This solicitation is for the construction of a main base entrance at Battle Creek Air National Guard Base in Michigan. The project involves constructing a new main gate, guard booth, security fencing, active vehicle barriers, and site utilities. The estimated value is between $5-10 million. The competition is limited to 8(a) small businesses within the SBA's Detroit district. Bids are due by the date specified in the solicitation. The award will be made based on price and price-related factors to the responsible bidder providing the most advantageous offer to the government. A bid bond must be submitted with offers. The pre-bid conference and site visit will be held on the date specified at the provided location. Interested contractors are encouraged to attend and pre-register using the provided form.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Doyon Technical Services, LLC

1. Is a dedicated SSHO required for this project or Site Superintendent or QCM can perform duties of SSHO?

a. ANSWER: The Site Superintendent or QCM can perform the duties of the SSHO.

2. Please elaborate on scope of work / drawings references for Options 2 and 3 (concrete

Approach and Response Zone)

a. ANSWER: See sheets C-304 to C-305 and C-087 to C-088. These sheets detail the alternate pavement structure and limits for the ABI’s.

3. Please provide details for an ornamental fence shown on drawing C-401.

a. ANSWER: See sheet C-636 to C-638.

LGC Global

4. Ref: Spec 321313 Ref: Plans C-081 (Legend), C-303 Please provide curb details for D1, D2, F1, F2, F5, F6 referenced in legend.

a. ANSWER: Drawing C-549 will be added via Addendum 1 to include MDOT curb profiles.

5. Ref: Spec 321216 – 2.3 Ref: Plans C302, C-303 The specifications for this project call out a mix type of LVSP. The plans call out 2” 4E10 surface and 2.5” 3E10 base. Please see which mix(es) we are to use. We should also get clarification that they would like 3E10 laid at 2.5” if that is the mix specified, as it is generally not laid at less than 3” per MDOT standard specifications.

a. ANSWER: Updated plan sheets C-302 and C-303 and spec 321216 will be provided via Addendum 1, with the current MDOT spec referenced.

CoverSix

6. Do you know if the building walls need be ballistic steel?

o The only mention of ballistic rating is UL 752 level 3 for the windows on page

401. Only 14-gauge outer skin for the walls is called out on page 402.

ANSWER: Specification 133434 2.2 C. Prefabricated guard booth structure to be designed to meet or exceed UL 752 standards for Level 3 protection. Walls are to be 14ga min to meet requirements, inner skin is 18 ga minimum.

o It doesn’t make sense for the windows to be UL 752 and not the walls, ceiling and door. Can you clarify?

ANSWER: Doors to be bullet resistant per specification 08 34 00; guard booth door to be provided by MFR and shall meet all requirements of Specification 13 34 34.

Doyon Government Group

7. Are there any other control points along the proposed construction area besides the two control points and two benchmarks at the far south end of the project?

a. ANSWER: Additional control points provided on C-074.

8. Would the ANG base allow any UAV survey flights to be flown of the construction site during construction?

a. ANSWER: Yes. The ANG Base will allow UAV survey flights in the construction site area during construction as long as said flights are coordinated with Base personnel and proper clearances are received.

9. CLIN 1 Bid option 1 Concrete Pavement Approach: What are the limits of the approach area?

a. ANSWER: See sheet C-087.

10. CLIN 2 Bid option 2 Concrete Pavement Response: What are the limits of this area?

a. ANSWER: See sheet C-088.

11. CLIN 3 Bid option 3 Skyline Concrete Culvert: What Size Pipe or Culvert is to be reinstalled after removing the existing CMP culvert? What are the headwall and wing wall details as well?

ANSWER: CLIN 3 culvert size is 84” and Class D pipe. This will be updated on sheet C-203 in Addendum 1. The endwall detail is shown on C-516.

a. Also, is there a new concrete culvert being installed where the 18” RCP is being removed near the existing gate entrance on Skyline and Sentry Drive?

ANSWER: See sheet C-204 for installation of new 18” RCP.

12. Is there a location on site to dispose of project material (Concrete, asphalt, dirt)?

a. ANSWER: You can seek permission from the Government to dispose of material near the intersection of Sentry Drive Skyline at the north end of the project. This area is inside the Base perimeter.

