Attachment_1_Statement_of_Work_PJMS252006_31July.pdf
PDF 726 KB Posted
- Solicitation number
- W50S8225RA005
About this file
This Statement of Work (SOW) details the replacement of gates and security infrastructure at the Maryland Air National Guard Base located at Martin State Airport in Middle River, Maryland. The project involves removing and replacing two manual swing gates, six in-ground anti-vehicle bollards, and approximately 9 linear feet of perimeter fencing at the Highway 43 Entry Control Point. Key requirements include upgrading the gate system to meet current Unified Facilities Criteria (UFC) standards for security, installing new bollards with an M30/P1 rating capable of stopping a 15,000 lb vehicle traveling at 30 mph, adding three-strand barbed wire outriggers, and ensuring proper electrical grounding and bonding of metallic components.
The project requires comprehensive documentation, including product submittals, bollard and ground resistance certifications, traffic control and site security plans, and operation and maintenance manuals. Contractors must comply with strict security protocols, including background checks, antiterrorism training, and base access procedures. The work must be performed between 0630-1700 hours Tuesday through Friday, with potential for off-hour work by special approval. Optional scope includes demolition and replacement of an existing pedestrian turnstile gate. The contractor will be responsible for site restoration, including topsoil replacement, reseeding, and restoring disturbed asphalt and concrete surfaces.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OLD GATE REPLACEMENT
STATEMENT OF WORK (SOW)
PROJECT NUMBER: PJMS252006
MARYLAND AIR NATIONAL GUARD
MARTIN STATE AIRPORT
NATIONAL GUARD BASE
MIDDLE RIVER, MARYLAND 21220
31 July 2025
1. General Project Information:
1.1. Project Location and Background: This project is located at the Hwy 43 Entry Control Point (ECP) on the Maryland Air National Guard Base (MDANG), Martin State Airport, Middle River, MD 21220. Approximately one year ago, a high-speed vehicle crash rendered the inbound swing gate and several adjacent in-ground bollards inoperable. The current system no longer meets Unified Facilities Criteria (UFC), Antiterrorism (AT)/Force Protection (FP), and operational requirements.
1.2. The ECP consists of two existing manual double swing gates—controlling inbound and outbound vehicular traffic—on either side of Guard House Bldg 2000. The inbound swing gate and adjacent bollards require full replacement.
1.3. Site Description: This facility always requires security protection. Absolutely no photography of aircraft is permitted.
1.4. Use of Premises:
· The contractor shall assume full responsibility for protection and security of materials and equipment stored on site.
· The contractor shall move any stored products, under their control, which interfere with operations of the government.
1.5. Government Equipment: Contractor use of government owned or leased equipment such as hoists, forklifts, compressors, welding machines, cutting rigs, etc. shall not be permitted on either a reimbursable or non-reimbursable basis. Cost for all equipment required to accomplish the work shall be included in the contractor’s final price.
1.6. Permits and Inspections: Normally no permits or inspections by local building officials are required. All inspections will be performed by the Contracting Officer Representative (COR) unless modified by the SOW. All testing will be performed by the contractor unless modified within the construction documents.
1.7. Contractor Passes and Installation Access:
· Contractor’s passes are only issued to personnel who have properly submitted a locally generated Wing Form 113: 175th Wing Installation Access Application and have been cleared through an approved background check.
· Passes may be issued for 30 days or more; those requiring less than 30 days may be issued a DBIDS-generated AF Form 75 Visitor Pass.
· Contractors must complete Antiterrorism Level I training and submit certificates with their applications. Training is available at http://jko.jten.mil/courses/atl1/launch.html.
· The contractor shall comply with all applicable installation/facility access and local security policies and procedures.
· Contractors and subcontractors must comply with adjudication standards and procedures using NCIC-III and TSDB, and other applicable Department of the Air Force (DAF) and Department of Defense (DoD) guidance.
1.8. Fire and Digging Permits:
· A burn permit (AF Form 592) is required for any open flame work and must be approved daily by the base fire department.
· A digging permit is required and obtained from the Work Control Office.
Contractors must contact Miss Utility and a private locating service.
1.9. Authority to Obligate the Government, Change Orders, and Field Changes:
· Only the Contracting Officer (KO) has the authority to obligate the U.S.
