W50S7524B0001_146_CES_Repair_Hangar_Bldg_801_Atch-06_Bid_Breakout_by_CSI.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- W50S7524B0001
- Issued by
-
Department of the Army National Guard
About this file
This document is a bid breakout worksheet for a federal construction contract opportunity. The worksheet provides instructions for contractors to provide a detailed cost breakdown by Construction Specifications Institute (CSI) Division for each Contract Line Item Number (CLIN) in the solicitation. The worksheet requires contractors to input values for general conditions, general requirements, general contractor markup, and general contractor bond and insurance as a percentage of the subtotal costs. The overall solicitation is for the repair of a maintenance hangar building at the 146th Airlift Wing in Channel Islands, California. Key details include a site visit on May 8, 2024, RFI questions due by May 24, 2024, and bid opening on May 29, 2024. The solicitation includes multiple attached documents such as plans, specifications, and mechanical information. This worksheet is meant to provide a standardized format for contractors to submit their detailed pricing for the various work categories associated with this construction project.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE
Instructions:
1. Provide a breakout of each CSI Division (these are the rows) for each CLIN (these are the columns).
2. Values for A - General Conditions, B - General Requirements, C - General Contractor Markup, and D - General Contractor Bond and Insurance are required. Input the value as a percent. All of the values to the right will be populated automatically.
3. Provide a value for all cells, even if that value is zero ($0). Please do not leave any cells blank.
4. It is understood that there will be rounding differences between your formal bid schedule and the calculations on this worksheet, but the values here should be reflective of your formal bid schedule.
| Solicitation No. |
| Project Title |
| Firm Name |
| Firm CAGE |
| Firm UEID |
| POC Name |
| POC Email |
| POC Telephone |
| CSI | ||||
| Division | Divison Description | CLIN 0001 | ||
| Base Bid | CLIN 0002 | |||
| Option 1 | CLIN 0003 | |||
| Option 2 | CLIN 0004 | |||
| Option 3 | CLIN 0005 | |||
| Option 4 | CLIN 0006 | |||
| Option 5 | CLIN 0007 | |||
| Option 6 | CLIN 0007 | |||
| Option 6 | CLIN 0007 | |||
| Option 6 | CLIN 0007 | |||
| Option 6 | Total | |||
| 1 | General Requirements | $ - | ||
| 2 | Existing Conditions | - | ||
| 3 | Concrete | - | ||
| 4 | Masonry | - | ||
| 5 | Metals | - | ||
| 6 | Woods, Plastics, and Composites | - | ||
| 7 | Thermal and Moisture Protection | - | ||
| 8 | Openings | - | ||
| 9 | Finishes | - | ||
| 10 | Specialties | - | ||
| 11 | Equipment | - | ||
| 12 | Furnishings | - | ||
| 13 | Special Construction | - | ||
| 14 | Conveying Equipment | - | ||
| 21 | Fire Suppression | - | ||
| 22 | Plumbing | - | ||
| 23 | Heating, Ventilating, and Air Conditioning (HVAC) | - | ||
| 24 | Integrated Automation | - | ||
| 25 | Electrical | - | ||
| 26 | Communications | - | ||
| 27 | Electronic Safety and Security | - | ||
| 28 | Earthwork | - | ||
| 31 | Exterior Improvements | - | ||
| 32 | Utilities | - | ||
| 33 | Transportation | - | ||
| 34 | Waterway and Marine Construction | - | ||
| 35 | Process Interconnections | - | ||
| 40 | Material Processing and Handling Equipment | - | ||
| 41 | Process Heating, Cooling, and Drying Equipment | - | ||
| 42 | Process Gas and Liquid Handling, Purification, and Storage Equipment | - | ||
| 43 | Pollution and Waste Control Equipment | - | ||
| 44 | Industry-Specific Manufacturing Equipment | - | ||
| 45 | Pollution and Waste Control Equipment | - | ||
| 46 | Water and Wastewater Equipment | - | ||
| 48 | Electrical Power Generation | - | ||
| Subtotal |
Microsoft Office User: Subtotal:
| Sum of all CSI Divisions | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| A - General Conditions |
Microsoft Office User: General Conditions:
| Subtotal * A | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - |
| B - General Requirements |
Microsoft Office User: General Requirements:
| Subtotal * B | - | - | - | - | - | - | - | - | - | - | - |
| C - General Contractor Markup |
Microsoft Office User: General Contractor Markup:
| (Subtotal + A + B) * C | - | - | - | - | - | - | - | - | - | - | - |
| D - General Contractor Bond & Insurance |
Microsoft Office User: General Contractor Bond & Insurance:
(Subtotal + A + B + C) * D
| - | - | - | - | - | - | - | - | - | - | - |
| Total Bid |
Microsoft Office User: Total Bid:
Subtotal + A + B + C + D Microsoft Office User: Subtotal:
Sum of all CSI Divisions Microsoft Office User: General Conditions:
Subtotal * A Microsoft Office User: General Requirements:
Subtotal * B Microsoft Office User: General Contractor Markup:
(Subtotal + A + B) * C Microsoft Office User: General Contractor Bond & Insurance:
(Subtotal + A + B + C) * D