STATEMENT OF WORK

KANSAS AIR NATIONAL GUARD, McCONNELL AFB VUBV192836 Repair B6013 for Temp ASOS Fitness Center 11 March 2020

SW-1 LOCATION: Smoky Hill National Guard Range Site, Salina, Kansas. Arrangements for entrance onto Smokey Hill must be made by calling (316) 759-8579 between the hours of 7:00 a.m. and 4:00 p.m., Monday through Friday.

SW-2 SCOPE OF WORK: The work covered in this contract consists of furnishing all plant, labor, expertise, equipment, materials, facilities, transportation, and appliances necessary to perform operations in connection with the work described in paragraph SW-3. It is the intent of the government for the contractor to provide a complete and useable system. Any relevant details required for a complete system that are omitted in the contract plans and specifications will be provided by the Contractor at no cost to the government.

SW-3 SUMMARY OF WORK: Work shall consist of but is not limited to the following:

Site Work: Create drainage ditch along the west side of building 6013. This will include the removal of equipment pads, a concrete cistern, a temporary gutter drain system and excess dirt piled up against the side of the building.

Install a mow strip and poured splash blocks along the West side of the building. Extend existing down spouts and add 90 degree turns. Due to water infiltration, the ditch will need to be created prior to any finish work being completed on the lower portion of the interior walls of the building. All disturbed areas shall be seeded with an erosion control mix of buffalo, rye and fescue after finish grade is established. The contractor shall water the seeded area the first time. The Government shall be responsible for watering the site after that.

Install equipment pads and bollards for HVAC on the NWand SW corners of the building.

Install new Propane line from tank to building.

Interior Work: Repair and/or replace up to 400 SF of exposed wall insulation. Repair and/or replace up to 500 SF of exposed ceiling insulation (Match or exceed existing R-Values). Modify wall structure and openings to allow metal wall panels to be installed (Match existing metal wall panels).

Relocate electrical devices and conduit as needed to allow metal wall panels to be installed. Provide all electrical necessary for a complete and usable HVAC system.

Install two separate 5 ton HVAC systems per drawing.

SW-4 CODES & STANDARDS: All work performed under this contract shall be in accordance with federal, state and local codes & standards, as well as widely accepted industry standards, including but not limited to: American Institute of Architects, American Concrete Institute, American Institute of Electrical Engineers, American Institute of Steel Construction, American National Standards Institute, American Society of Heating, Refrigerating and Air- Conditioning Engineers, American Society of Mechanical Engineers, American Society of Testing Materials, National Bureau of Standards, National Electric Code, American Welding Society, Brick Institute of America, Building Officials and Code Administrators, Federal Aviation Administration, National Fire Protection Association, National Electric Code, Occupational Safety & Health Administration, Rubber Manufacturers Association, Underwriters Laboratories, and the Kansas DOT. standard specification. Additionally, all requirements of the Kansas Department of Health must be satisfied in their entirety for any work performed or materials bought under this contract. Failure to comply with any of the aforementioned codes and standards shall be considered as a failure to comply to contract specifications.

SW-5 UTILITIES: Contractors shall coordinate with all local utilities having jurisdiction.

SW-6 CALL BEFORE YOU DIG: Contact Smoky Hill ANGR civil engineer personnel (316-759-8579) to request dig permit. Contractors shall be responsible for maintaining all markings throughout construction period.

SW-7 CONFINED SPACE: N/A to this project.

SW-8 MATERIALS: The materials shall conform to applicable industry codes and standards and the manufacturer's recommendations, which ever is more stringent. Certificates of compliance and Technical Data Sheets are required for all materials supplied.

SW-9 SITE INSPECTION: The Contractor is required to acknowledge, at time of Bid Opening that said contractor has inspected, and is fully cognizant of conditions at the site. No allowance or consideration will be given after award for any condition(s) which was(were) existing at the time of the site visit.

SW-10 BASE ACCESS: The contractor shall be granted access to Smoky Hill ANGR to complete this project. All other areas are off limits. The Government reserves the right to deny access to any person, with no consequence to the contract.

SW-11 SAFETY: Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the commercial contractor. Government employees must comply with

AFOSH.

SW-12 CLEAN-UP: Clean-up and remove debris generated by this contract to an approved off-base location. Two

(2) copies of the receiving (tipping or dumping) tickets, with a cover letter from the Prime Contractor stating the full name and address of the location to which debris was taken.

SW-13 GOVERNMENT RESOURCES: No Government resources shall be made available to the contractor, unless otherwise stated in this Statement of Work. The contractor shall provide for all necessary resources to provide a complete and usable facility or systems as described in the contract documents. The contractor shall not obligate Government resources in any manner. The Government shall seek remedy for any obligation or encumbrance imposed by the Contractors actions. Government resources include, but are not limited to, government owned materials, equipment, tools, vehicles, personnel and facilities.

SW-14 SUPPLEMENTAL

7 Page Drawing Set

STATEMENT OF WORK
11 March 2020

File details come from the government source that posted it. Updated .