13. Is there any existing DOT data showing the reinforcement design on the existing Skyline concrete road?

a. ANSWER: Existing as-builts define the pavement as reinforced. The existing pavement is ~50+ years old. Seek archival data for pavement standards from MDOT regarding pavement reinforcement.

14. Does ABI 1 & ABI 2 (Sheet C-304 & C-305) correlate to the Approach and/or response area?

a. ANSWER: Yes, those are the typical sections for the ABI.

HOFFMAN BROS. INC.

15. Please provide the location of soil borings that exist in the documents, if there are any. If there aren’t any, please provide them. It is crucial to have soil information at and near to the culvert replacement due to the potential need for deep well dewatering especially if the materials at the invert elevation of the culvert are granular in nature.

a. ANSWER: Addendum 1 will include the geotechnical report as supplemental data.

Arbor Corporation, Inc.

16. The passive barrier is shown as Mil-Con Reinforced fence, which is not on the DoD Anti- Ram Vehicle Barrier list. There is no rating or DoD listing shown or specified. Will the government be requiring a DoD Passive Barrier listed on the DoD Anti-Ram Vehicle Barrier list for this project? If so, is M50/P2 rating acceptable?

a. ANSWER: The cable fence provided in the drawings is detailed in the DoD Unified Facilities Criteria (UFC) as a PVB. The government requires proprietary barriers to be on the DoD Anti-Ram Barrier list. Cable fencing provided in the drawings is the minimum requirement.

17. The Soil Report is not included in the Specifications. Will the government be sharing the

Geotechnical Investigations? Specifically, this will be required at the location of the Skyline Culvert.

Nora Contracting and Hagerman

18. Regarding the bullet resistant transaction windows, spec section 134000.11 – 2.1 – A.

calls for the windows to meet NIJ III classification. Spec sections 134000.11 – 2.1 – C & D / 1.1 – C / 1.3 – A & B calls for the windows to be UL Listed Level 3. Please advise on which bullet resistance classification is required for this project.

a. ANSWER: UL 752 Level 3 is required. Addendum 1 will include the update to paragraph 2.1.A.

19. Manual Arm Gate Requirements

a. How many manual arm gates are required on this project? By looking at the plans, I can find two images of what appears to be arm gates, but they are not clearly identified on the plans, nor do the plans state sizes, etc.

i. ANSWER: Two are required. 16’ and 20’ length.

b. Also, there is mention in the specs (347113-2.3-A&B) that the arms should be adjustable from 10’ to 25’. Typically, these arms are designed to a fixed length.

If an adjustable length is required, can the A/E provide a manufacturer/product/etc. of a similar product used on a previous project?

i. ANSWER: The design is needed to be adjustable to use a similar product at multiple locations. The installed product installed does not need to be adjustable. https://barrier-gate.com/mb832-barrier-arm-gate – barrier-gate is a product that meets the requirements. It is not required to use this product.

20. Active Vehicle Barrier

a. The civil drawings (Sheets C501 & C502) show a very specific barrier, a Delta HD300EM. Is this exact barrier required for this project?

i. ANSWER: No, it is used as a reference.

b. Can a spec / further information be provided to communicate the intended operation of the barrier system and surrounding features, programming, systems controls, signage / signals, alarms, etc.

i. ANSWER: Specification sections 344126.0010 and 347113.19 will be provided as part of Addendum 1.

21. Sheet C-406 – Plan calls for removal of overhead power pole and transition of power lines to underground. Will cost for this work be a part of this contractor or outside this contract.

a. ANSWER: Project estimating during design identified an amount for the work in the plans indicated to be by Consumers Electric. Contractors shall provide an estimate of $60,000 in their bid price for the work. The awarded contractor will obtain a price from and contract with Consumers Electric for the work post-award.

22. Sheet C-703 shows (2) Final Denial Barriers. Please provide specifications and wiring diagrams.

a. ANSWER: Specification sections 344126.0010 and 347113.19 will be provided as part of Addendum 1.

23. Sheet E-502 updated drawing 7/29/22 shows an antenna tower. Please provide specifications for this tower including foundation details.

a. ANSWER: SEE TOWER FOUNDATION DETAIL 11/S-501.

b. Use Valmont round tapered steel smooth pole model number R900A386 or equivalent product. 1 ¼” minimum diameter anchor rod shall be used.

