Site Visit Slides - RPR Signage B25.pdf

PDF 599 KB Posted

Attached to
RPR Signage Building 25 - JKSE252403
Solicitation number
W50S7L-25-Q-A005
Issued by

About this file

This is a site visit presentation for a federal contract opportunity with the 120th Airlift Wing of the Montana Air National Guard. The project involves applying custom graphic logos and lettering to buildings 25 and 80 at the Great Falls International Airport to better identify the unit's presence. The contract is a 100% small business set-aside with a project magnitude of less than $25,000, and a contract duration of 30 days.

Key details include quotes due on 23 September 2025 at 10:00 AM MDT, to be submitted electronically via email to MSgt Anthony Barille. Contractors must provide all supplies, equipment, labor, and management necessary to prepare and paint custom logos, with a 1-year warranty on materials and labor. The solicitation documents will be available on SAM.gov, and potential bidders are advised to check the website regularly for amendments. Questions must be submitted in writing by 18 September 2025 at 10:00 AM MST, with answers to be posted on the website as amendments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

**Welcome, Please Sign in as you enter**

Site Visit

16 September 2025 @ 10:00 AM

BCE Building 60, Great Falls, MT

Repair Signage Building 25

120th Airlift Wing

W50S7L-25-Q-A005

Agenda Repair Signage Building 25

• Introductions (Gov’t and Contractor)

• Synopsis

• Important Dates

• Solicitation

• Disclaimers/Questions

16 September 2025 2

Introduction / Purpose

Buildings 62 & 79 Repair and Replace Roofs

Intros:

MSgt. Anthony Barille– Contracting Officer

Maj Aaron Jewett– Contracting Officer Representative

Purpose:

Familiarization with site

Not intended for re-design/technical questions or interpretations by technical personnel

16 September 2025 3

Contractor Introduction

Your Name

Company

Position in Company

Prime or Subcontractor

16 September 2025 4

Synopsis

The Wing is requesting custom graphic logos and lettering be applied to buildings 25 & 80 to better identify the presence of the 120th Air National Guard on the Great Falls International Airport.

The Contractor proposal shall be submitted with quantities, unit prices, mobilization and costs included. The Contractor shall dispose of all excess paint, drop cloths, and other items at their cost. The contractor shall provide all supplies, parts, equipment, tools, labor, personnel, transportation, supervision, and management necessary to Prepare & Paint Custom Logos Plus provide a warranty of 1 years materials and 1 year labor. The project will be completed in accordance with the project contract documents, drawings, specifications, Federal and State law, and the terms and conditions of the contract.

16 September 2025 5

Synopsis Cont.

16 September 2025 6

Synopsis Cont.

CLIN 0001

Contract Duration: 30 Days ANP

100% Small Business Set-Aside

Magnitude of Project: less than $25,000

16 September 2025 7

Quote Due Dates

Quotes Due: 23 September 2025 @ 1000

(10:00 AM MDT)

Payment & Performance Bonds Not Required

No late submissions will be accepted

No Facsimile offers

Quotes must be signed by the person authorized

16 September 2025 8

Quote Due Dates Cont.

Complete quote package listing in Section 00 10 00 (Page 04 of Solicitation)

Electronic Quotes

Submit quotes via email to:

MSgt Anthoy Barille: anthony.barille@us.af.mil

Complete quote submission instructions in Section 00 21 00 (Page 6 of Solicitation)

16 September 2025 9 mailto:anthony.barille@us.af.mil

Solicitation

On the Web – https://SAM.gov Check website regularly for Amendments and

Updates Amendments must be acknowledged on quote

Questions / Answers will be posted on SAM.gov Must be received 5 days prior to quote due date

(09/18/2025)

Contractor’s responsibility to read entire Solicitation and all amendments

16 September 2025 10 https://sam.gov/

Solicitation Questions

Questions must be submitted in writing to Contracting Officer listed in the solicitation

ONLY questions/answers and information through an amendment are part of the solicitation/contract process

All questions, on a non-attribution basis, and the answers will be posted to the FBO website as an amendment

Check web site regularly for amendments to solicitation

Do not call technical personnel (Engineers)

Suspense Date for Questions (18 September 2025 @

10:00AM MST)

16 September 2025

Disclaimer

Quoters are strongly cautioned to carefully read the requirements of the solicitation and comply accordingly

16 September 2025 12

Questions

The briefing slides, Site visit minutes, list of attendees and any question and answers that were provided during the meeting should be recorded and posted to the GPE (Contract Opportunities) with other solicitation documents.

This will ensure that all bidders/offerors are provided the same information.

Site Visit

16 September 2025 13

**Welcome, Please Sign in as you enter**
Agenda
Introduction / Purpose
Contractor Introduction
Synopsis
Synopsis Cont.
Synopsis Cont.
Quote Due Dates
Quote Due Dates Cont.
Solicitation
Solicitation Questions
Disclaimer
Questions

File details come from the government source that posted it. Updated .