or alternate system from an alternate manufacturer that meets or exceeds the following:
a. Epoxy Primer: Tennant Coatings ECO-MPE/FSE (1 coat, 5 mils dry film thickness).
b. Pigmented Build-Up Coat: Tennant Coatings ECO-MPE/FSE (12 mils dry film thickness).
c. Urethane Top Coat: Tennant Coatings ECO-HTS (2.93 mils dry film thickness).
2.3 SOURCE QUALITY CONTROL
A. Testing of Coating Materials: The Government reserves the right to invoke the following procedure:
1. The Government will engage the services of a qualified testing agency to sample coating materials. Contractor will be notified in advance and may be present when samples are taken. If coating materials have already been delivered to Project site, samples may be taken at Project site. Samples will be identified, sealed, and certified by testing agency.
2. Testing agency will perform tests for compliance with product requirements.
3. The Government may direct Contractor to stop applying paints if test results show materials being used do not comply with product requirements. Contractor shall remove noncomplying coating materials from Project site, pay for testing, and recoat surfaces coated with rejected materials. Contractor will be required to remove rejected materials from previously coated surfaces if, on recoating with complying materials, the two coatings are incompatible.
09 96 00 5 HIGH-PERFORMANCE COATINGS
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.
1. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:
a. Concrete: 12 percent.
B. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.
C. Proceed with coating application only after unsatisfactory conditions have been corrected.
1. Beginning coating application constitutes Contractor's acceptance of substrates and conditions.
3.2 PREPARATION
A. Comply with manufacturer's written instructions and recommendations in "MPI Architectural Painting Specification Manual" applicable to substrates indicated.
B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.
1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection.
C. Clean substrates of substances that could impair bond of coatings, including dust, dirt, oil, grease, and incompatible paints and encapsulants.
D. Concrete Substrates: Remove release agents, curing compounds, efflorescence, and chalk. Do not coat surfaces if moisture content or alkalinity of surfaces to be coated exceeds that permitted in manufacturer's written instructions.
1. Clean surfaces with pressurized water. Use pressure range of 1500 to 4000 psi (10 350 to 27 580 kPa) at 6 to 12 inches (150 to 300 mm).
2. Abrasive blast clean surfaces to comply with SSPC-SP 7/NACE No. 4, "Brush-Off Blast Cleaning."
09 96 00 6 HIGH-PERFORMANCE COATINGS
3.3 APPLICATION
A. Apply high-performance coatings according to manufacturer's written instructions and recommendations in "MPI Architectural Painting Specification Manual."
1. Use applicators and techniques suited for coating and substrate indicated.
2. Coat surfaces behind movable equipment and furniture same as similar exposed surfaces.
Before final installation, coat surfaces behind permanently fixed equipment or furniture with prime coat only.
3. Coat back sides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces.
4. Do not apply coatings over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.
B. Tint each undercoat a lighter shade to facilitate identification of each coat if multiple coats of the same material are to be applied. Tint undercoats to match color of finish coat, but provide sufficient difference in shade of undercoats to distinguish each separate coat.
C. If undercoats or other conditions show through final coat, apply additional coats until cured film has a uniform coating finish, color, and appearance.
D. Apply coatings to produce surface films without cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections. Produce sharp glass lines and color breaks.
3.4 FIELD QUALITY CONTROL
A. Dry Film Thickness Testing: The Government will engage the services of a qualified testing and inspecting agency to inspect and test coatings for dry film thickness.
1. Contractor shall touch up and restore coated surfaces damaged by testing.
2. If test results show that dry film thickness of applied coating does not comply with coating manufacturer's written recommendations, Contractor shall pay for testing and apply additional coats as needed to provide dry film thickness that complies with coating manufacturer's written recommendations.
3.5 CLEANING AND PROTECTION
A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.
B. After completing coating application, clean spattered surfaces. Remove spattered coatings by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.
C. Protect work of other trades against damage from coating operation. Correct damage by cleaning, repairing, replacing, and recoating, as approved by Contracting Officer, and leave in an undamaged condition.
09 96 00 7 HIGH-PERFORMANCE COATINGS
D. At completion of construction activities of other trades, touch up and restore damaged or defaced coated surfaces.
END OF SECTION 09 96 00