Coordinate baseplate with foundation detail shown on 11/S-501.

24. Sheet E-101 updated drawing 7/29/22 shows an underground MNS cable and conduit.

Where does this line terminate and what is its purpose.

a. ANSWER: MNS CABLE TO BE ROUTED TO ANTENNA TOWER TO THE

NORTH THROUGH 2” CONDUIT AS SHOWN ON SHEET E-101. THE 1”

CONDUIT AND CABLE AS REFERRED TO IN THIS QUESTION WILL BE

REMOVED FROM PROJECT IN ADDENDUM #1.

Four Tribes Enterprises

25. ABI 3: Change pipe from metal to reinforced Concrete On Sheet C-203 Note calls to change the metal pipe to reinforced Concrete pipe for 102-inch but they don’t make concrete in 102-inch. They make it in either 96-inch or 108-inch. Please confirm the size of reinforced concrete pipe? Also please confirm the Class type of the pipe?

a. ANSWER: CLIN 3 culvert size is 84” and Class D pipe. This will be updated on sheet C-203 in Addendum 1. The endwall detail is shown on C-516.

26. Access to electricity and water In Section 015000.1.4.B & C states that we will be able to use the Water and Electricity from the Government’s existing system. Can you please provide the locates of where we will be able to connect into those services?

a. ANSWER: Water and electricity for temporary use must be obtained by the contractor. There are no Base-owned water lines in the vicinity of the work. If the contractor wants to use Base power, such lines shall be metered, and paid by the contractor. See Michigan National Guard Construction Division 1 specifications (Attachment 4), specification 01 51 00 Temporary Utilities for further direction.

27. Toilet and Bath Accessories In Section 102800.2.2.D, E & F states that the Toilet Paper

Dispenser (TPD1), Paper Dispenser (PTD1) and Soap Dispenser (SD1) is provided by Government and installed by Contractor. Can you please confirm that the Government will provide those three (3) items?

a. ANSWER: Correct. Those items are Government Furnished, Contractor Installed.

28. Resilient Base On Sheet A602 – Architectural Finishes Schedule shows the Rubber Wall Base to be 6-inch high but in Section 096513.2.1.D states the resilient base to be 4-inches high. Can you please confirm which height for the base is correct?

a. ANSWER: Follow specification 09 65 13 – 4" base, A-602 to be revised in forthcoming Addendum 1.

29. Rubber Floor Tile On Sheet A602 – Architectural Finishes Schedule shows the Rubber

Floor tile to be 24-inch by 24-inch in size but the product that is stated comes in the standard size of 40-inch by 40-inch. Can you please confirm if we can provide the 40-inch by 40-inch size floor tile?

a. ANSWER: 40-inch by 40-inch tile acceptable. Other manufacturers may have equivalent products in 24-inch by 24-inch size.

Doyon Technical Services, LLC

30. Please identify the preferred active vehicle barrier manufacturer and model.

31. There are no specifications for the active vehicle barrier. Please provide specifications for this feature of work.

32. The number of gate arms required on this project is not clear. How many are required on this project?

a. ANSWER: Two are required. 16’ and 20’ length.

33. Please identify what Standards will govern the installation and commissioning of the active vehicle barrier system.

Reasor Building Group

34. During the site visit on 11/16/22 it was noticed that there appears to be a significant amount of standing water on the west side of the abandoned part of Skyline Dr. Per DWGs C-601 through C-639 a high security fence is to be installed through the observed wetlands; however, the drawings do not address the wetlands or how the fence is to be installed in wetlands. Please clarify how the contractor will install fencing through wetlands.

a. ANSWER: Fencing on the project attempted to avoid the wetlands based on data available during survey. At south end, fence is outside of wetland. On north end, fence location may be adjusted up slope slightly to avoid wetlands.

35. Can the government provide the CAD drawings that contain any external references and have any AEC/Proxy objects exploded pre bid date for the purpose of digitally determining cut and fill quantities for earthwork?

a. ANSWER: Yes, CAD files have been provided.

36. Demolition drawings C-051 through C-056 shows hatching within a cloud indicating areas of tree and vegetation clearing; however, drawings C-055 and C-056 show a cloud with no hatching in areas that appear to be cleared of trees and vegetation. Please clarify if these clouded areas in dwg C-055 and C-056 should be cleared for install of security fencing.

a. ANSWER: Line referred to as “cloud” is the standard line for vegetation. On sheet C-055 and C-056 remove only that vegetation needed for fence installation access.

