Attachment 1_Performance Work Statement.pdf
PDF 72 KB Posted
- Attached to
- POL Gate Replacement, Scott AFB
- Solicitation number
- W50S7S26Q0019
- Issued by
-
Department of the Army National Guard
About this file
This is a Performance Work Statement (PWS) for the repair and replacement of security gates at Building 5036, POL Facility, Scott Air Force Base, issued by the 126th Air Refueling Wing on August 6, 2026. The contractor must complete all work within 90 calendar days after contract award and is responsible for project management, supervision, labor, materials, equipment, and transportation. Work includes daily site cleanup and coordination with the assigned Contracting Officer's Representative, with full compliance required for base security, safety, and environmental regulations.
The project comprises two distinct tasks under separate Contract Line Item Numbers (CLINs). Task 1 (CLIN 0001) requires repair of the front gate operator system to fully operational condition, including furnishing and installing new gate roller covers, universal radio receiver, associated remote transmitters, drive belts, #40 drive chain, and safety photo eyes. Task 2 (CLIN 0002) requires complete replacement of the rear gate system, including removal and proper disposal of two failed swing gate operators, formation and pouring of new reinforced concrete equipment pads, installation of two new commercial-duty swing gate operators (basis of design: LiftMaster CSW24UL or equivalent), and all associated safety and access control components to deliver a complete turnkey system. Upon completion, the contractor must provide manufacturer's manuals, warranty documentation, and remote transmitters to the COR and schedule a joint final inspection to demonstrate all PWS requirements have been met.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6 August 2026
Performance Work Statement (PWS)
Repair and Replacement of Security Gates, Building 5036 126th Air Refueling Wing, Scott AFB, IL
1.0 GENERAL INFORMATION
1.1. Scope: The contractor shall provide all project management, supervision, labor, materials, equipment, and transportation necessary to repair one (1) front vehicle security gate system and completely replace one (1) rear vehicle security gate system at the POL Facility, Building 5036, Scott Air Force Base. The objective is to restore both gates to fully operational, safe, and secure condition in compliance with all applicable security standards.
1.2. Background: The existing vehicle security gates at the POL Facility (Bldg 5036) are. The front gate operator is in poor condition and poses a risk of failure. The rear gate operator system is completely inoperable. This project is required to restore the required level of security, ensure controlled access, and protect critical fuel assets.
1.3. Period of Performance: The contractor shall complete all work specified herein within 90 calendar days after contract award.
1.4. General Requirements:
• The contractor shall perform all work in a professional manner and shall be responsible for daily cleanup of the project site.
• All contractor activities shall be coordinated with the assigned Contracting Officer's Representative (COR).
• The contractor shall comply with all applicable base security, safety, and environmental regulations.
2.0 SPECIFIC TASKS
The contractor shall perform the following tasks:
2.1. Task 1: Front Gate Operator System Repair (CLIN 0001)
The contractor shall repair the existing front gate operator system to a fully operational, safe, and compliant condition. At a minimum, the contractor shall furnish and install the following new components:
• Gate Roller Covers
• Universal Radio Receiver
6 August 2026
• Associated Remote Transmitters
• Drive Belts
• #40 Drive Chain
• Safety Photo Eyes
2.2. Task 2: Rear Gate Operator System Replacement (CLIN 0002) The contractor shall perform a complete "repair by replacement" of the rear gate system.
This shall include, at a minimum:
• Complete removal and proper disposal of the two existing, failed swing gate operators and all associated legacy components.
• Formation and pouring of new, appropriately sized reinforced concrete equipment pads to support the new gate operators.
• Furnishing and installing two (2) new commercial-duty swing gate operators. The basis of design is the LiftMaster CSW24UL or an equivalent system that meets or exceeds all performance, safety, and compatibility specifications of the basis of design.
• Furnishing and installing all associated safety and access control components required to deliver a complete and turnkey system, including but not limited to, a universal receiver, remote transmitters, safety photo eyes, and any other devices required to meet current safety standards.
3.0 COMPLETION AND ACCEPTANCE
• 3.1. Standard of Completion: All work shall be considered complete when both gate systems are fully operational, all project-generated debris has been removed from the site, and the systems have been tested and accepted by the Government.
• 3.2. Final Inspection: Upon completion, the contractor shall schedule a joint final inspection with the COR to demonstrate that all requirements of this PWS have been met.
• 3.3. Deliverables: The contractor shall provide all manufacturer's manuals, warranty documentation, and remote transmitters for each gate system to the COR upon completion.