W50S7524B0001_146_CES_Repair_Hangar_Bldg_801_Atch-06_Bid_Breakout_by_CSI.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Solicitation: 146 AW Channel Islands FY24 Maintenance Hanger Repair
Solicitation number
W50S7524B0001
Issued by

About this file

This document is a bid breakout worksheet for a federal construction contract opportunity. The worksheet provides instructions for contractors to provide a detailed cost breakdown by Construction Specifications Institute (CSI) Division for each Contract Line Item Number (CLIN) in the solicitation. The worksheet requires contractors to input values for general conditions, general requirements, general contractor markup, and general contractor bond and insurance as a percentage of the subtotal costs. The overall solicitation is for the repair of a maintenance hangar building at the 146th Airlift Wing in Channel Islands, California. Key details include a site visit on May 8, 2024, RFI questions due by May 24, 2024, and bid opening on May 29, 2024. The solicitation includes multiple attached documents such as plans, specifications, and mechanical information. This worksheet is meant to provide a standardized format for contractors to submit their detailed pricing for the various work categories associated with this construction project.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE

Instructions:

1. Provide a breakout of each CSI Division (these are the rows) for each CLIN (these are the columns).

2. Values for A - General Conditions, B - General Requirements, C - General Contractor Markup, and D - General Contractor Bond and Insurance are required. Input the value as a percent. All of the values to the right will be populated automatically.

3. Provide a value for all cells, even if that value is zero ($0). Please do not leave any cells blank.

4. It is understood that there will be rounding differences between your formal bid schedule and the calculations on this worksheet, but the values here should be reflective of your formal bid schedule.

Solicitation No.
Project Title
Firm Name
Firm CAGE
Firm UEID
POC Name
POC Email
POC Telephone
CSI
DivisionDivison DescriptionCLIN 0001
Base BidCLIN 0002
Option 1CLIN 0003
Option 2CLIN 0004
Option 3CLIN 0005
Option 4CLIN 0006
Option 5CLIN 0007
Option 6CLIN 0007
Option 6CLIN 0007
Option 6CLIN 0007
Option 6Total
1General Requirements$ -
2Existing Conditions-
3Concrete-
4Masonry-
5Metals-
6Woods, Plastics, and Composites-
7Thermal and Moisture Protection-
8Openings-
9Finishes-
10Specialties-
11Equipment-
12Furnishings-
13Special Construction-
14Conveying Equipment-
21Fire Suppression-
22Plumbing-
23Heating, Ventilating, and Air Conditioning (HVAC)-
24Integrated Automation-
25Electrical-
26Communications-
27Electronic Safety and Security-
28Earthwork-
31Exterior Improvements-
32Utilities-
33Transportation-
34Waterway and Marine Construction-
35Process Interconnections-
40Material Processing and Handling Equipment-
41Process Heating, Cooling, and Drying Equipment-
42Process Gas and Liquid Handling, Purification, and Storage Equipment-
43Pollution and Waste Control Equipment-
44Industry-Specific Manufacturing Equipment-
45Pollution and Waste Control Equipment-
46Water and Wastewater Equipment-
48Electrical Power Generation-
Subtotal

Microsoft Office User: Subtotal:

Sum of all CSI Divisions$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
A - General Conditions

Microsoft Office User: General Conditions:

Subtotal * A$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -
B - General Requirements

Microsoft Office User: General Requirements:

Subtotal * B-----------
C - General Contractor Markup

Microsoft Office User: General Contractor Markup:

(Subtotal + A + B) * C-----------
D - General Contractor Bond & Insurance

Microsoft Office User: General Contractor Bond & Insurance:

(Subtotal + A + B + C) * D

-----------
Total Bid

Microsoft Office User: Total Bid:

Subtotal + A + B + C + D Microsoft Office User: Subtotal:

Sum of all CSI Divisions Microsoft Office User: General Conditions:

Subtotal * A Microsoft Office User: General Requirements:

Subtotal * B Microsoft Office User: General Contractor Markup:

(Subtotal + A + B) * C Microsoft Office User: General Contractor Bond & Insurance:

(Subtotal + A + B + C) * D

File details come from the government source that posted it. Updated .