W50S6X-21-R-0004- AMENDMENT 01 (MODIFIED).pdf
PDF 242 KB Posted
- Attached to
- Base HVAC Repairs Federal contract opportunity
- Solicitation number
- W50S6X-21-R-0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W50S6X-21-R-0004- AMENDMENT 03 (CONFORMED).pdf | ||
| W50S6X-21-R-0004- AMENDMENT 03 (MODIFIED).pdf | ||
| W50S6X-21-R-0004- AMENDMENT 02 (MODIFIED).pdf | ||
| W50S6X-21-R-0004- AMENDMENT 02 (CONFORMED).pdf | ||
| W50S6X-21-R-0004 Site Visit Minutes (MISC HVAC).pdf | ||
| W50S6X-21-R-0004 Site Visit Sign-In Sheet (MISC. HVAC Repairs).pdf | ||
| W50S6X-21-R-0004- AMENDMENT 01 (CONFORMED).pdf | ||
| MISC HVAC QUESTIONS AND ANSWERS.pdf | ||
| W50S6X-21-R-0004- RFP - Attachment 1 - VISITOR REQUEST WORKSHEET.pdf | ||
| W50S6X-21-R-0004- RFP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F6N3CE1119AW01 JLWS212123
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is as follow s:
a. Post the Questions and Answ ers from the site visit that occurred on 03 August 2021.
b. Break out the CLINS. CLIN 0001 for buildings 2902, 2812 and 2815 is changed to CLIN 0001 2902, CLIN 0002 2812, and CLIN 0003 2815.
c. Add in CLIN 0004 as an Option (Building 2812- 2 Hydronic Coils).
d. to Change the magnitude from $25,000-$100,000 to $100,000-$250,000.00 due to the added option.
e. Revise Building 2815's Description, Serial No., Equipment Type, Manufacturer, Model No., reference Section 5 of the SOW.
f. all other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S6X21R0004
X 9B. DATED (SEE ITEM 11)
22-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Aug-2021
CODE
USPFO DE 166 MSC
2600 SPRUANCE DR
NEW CASTLE DE 19720-1615
W50S6X 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S6X21R0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required performance has changed from Work shall be performed in accordance w ith the plans and specifications.This project is being solicited as Total Small Business Set Aside.The North American Industry Classification System (NAICS) Code is 238220, and the Small Business Size Standard is $16,500,000.00.In accordance with FAR 36.204, the construction project magnitude is betw een $25,000.00 and $100,000.00.A pre-bid conference and site visit has been scheduled. See Section 00100 and Clause 52.236-27 for details.Award will be made to the responsible offeror who conforms to the solicitation and is most advantageous to the Government considering onlyprice and price related factors. Evaluation of offerors w ill be in accordance w ith FAR 13.106-2 in Section 00120.Proposals shall only be submitted using email to: kelly.hess@us.af.milSF1442, BLOCK 11 - SEE SECTION 00700, CLAUSE 52.211-10 FOR PERIOD OF PERFORMANCE to Work shall be performed in accordance w ith the plans and specifications.This project is being solicited as Total Small Business Set Aside.The North American Industry Classification System (NAICS) Code is 238220, and the Small Business Size Standard is $16,500,000.00.In accordance with FAR 36.204, the construction project magnitude is betw een $100,000.00 and $250,000.00.A pre-bid conference and site visit has been scheduled. See Section 00100 and Clause 52.236-27 for details.Award will be made to the responsible offeror who conforms to the solicitation and is most advantageous to the Government considering onlyprice and price related factors.
Evaluation of offerors w ill be in accordance w ith FAR 13.106-2 in Section 00120.Proposals shall only be submitted using email to: kelly.hess@us.af.milSF1442, BLOCK 11 - SEE
SECTION 00700, CLAUSE 52.211-10 FOR PERIOD OF PERFORMANCE.
CLIN 0001
The CLIN description has changed from REPAIR HVAC BUILDINGS 2902, 2812, 2815 to REPLACE HVAC BUILDINGS 2902.
The CLIN extended description has changed from:
Building 2902- HP20 Heat Pump-20. All work shall be completed in accordance with the Statement of Work.Building 2812- (2) DX Units. All work shall be completed in accordance with the Statement of Work.Building 2815 - (3) DX Units. All work shall be completed in accordance with the Statement of Work.
To:
HP20 Heat Pump-20. All work shall be completed in accordance with the Statement of Work.