Government. No personnel other than the KO are authorized to make commitments or changes that affect the cost, scope, schedule, or terms of this contract.
· Only the KO or the contractor may initiate change order requests. No changes shall be made without written approval from the KO. Any verbal or written direction from other government personnel shall not be construed as a change to the contract unless formally authorized by the KO.
· Field changes not affecting cost or scope may be initiated by the Base Civil Engineer http://jko.jten.mil/courses/atl1/launch.html
(BCE), COR, KO, or contractor.
1.10. Daily Reporting and Work Hours:
· Contractors must sign in daily at Facility 2100 and report the number of workers on site.
· Work hours are Tuesday to Friday, 0630 to 1700. Off-hour work must be requested in writing and approved by the KO.
1.11. Site Cleanliness and Safety:
· Contractors must maintain a clean job site and remove debris daily. Foreign Object Debris (FOD) control is required.
· All work shall be performed in compliance with State and Federal OSHA and USACE EM 385-1-1 standards.
1.12. Environmental Protection and Waste Disposal:
· Contractors must comply with all environmental laws. The total cost must include all dumpsters and disposal services, as this is a firm fixed price contract.
· Recyclable metals may be placed in the on-base designated scrap metal containers with COR coordination.
1.13. Hazardous Materials:
· If suspected hazardous materials are discovered, stop work and notify the COR.
1.14. Existing Drawings:
· Government-furnished drawings may be used for reference only. Contractors must verify conditions on site.
1.15. DD Form 1354:
· Contractors must submit completed DD Form 1354 for all constructed or demolished assets. Contact the Real Property Office (410-918-6222) for assistance.
1.16. Inspections:
· Final inspections will be conducted by the COR before turnover.
1.17. Meetings:
· A preconstruction meeting is required. Weekly progress meetings shall also be held.
1.18. Warranties:
· The contractor must provide a manufacturer’s warranty and a separate 10-year installer’s warranty for all permanent components, including the new gates, the new fence, the new bollard system, and the Grounding and Bonding system.
1.19. Quality Control:
· The contractor must establish and maintain quality control documentation and provide records to the government.
1.20. Utility Interruptions:
· The contractor shall coordinate with the COR for all utility shutoffs. Only government personnel may disconnect or reconnect utilities.
2. General Scope of Work: The contractor shall furnish all labor, materials, equipment, tools, transportation, supervision, and incidentals necessary to:
· Remove and replace two damaged manual swing gates with new gates of equivalent design, functionality, and specifications, ensuring compliance with current Unified Facilities Criteria (UFC) standards.;
· Replace six in-ground anti-vehicle bollards;
· Replace approximately 9 linear feet of damaged perimeter fencing;
· Provide bonding and grounding for new gate installations;
· Restore any disturbed landscaping or hardscape features;
· Trim trees if required to complete the scope of work (with COR coordination and approval);
· Ensure continuity of perimeter security throughout construction;
· Coordinate traffic and environmental considerations.
3. Required Base Scope
3.1. Demolition and Replacement:
· Remove and replace both inbound and outbound swing gates with new equivalent manual swing gates, matching existing dimensions, frame construction, and materials (e.g., galvanized steel), but upgraded to meet all current UFC 4-022-03 height requirements, including the addition of three-strand barbed wire outriggers angled at 45 degrees.
· The bottom of the gate shall maintain a maximum clearance of no more than 4 inches from the finished road surface at all points along its length. Gaps between the gate frame and adjacent gate posts or supporting structures shall also not exceed 4 inches in any direction.
· Provide shop drawings of proposed gate assemblies, including detailed structural and component specifications.
· Remove and replace six damaged in-ground anti-vehicle bollards. Bollards shall meet ASTM F2656 M30/P1 rating minimum (which means they can stop a 15,000 lb.
vehicle traveling at 30 mph in less than 1 meter penetration). Bollards shall be embedded in reinforced concrete foundations to a minimum depth of 36 inches and include integrated lockable receptacle caps if removable.
· Remove and replace approximately 9 linear feet of decorative anti-personnel fencing to match adjacent fencing aesthetics and structural design.
3.2. Grounding and Bonding:
· Electrically bond all metallic components of each gate using #6 AWG copper jumpers.
