About this file
This memorandum documents minutes from a pre-proposal site visit for solicitation W50S7X-23-B-0002 to replace uninterruptable power supplies and perform electrical upgrades at Building 35 at McConnell Air Force Base in Kansas and Building 5010 at Smoky Hill Bomb Range in Salina, Kansas. The scope of work involves removing and replacing the existing UPS units with new supply circuits, conduits, wiring and fittings connecting the new UPS units to upgraded output power panels to accommodate relocated existing loads. Offerors were provided access to the communications and mechanical rooms at both buildings during the site visits. Questions were addressed confirming picture-taking was allowed, manufacturer of replacement lithium-ion batteries did not need to be specific, and contractors would be provided a scheduled downtime to perform the switchover to the new systems. The pre-proposal conference sign-in sheets list attendees and contact information. The procurement is currently unfunded with a 90-day period of performance and 10-day notice to issue notice to proceed.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEMORANDUM FOR RECORD
SUBJECT: MINUTES OF PRE-PROPOSAL SITE VISIT, SOLICITATION W50S7X-23-B-0002, PRQE
222193 Replace UPS and Electric Upgrade Bldgs 35 & 5010
Bldg 35 (McConnell AFB, Ks) Site Visit, 16 May 2023, 1000
1. The list of contractors attending the meeting is shown on the attached sign-in sheet. The following
Government representatives attended the subject meeting:
SMSgt Brent E Geschwentner, KSANG Base Contracting Officer Mr. Jeremiah Shaw, 184CES, Civil Engineering Assistant
2. The following items were discussed during the Pre-proposal Conference:
a. The Contract period is 90 days and work shall begin within 10 days of NTP. Performance and Payment Bonds are required within 10 calendar days after award. Bid guarantees are required.
b. Interested offerors must submit a Standard Form (SF) 1442 front and back signed, with all line items priced. Only an “Official” having the authority to contractually bind the company may sign the SF 1442.
c. Faxes and electronic submission of bids will NOT be accepted.
d. All attending Contractors followed the CE POC to bldg. 35 and were granted access to the Communications room.
e. State electrical employees, John Barrier and Thomas DeWitt were present at the bldg. 35 location for any questions.
f. This is an unfunded requirement.
3. Questions must be submitted in writing via email, especially technical questions to:
darin.brun@us.af.mil & brent.geschwentner@us.af.mil. All questions must be routed through the Contracting Office. All Contractor questions when answered will be posted to the website. If a question arises that will result in a change to the plans or specifications, an official amendment will be issued. All correspondence, questions and answers, amendments etc. will be issued or posted at beta.SAM.gov.
4. All attendees were given the chance to ask questions.
Questions that were asked:
A. Can the Contractors take pictures? The answer was yes.
B. Does the manufacturer of the Lithium-Ion batteries have to be specific? Answer was no, not as long as they (batteries) meet the specifications.
c. Does the Contractor need to provide a backup power source during the “Switch-over” to the new system. No, the Contractor will be allowed a scheduled “Downtime” in order to switch to the new system but must give a 30 day notice to the government when the shutdown is scheduled to happen.
5. The pre-proposal conference and site visit concluded at 1040 hours.
Bldg 5010 (Smoky Hill ANG Range) Site Visit, 17 May 2023, 1100
1. The pre-bid portion of this project was completed on 16 May 23 prior to the building 35 site visit. All the contractors that attended the B5010 site visit were at the pre-bid conference on the 16th. Site visit started at 11:00 AM and ended at approximately 11:20AM
2. The contractors were escorted to the building and were given access to both the communications room and the mechanical room. Pictures were allowed.
3. It was re-iterated that the procurement is currently unfunded.
4. All attendees were given a chance to ask questions.
Question asked:
A. Can you get vehicle access to the back area where the communications and mechanical room are located? The answer is yes. Access to the back with work vehicles is allowed.
Brent E. Geschwentner, SMSgt
184W BASE CONTRACTING OFFICER
Mr. Darin L. Brun, GS12
CONTRACTING OFFICER
Attachments Sign-in Sheets
PRE-CONSTRUCTION CONFERENCE ATTENDANCE SHEET
Project No. PRQE 222193 Project Title: Replace UPS and Electrical; Upgrade Bldg.’s 35 & 5010
NAME FIRM/OFFICE SYMBOL POSITION / TITLE PHONE EMAIL ADDRESS
tl≤Pt SiVW~S VPrt4Cot~ DP ~-~ba~ 31St-~~S.~. t~A ~V~uco~u~.co
V ~C~- )41L~L- V A-L-LC.~VR~ g 11, -~ 13~3 i vp~ct~- s v*t-~C~it~ u.~c.
~ ~ ~-~c\~ P~~\ ~-2$3-%~~~
~L~ ~ O~~1OC~ &io(4t~~
-~- ~ ~ s ~ 90 ~fl-~ - —#~z.€ ~
NAME FIRM/OFFICE SYMBOL POSITION / TITLE PHONE EMAIL ADDRESS
ti’≤ii Sv~~ OP ~i~4ia 31~b-~~S~. USA @)VI4UC~LLC.Co
V ~C6- j4ii~i- V ~LCVR~ 311, -~ 13 ~-2.3 i vp~c& s VWt-tCij~t~ uc.
~ ~ ~-2S3-%8~ ~
~ÔL~ ~jq~
15 D 9D ~t7(. - S~4~ ~ 6~SD 1e1f Ca~
The undersigned attended a Pre-Construction Conference on 17 May 2023 at 11:00 AM hours in Building 5010, Classroom
NAME FIRM/OFFICE SYMBOL POSITION I TITLE PHONE EMAIL ADDRESS
Darin Brun 184 MSC Contracting Officer 759-7591 Darin.brun@us.af.mil
Jeremiah Shaw 184 CE Civil Engineering Asst 759-7477 jeremiah.shaw.4~us.af.mil
S ~S ~ I OS) s~
~ C~ 3 - ~~3j3 ~ 3 ~ g/’~-qo~.c~7p-~z ~ ~ AC~c~~~
~________ Q ~ ~
I-s
| 2023-05-18T09:11:01-0500 | |
| GESCHWENTNER.BRENT.EDWARD.1150400070 |
| 2023-05-18T09:07:30-0500 | |
| BRUN.DARIN.LEE.1149519250 |
File details come from the government source that posted it. Updated .