P-1_Pre_Bid_Site_Visit.pptx
PPTX presentation 217 KB Posted
- Attached to
- Emergency Repairs Building P-1 Federal contract opportunity
- Solicitation number
- W50S83-21-B-0002
- Issued by
- Department of the Army National Guard
About this file
This solicitation requests bids for emergency repair work on Building P-1 at the South Portland Air National Guard Station in South Portland, Maine. The project includes repairs to the building envelope, interior, and exterior stairs and landings. Work on the building envelope involves repairing and replacing portions of the roof, patching exterior walls, and repointing and sealing the facade. Interior work consists of replacing ceiling tiles and flooring along with repairing floor trench panels and doors. The exterior scope includes replacing stairs and rails and repairing the main entrance landing. The period of performance is 180 days and bids are due on June 3, 2021. The project magnitude is between $250,000 to $500,000 and is set aside for small businesses. The pre-bid conference included a site visit to view the required work. The solicitation is available on SAM.gov and award will be made based on price to the responsible bidder.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Attendance Sheet.pdf | ||
| Bid Abstract W50S83-21-B-0002.pdf | ||
| Approved Contractor List- ANG P1 Repairs.pdf | ||
| W50S83-21-B-0002-0001 Emergency Repairs Bldg P-1.pdf | ||
| Photos.pdf | ||
| Brand Name Item JA VVRK182001 Roofing_Redacted.pdf | ||
| Pre Bid Site Visit Attendance Roster.pdf | ||
| W50S83-21-B-0002 Emergency Repairs Bldg P-1(5).pdf | ||
| P-1_Specifications_B-3_04-05-21.pdf | ||
| P-1_Drawings_B-3_04-05-21.pdf | ||
| W50S83-21-B-0002 Emergency Repairs Bldg P-1(4).pdf | ||
| MEANG Form 4 (Change 20190801).pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Emergency Repairs Building P-1 W50S83-21-B-0002 Pre-Bid Conference/Site Visit
CAPT DIRCK STORMS, CONTRACTING OFFICER
MSGT DANIEL BOONE, CONTRACT SPECIALIST
11 MAY 2021
POINTS OF CONTACT
Capt Dirck Storms, Contracting Officer Phone: 207-430-5531 Fax: 207-404-7177 dirck.storms.1@us.af.mil MSgt Daniel Boone, Contract Specialist Phone: 207-404-7419 Daniel.boone.5@us.af.mil MSgt Kate Hewitt, Contracting Officer’s Representative (COR) Phone: 207-756-7901 elisabeth.hewitt@us.af.mil
IMPORTANT ITEMS
Ask that during the site visit, we stay together as a group for security and accountability
No photos allowed in controlled areas
QUESTIONS AND ANSWERS:
All questions and answers must be in writing.
Email all questions to MSG/MSC Contracting <101.MSG.MSC.Contracting@us.af.mil>, Attention W50S83-21-B-0002 Emergency Repairs Building P-1.
Do not contact engineers or A&E, as this will only delay receipt of answers.
Questions must be received NLT 5 business days (26 May 2021; 10:00 AM EST) prior to closing.
Answers will be provided with questions, on a non-attribution basis to all eligible contractors via https://beta.sam.gov/.
RFQ SUMMARY
Set Aside: Total Small Business Period Of Performance: 180 Days Magnitude of Construction: $250k-$500K Davis Bacon – Cumberland; ME20210016 04/02/2021 Bids Due: 10:00:00 AM EST, 03 June 2021 Bid Guarantee: The bid guarantee amount shall be at least 20 percent of the bid price.
Payment Bond: Yes Performance Bond: Yes
W912JD-14-Q-2010
BASIS FOR AWARD
Sealed Bid Factors FAR 14.101(e) After bids are publicly opened, an award will be made with reasonable promptness to that responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price and the price-related factors included in the invitation.
A bidder is determined to be responsible in accordance with FAR 9.104
Complete Bid Package Offer shall be on SF1442, front & back signed.
