DCFT 232007 Schedule of Material Submittals.pdf
PDF 61 KB Posted
- Attached to
- 183 CES Repair Vehicle Barriers
- Solicitation number
- W50S7U-25-B-A002
- Issued by
-
Department of the Army National Guard
About this file
This is a Schedule of Material Submittals for a Vehicle Barrier Repairs project. The document is associated with Solicitation/Contract Number W50S7U-25-B-A002 and Project Number DCFT 232007. The schedule outlines six key submittal categories requiring documentation, including Bonds, Work Schedule, Vehicle Drop Arm Barriers System, Operational Checks/Test Reports, Warranty information, and Safety Data Sheets (SDS) for materials. The form provides a structured template for tracking required submissions, with columns for number of copies, submission dates, contractor notifications, and approval status, to be completed by the Project Engineer and Contract Administrator.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).
Approved Disapproved
1 Bonds 1
2 Work Schedule 1
3 Vehicle Drop Arm Barriers System 1 1 1 1 1 1 1 1 1 1
4 Operational Checks/Test Reports 1 1
5 Warranty (Workmanship/Manuf.) 1 1
6 SDS for materials 1 1
Re tu rn S us pe ns e
D at e
Te ch ni ca l D at a
Te st
R ep or ts
D at e to
C iv il En gi ne er in g
Sa m pl es
Co lo r S el ec tio n
M an uf ac tu re r's R ec om m en da tio n
M an uf ac tu re r's W ar ra nt y
Ca ta lo g
D at a
Project Number:
DCFT 232007
Project Title:
Vehicle Barrier Repairs
Solicitation / Contract Number:
W50S7U-25-B-A002
Remarks
(To be completed by Project Engineer)
Li ne
N um be r
Re qu ire d
Su bm is si on D at e
Item or Description of Item, Contract Reference, Type of Submittal
Ce rt ifi ca te o f C om pl ia nc e
Sh op
D ra w in gs
Date Contractor Notified
(To be completed by Contract Administrator)
Su bm itt al
N um be rs
Co nt ra ct or R es ub m itt al
Fi na l A pp ro va l
Number of Copies Required
D at e Re ce iv ed in
C on tr ac tin g
Fi el d Re po rt s
O pe ra tin g In st ru ct io ns
Sc he du le s, L is tin gs , R ep or ts , P la ns
Material Submittals Schedule