Questions and Answers as of 8-13-2020.pdf

PDF 490 KB Posted

Attached to
JKSE 172216, Install Crane, B80
Solicitation number
W50S7L-20-B-0001
Issued by

About this file

This document contains questions and answers regarding solicitation W50S7L20B0001 for the JKSE 172216 project to install a crane at Building 80. The project will include installing air conditioning, constructing structural supports for a bridge crane and fall arrest system, adding supplementary heat, repairing the hangar floor, installing flexible pavement, and a domestic water line. Questions addressed installation methods, geotechnical reports, safety system manufacturers, and the scope of work for a fire hydrant lead. The solicitation is set aside 100% for small businesses under NAICS code 236220 with a size standard of $39.5 million. Funding may become available by September 30, 2020 and award will be made to the responsible bidder offering the most advantageous price.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation W50S7L20B0001 - JKSE 172216, Install Crane, Bldg 80

Question and Answers as of 13 August 2020

1. Question: On Details 1/S5.0 and 3/S5.0. As I understand it, I can use #4’s @ 12” O. C. embedded 6” into the existing slab w/epoxy in all areas .Except where NOTE A on Sheet S2.0 which is identified as

40’-0”. On Detail 3/S5.0 it does say see Note, but using #4’s @ 12” O.C. embedded into existing slab w/epoxy should apply as detail 1/S5.0. I hope I exampled this correctly. In other words except NOTE

A (40’-0”) Sheet S2.0. I can use #4’s @ 12” O. C. embedded 6” into existing slab w/epoxy?

Answer: Pending

2. Question: Detail 3/S5.0 where it indicates Existing Door Slab Rails & Slab. Note “Existing Dowels to

Grease one side of Dowel”. Is it allowed to cut the existing dowel off and use #4’s @ 12” O.C.

embedded 6” into existing slab w/epoxy.

Answer: Pending

3. Question: I would appreciate receiving the Geotechnical Report for MANG Install Crane B80.

Answer: See attachment “B25_80 Geotech Report.pdf”

4. Question: Under SECTION 11 81 29.1 FACILITY FALL PROTECTION AND SECTION 11 81 29.2 ROOF

PROECTION SAFETY SYSYEMS. Under Product Data Manufacture it did not have a list of specific manufactures. Do you have preference for a manufacture.

Answer: No, as long as it meets specifications. Manufacturer will be approved through the submittal process after award.

5. Question: Is the fire hydrant lead in the below clouded area a part of this projects scope? I would recommend doing it at the same time as the rest of this waterline work.

Answer: Yes, that hydrant is in the scope, per print.

6. Question: If the hydrant lead is a part of scope. I believe it will have the same adjustment required as the other waterlines have required when crossing that storm drain.

Answer: 2. Yes, it will have the same adjustment when crossing the storm drain.