37. In conjunction with the question above regarding clearing and fencing, the new security fence is to be installed to W. Dickman Rd; however, the demo drawings do not indicate any additional tree & vegetation clearing. Please clarify and provide required clearing dimensions for fencing to be installed to W. Dickman Rd.

a. ANSWER: Assumed to be 10-15 feet or as needed for contractor equipment.

38. Drawings C401-C406 show the requirements for the installation of new utilities, and they also show the locations of existing utilities, but do not show any modifications or relocation of existing utilities and grade in the front gate area is being changed significantly. Please confirm that the contractor is only responsible for the new utilities shown on the plans and are not responsible for the modification or relocation of existing utilities.

a. ANSWER: Contractor not responsible for relocation of existing utilities.

39. Drawing C-639 provides a temporary security fence detail. Please confirm that this if for areas where existing base security fence will have to be temporarily altered to allow for new construction.

a. ANSWER: Maintain the existing Base perimeter with existing or new permanent fence. Temporary fence is for the staging area.

40. Will the government require temporary construction fence around the entire construction limits or just around contractor staging area?

a. ANSWER: Temporary fence is not required around the entire construction area.

41. Drawings C-021, C-081, C-311 show a multipurpose trail (bike/hiking trail). The trail is shown on the demo drawings and the trail is shown on new work drawings; however, it is not clear if the contractor is to install this multipurpose trail. In addition, the trail on west side runs off the drawing so we are unable to quantify. Please clarify who is responsible for install of multipurpose trail. If the contractor is responsible under this solicitation, please provide details for preparing estimate for this scope.

a. ANSWER: Trail construction is with Skyline/Hill Brady intersection project and not this project.

42. Solicitation requests pricing for three options, how long does the government require pricing to be held for award of options?

a. ANSWER: It is the intent to evaluate and potentially award bid options at the start of the project.

43. The solicitation provides complete project specifications in Attachment 2 to include Division 01 General Requirements and provides a separate stand-alone Division 01 General Requirements in Attachment 4. There are some areas the appear to conflict between both Div. 01 specs. Please clarify which Div. 01 specification the contractor is to use.

a. ANSWER: Addendum 1 provides direction as to which specification sections to use from Attachment 2, and which to use from Attachment 4.

44. Attachment 4 Div. 01 40 00 paragraph 1.3 I and paragraph 1.8 A-C reference Special Inspections, it appears that a Special Inspection schedule was not provided. Please provide a schedule for the desired special inspections. Without a clear definition or special inspections schedule it is unclear which items will require “Special Inspections”, what areas will need a 3rd party inspector, etc.

a. ANSWER: No Special Inspections are required on the project. There are inspections required for structural elements as noted on S-002.

45. Attachment 2 Div. 01 40 00 paragraph 1.5 section A.2.a states that the Quality Control Manager may serve as the Project Superintendent; however, Attachment 4 Div. 01 00 00 Paragraph 1.21 B states a key team member may not hold more than one key role.

Please clarify.

a. ANSWER: A Superintendent and Quality Control Manager are required to be separate individuals. One of those individuals may assume the role of Site Safety and Health Officer/Safety Manager. Specification 01 40 00 in Attachment 2 is being deleted in Addendum 1.

46. Can the Superintendent, Quality Control Manager, and Safety Manager be one individual, or do they have to be separate individuals?

a. ANSWER: A Superintendent and Quality Control Manager are required to be separate individuals. One of those individuals may assume the role of Site Safety and Health Officer/Safety Manager.

47. Attachment 4 Div. 01 81 13 Sustainable Design Requirements discusses LEED Silver certification. Please confirm this project is to be LEED Silver certified.

a. ANSWER: The project does not meet the SF requirement to qualify for LEED certification.

48. Attachment 4 Div. 01 91 13 requires commissioning (CxA). This is a small mechanical project please confirm that commissioning is required.

a. ANSWER: Commissioning is not required for this project.