Section 00010 Line Items- all items must be priced Valid Bid Bond, Standard Form 24 Section 00600, Representations & Certifications Original signature of an official with authority to bind the company.
Acknowledge all amendments Mark front of envelope: “BID No. W50S83-21-B-0002”
Bid Opening Bid repository for hand carried bids located at 101st Air Refueling Wing/MSG, Base Contracting Office, Bldg 505, MEANG, Bangor IAP, ME.
Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.
Bid opening: 03 June 2021, Maine Air National Guard, Large Classroom Bldg 505 Bangor IAP, Bangor, ME
Clauses FAR 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.
DFARS 252.232-7003 Electronic Submission Of Payment Requests And Receiving Reports (Jun 2012)
PROJECT SUMMARY
CLIN 0001 – Building Envelope Non personal services: Provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the Construction of repair and renovation of Building P1, including removing exhaust fans, patching roof, seam sealing, wall transition flashing repairs, repairing built up roof, replacement of approximately 1,000 SF of wet insulation, cleaning approximately 4,000 SF of exterior walls, repairing 300 SF brick and 25 SF of EFIS exterior walls, repointing and sealing of approximately 2,750 SF of façade, and repair of exterior cracks in walls IAW B2 Final Submittal specifications and drawings dated 14 January 2021.
PROJECT SUMMARY
W50S83-20-B-0002 CLIN 0002 – Building Interior Non personal services: Provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the Construction of repair and renovation of Building P1, consisting of replacing approximately 14,309 SF of ceiling tiles and approximately 10,648 SF flooring (VCT, carpet, and paint), repair of seven (7) floor trench/plate cover panels, and replacement of weather stripping on 24 doors to create weather tight seals IAW B2 Final Submittal specifications and drawings dated 14 January.
PROJECT SUMMARY
W50S83-21-B-0002 CLIN 0003 – Exterior Stairs & Landings Non personal services: Provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the Construction of repair and renovation of Building P1, consisting of replacing exterior stairs and rails, repair of landing at the main entrance, and any required earthwork to complete installation and repairs IAW B2 Final Submittal specifications and drawings dated 14 January 2021.
FAR 52.236-21
Specifications and Drawings for Construction. This clause provides the guidance that anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. Furthermore, in the case of difference between drawings and specifications, the specifications shall govern.
Project Scope Remove abandoned exhaust fans and patch roof. Perform seam sealing and wall transition flashing repairs at rubber membrane roof. Perform expansion joint repairs, wall transition flashing repairs and repair built up roof. Replace approx. 1,000 SF of wet insulation.
Clean approx. 4,000 SF of exterior wall. Repair 300 SF of brick and 25 SF of EFIS. Repoint and seal approx. 2750 SF of façade. Repair exterior cracks in the walls as identified in the drawings.
Replace/salvage approx. 14,309 SF of ceiling tiles and replace approx. 10,648 SF of flooring (VCT, carpet and paint). Repair 7 floor trench/plate covers panels.
Replace weather stripping on 24 doors to make weather tight.
Replace exterior stairs and rails located by the dining hall door. Repair landing at main entrance so surface is even and flush. Perform required earthwork to complete installation and repairs.
Price per Square Foot to remove asbestos containing floor tile and floor tile adhesive.
Price per Square Foot to remove and replace wet roof insulation, price to include built-up SBS roofing and gravel covering.
Clarifications?
Reminder ALL questions shall be submitted in writing.
Responses to “questions/clarifications” are not official until written responses are received.
Supporting Agencies
SFS
Safety Fire Bio Environmental Hazmat Airfield Management
Site Visit Following the presentation in the classroom in P-1, the group in attendance walked around to view the inside requirements, then proceeded around the outside of the building to view the exterior parts of the project, and then finally climbed up on the roof to see what was required there.
image1.png image2.png image3.png image4.jpeg
File details come from the government source that posted it. Updated .