· Ground each gate using a 5/8" x 10' copper-clad ground rod embedded a minimum of 8 feet below grade.
· Grounding system shall be tested using a clamp-on ground resistance tester.
Resistance must not exceed 25 Ohms. If resistance exceeds 25 Ohms, install additional rods spaced at least 6 feet apart.
· Submit test results detailing test method, ambient conditions, and measured resistance for each gate.
3.3. Site Restoration and Landscaping:
· Restore all disturbed landscaped areas using a topsoil depth of no less than 4 inches, followed by reseeding with MDOT SHA-approved turfgrass mix.
· Restore any disturbed asphalt using 4" thick hot-mix asphalt (HMA), MDOT SHA P- 403 or equivalent.
· Restore disturbed concrete using 6" thick 4000 psi air-entrained concrete with broom finish to match existing.
3.4. Tree Trimming:
· The contractor shall maintain a minimum vertical clearance of 12 feet and horizontal clearance of 3 feet from gate travel paths.
· Submit request for trimming with justification and pre-work photos. Written approval from COR is required prior to trimming.
3.5. Perimeter Security:
· The contractor must install a continuous temporary security fence that connects to the permanent fencing at both ends of the project site. The fence must maintain full perimeter integrity using chain-link fencing at least 7 feet high, anchored or ballasted, and equipped with anti-lift attachments. The contractor is responsible for securing both the gate and the perimeter throughout construction.
· Since this gate serves as the installation’s backup exit, the contractor must also be able to make at least one lane accessible for vehicles within four hours of government notification. This temporary access will stay in place until the Main Gate is back to normal operation.
· If a temporary breach in perimeter security is required, notify the COR in writing at least 24 hours in advance, including location, duration, and proposed mitigation.
3.6. Traffic and Environmental Coordination:
· Submit traffic control plan detailing signage, barricades, flagging operations, and staging zones. The plan must be approved by COR and KO.
· Coordinate internal traffic impacts with 175th Security Forces Squadron and external coordination with Baltimore County Police as required.
· Conduct hazardous paint testing prior to demolition. If lead-based paint is found, halt work and notify COR and KO immediately.
4. Optional Items - The following items are not included in the base scope but may be awarded as an option.
· Demolition and removal of the existing pedestrian turnstile gate and associated 9’ x 9’ concrete pad. To include the installation of UFC-compliant decorative fencing to replace removed turnstile opening.
5. Submittals and Deliverables
5.1. Required Submittals:
· Product Submittals (AF IMT 3000)
· Bollard Certification
· Ground Resistance Test Results
· Traffic Control Plan
· Site Perimeter Security Plan
· Operation and Maintenance (O&M) Manuals for gates, bollards, and grounding system
· DD Form 1354 Real Property Transfer Worksheet
5.2. Deliverables:
5.2.1. As-Built Drawings:
5.2.2. One (1) hard copy set
5.2.3. One (1) PDF digital set
5.2.4. One (1) CAD-compatible DWG digital set
5.3. Pre-Work Submittals:
· Design Package
· Grounding Test Results
· Bollard Impact Test Certification
· Production Schedule
· Safety Plan/AHA
· Safety Data Sheets (SDS)
· All components and materials
· Manufacturer Certification Letter
5.4. Closeout Submittals:
· As-Built Drawings (PDF and hard copy, labeled AS-BUILT, submitted 14 days before project completion)
· O&M Manuals (Digital PDF and one hard copy binder)
6. Applicable Standards [Unchanged]
· UFC 4-022-01: Entry Control Facilities
· UFC 4-022-02: Selection and Application of Vehicle Barriers
· UFC 4-022-03: Security Fences and Gates
· UFC 4-010-01: DoD Minimum AT/FP Standards
· NEC
· NFPA
· ADA/ABA Accessibility Standards
· Base-Specific AT/FP Requirements
--------- End Statement of Work ---------
Figure 3: Location of existing old gate
Figure 4: Current gate condition
Figure 5: Example of Single Cantilevered Gate per UFC 4-022-03
Figure 6: Example Bollard System per UFC 4-022-02
Table 1: Gate Post Foundation Guidelines per UFC 4-022-03