49. Div. 08 calls for bullet proof doors, hardware, storefronts, glass, etc. The schedules in architectural drawings and A-601 do not specified which are to be bullet proof. Is the contractor to assume all Div. 08 doors, frames, hardware, aluminum store front, glass, etc. even the interior doors are to be bullet proof per UL 752 level 3?

a. ANSWER: Exterior envelope shall be designed to Level 3 minimum including walls doors and windows, Interior walls and windows where identified are to meet

Level 3 protection as well. A-601 to be revised in forthcoming addendum to address door requirements.

50. Drawing A-141 detail 3 shows fiberglass ballistic panels for wall type BC3 and Drawing A-101 shows BC3 on two walls in Badging Area Room 104. Please confirm that ballistic panels are not required in the SA6 and SA3 walls.

a. ANSWER: Correct ballistic requirements apply to interior BC-3 walls only.

51. Drawing A-101 shows SA6 wall tag on one wall, please confirm that SA6 type walls are typical for all exterior walls not just the one wall shown on drawings.

a. ANSWER: SA-6 applies to tagged interior wall, exterior walls are shown in building and wall sections and are not assigned a wall type on A-141

52. Drawing S-002 Structural Steel Note S-13 states that “all exterior steel shall be hot dipped galvanized”; however, the architectural elevation drawings A-202 through A302 Note 4.106 states that the structural canopy columns are to be “painted”. Please clarify if the structural frames are to be hot dip galvanized or field painted.

a. ANSWER: All exterior steel shall be hot dipped galvanized. Where architecture schedules paint, it shall be additional on top of the hot dip galvanizing. Be sure to provide appropriate surface preparation and paint/tie coat that is compatible with hot dip galvanizing.

53. Please confirm that the abandoned Skyline Rd will remain shut down during construction.

a. ANSWER: Skyline (north of Hill Brady Road) is not in use and will remain closed to non-construction traffic.

54. The solicitation provides 3 wage rates: Highway, Building, and Heavy. Is this project classified as Highway, Building or Heavy? Which will prevail for this project?

a. ANSWER: All three wage rates apply, as there are various divisions of the work that falls under each one.

55. At the site visit it was stated that local, state, federal permits were not required. Please confirm this understanding.

a. ANSWER: Building permits are not required. Environmental compliance with applicable permitting is required.

56. Attachment 01 Submittal Book pg. 15 Erosion Control Plan states a permit is required to be filed with MDEQ and county permit applications to be filled out. Since this document is directed between the DoR and Government it implies that filing of local permit and MDEQ permits has been completed by DoR and Government. Please confirm that the contractor is not responsible for MDEQ or local permits.

a. ANSWER: Environmental permits are a shared responsibility between DoR and Government. The contractor is still responsible to coordinate approval during construction.

57. Attachment 01 Submittal Book pg. 59 show 6 IRP sites located to the east of the railroad tracks. It does not appear that this is in proximity to construction associated with this solicitation. Please confirm that the contractor is not responsible for IRP site identification or remediation, UXO surveys or archeological monitoring.

a. ANSWER: Contractor not responsible for IRP site identification or UXO surveys.

58. Can the government provide any Geotechnical surveys, borings, etc. that were completed to the design preparation of this project?

59. Div. 31200 paragraph 3.2 A states no changes in contract sum or contract time will be authorized for rock excavations or removal of obstructions. Please provide quantity of rock excavations and unforeseen obstruction the contractor should include in price.

a. ANSWER: There is not rock excavation anticipated. If unforeseen obstructions are encountered, an agreement will be determined as that scope becomes known.

60. No information was provided for the contractor to determine if the existing soil meets the requirements of Div. 312000 paragraph 2.1 B. Please advise what percentage of existing material the contractor can assume is satisfactory and can be reused as general fill.

61. Drawings and specs state to bid per MDOT standards. Please confirm that drawings and specs are based and compliant with MDOT standards.

a. ANSWER: Drawings and specs generally conform to MDOT standards.

62. Attachment 4 01 00 00 paragraph 1.4 A states work hours as 0745 to 1630 hours and

1.4 C states work hours as 0700 to 1700 hours. Please clarify work hours.

a. ANSWER: The majority of the work is expected to occur outside the installation perimeter. Work requiring access inside the installation perimeter can occur 0700-1700. Inbound traffic must access the installation prior to the close of the contractor gate at 1500 each day.

63. We have located numerous qualified and experienced AISC certified fabricators who have stated their intention to not bid this project. We have also located numerous qualified and experienced fabricators who have completed similar projects of scope and size that are not AISC certified but are interested in submitting a proposal for the steel fabrication and installation. Will the government consider removing AISC certification for the fabrication and installation of steel on this project to allow more pricing from qualified subcontractors?

a. ANSWER: AISC certification will not be waived.

64. Section 054000 paragraph 3.9 indicates that the Government will engage an independent testing and inspecting agency. Is there any other scope where the Government will be engaging 3rd party inspectors and not the contractor exclusively?

a. ANSWER: There is no material required by 054000 that requires testing. All testing will be procured by Contractor.

65. Section 051200 paragraph 1.4 and 055000 paragraph 2.10 discuss galvanizing and shop priming for structural steel and metal fabrications. Is the intent for all structural steel to be galvanized and not painted on site? In our experience, it is best not to attempt coating of galvanized metal as there are issues with coating adhesion to galvanized metal.

a. ANSWER: See response to Question 52.

66. Section 064116 section 1.5 states that plastic laminate countertops must conform to AWI standards. Please confirm that an AWI certified subcontractor is not required and only AWI standards must be achieved.

a. ANSWER: As specified AWI standards must be met.

67. Section 081416 detail requirements for Flush Wood Doors. Per the door schedule on A- 601 of the drawings, all doors are either aluminum or hollow metal. Can this specification be removed from the requirements?

a. ANSWER: Specification 08 41 16 is not required. Addendum 1 will remove Specification 08 41 16.

68. Section 096513 details the resilient base height as 4”, whereas drawing A-602 details the base height at 6”. Please confirm which height should be included in the proposal.

a. ANSWER: Follow specification - 4” base, Sheet A-602 to be revised in Addendum 1.

69. Section 099113 and 099123 paragraph 3.4 for both states that the Government retains the right to require testing and retesting as often as desired to achieve standards at the cost of the contractor. Is there a baseline or number of testing the government wishes to be performed for the coatings before any subsequent testing would be required?

a. ANSWER: The Government may request up to two coatings for baseline testing.

Testing will be determined between the Government and contractor prior to the start of painting.

70. Section 108113 paragraph 1.2 details that bird barrier spike strips are to receive high-performance coating systems. Can the government confirm these strips will receive high-performance coatings and give direction on which specification to follow when coating this?

a. ANSWER: Install prefinished barrier strips as specified, additional coatings not required.

71. Section 230900 paragraph 1.9 N states to update the existing DDC software and firmware to current cybersecurity standards. Can more clarification be provided for the current cyber security standards regarding the DDC system?

a. ANSWER: Contractor shall follow Air Force Guidance Memorandum, Civil Engineer Control Systems Cybersecurity (AFGM2018-32-01).

72. Section 271323 paragraph 3.6 A states that the government will engage a qualified testing agency to perform tests and inspections, however, paragraph 3.6 B states for the contractor to engage a qualified testing agency. Is the requirement’s intent to have both the government and the contractor provide separate qualified inspectors, or will only one inspector be required? Is this inspector to be provided by the government or the contractor?

a. ANSWER: The contractor is to provide the inspector. Paragraph 3.6.A will be deleted from the specification section in Addendum 1.

73. Specification Section 323119.53 paragraph 2.1. Is there a basis of design for the ornamental fencing?

a. ANSWER: Design of fence is based upon UFC 4-022-02 and 4-022-03 as well as

SDDCTEA Pamphlet 55-17. This is essentially an ornamental fence with UFC standard cabling included. Cabling provided in the drawings is the minimum requirement.

74. Specification Section 323119.53 paragraph 2.1 – E states that the pickets should be cut and split to form three points above the top rail, however, detail A1 on drawing C-637 indicates the picket style to have a single point and be curved toward the outside of the base. Please confirm which picket style is required for the ornamental fencing.

a. ANSWER: Picket style per specification.

75. What type of access control components (i.e., Card reader, push button station, etc.) will be utilized to operate the automated ornamental gates and where will these components be located?

a. ANSWER: Gates shall be operated from the Gatehouse, no other interface will be needed at the gate itself.

76. Are the active vehicle barriers to be electromechanical or hydraulic?