CLIN 0002 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job
REPLACE HVAC BUILDING 2812
FFP
Replace two DX Units in accordance with the SOW.
FOB: Destination
MFR PART NR: HVAC SERVICE
PSC CD: J045
NET AMT
CLIN 0003 is added as follows:
0003 1 Job
REPLACE HVAC BUILDING 2815
FFP
Replace three DX Units in accordance with the SOW.
FOB: Destination
CLIN 0004 is added as follows:
0004 1 Job
OPTION REPLACE BUILDING 2812 HYDRONIC COILS
FFP
Replace two Hydronic Coils in accordance with the SOW. The square footage for these coils are 500 SQFT and 2,400 SQFT.
FOB: Destination
DELIVERIES AND PERFORMANCE
The following Delivery Schedule for CLIN 0002 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
300 dys. ANP 1 F6N3CE - 166 CIVIL ENGINEER
DANIEL MITCHELL
BLDG. #2803
2600 SPRUANCE DRIVE
NEW CASTLE DE 19720
302-323-3429 FOB: Destination
F6N3CE
The following Delivery Schedule for CLIN 0003 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
300 dys. ANP 1 F6N3CE - 166 CIVIL ENGINEER
DANIEL MITCHELL
BLDG. #2803
2600 SPRUANCE DRIVE
NEW CASTLE DE 19720
302-323-3429
The following Delivery Schedule for CLIN 0004 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
300 dys. ANP 1 F6N3CE - 166 CIVIL ENGINEER
DANIEL MITCHELL
BLDG. #2803
2600 SPRUANCE DRIVE
NEW CASTLE DE 19720
302-323-3429
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0002:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The following Acceptance/Inspection Schedule was added for CLIN 0003:
The following Acceptance/Inspection Schedule was added for CLIN 0004:
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
ATTACHMENTS
Attachment 1 Visitor Worksheet
SECTION 01000
STATEMENT OF WORK JLWS212123
2021 HVAC Project
1. LOCATION: Delaware Air National Guard (DANG) Base, New Castle, DE 19720-1615.
Arrangements for entrance onto the Base must be made between the hours of 7:00 a.m. and 4:30 p.m., Monday through Friday..
2. PURPOSE: The 166th Airlift Wing (AW) requires heating, ventilation and air conditioning (HVAC) to support Wing operations and the maintenance of the unit’s current C-130 mission.
Several HVAC units are at end of life and very little has been upgraded since the original installation. While they have been maintained regularly, upgrades to heat pumps and DX units are necessary to meet requirements. The Government requires a solution that is durable, reliable and economical that meets all requirements of the Department of Defense (DOD), Air Force (AF) and National Guard Bureau (NGB).
3. SCOPE OF WORK: The work covered by this Statement of Work (SOW) consists of furnishing all labor, equipment, tools, materials, travel, lifts, licenses, and permits required to perform the work described herein. Contractor shall provide HVAC system any State of Delaware applicable codes, and industry standards. The project will be managed by the Project Manager.
4. WORK SUMMARY
CLIN LOCATION TYPE
0001-2902 2902-Heat Pump-20 (Main Scope) Replace 0002-2812 2812 (2) DX Units (Main Scope) Replace 0003-2815 2815 (3) DX Units (Main Scope) Replace 0004-2812 2812 (2) Hydronic Coils (Option) Replace
a. 2902-HP20 o Replace heat pump 20 on Building 2902 unit to address the following:
Tripping low suction pressure added 2 lbs of R410A After adding refrigerant, head pressure increased but suction pressure would not rise. Possible failed TXV.
b. 2812-DX o The (2) DX units on building 2812 require constant maintenance and have reached end of life. Both units need to be replaced and are no longer functional.
c. 2815-DX o The (3) DX units on building 2815 require constant maintenance and have reached end of life. Both units need to be replaced and are no longer functional.
d. 2812- HYDRONIC COILS (OPTION) o The hydronic coils on the (2) DX Units in building 2812 have reached end of life and need to be replaced. The square footage of the bulding is broken up into two sections. One is 500 SqFt and the other is 2400SqFt.
5. SPECIFICATIONS
a. Submittals: The contractor shall submit samples of all materials prior to commencing work on site; submittals shall be on AF Form 3000. Upon approval, the PM will return to the contractor an endorsed copy of the submittal request.
b. Materials: (Below are the units that are currently installed- any units proposed shall meet or exceed the technical specifications.
o CLIN 0001-2902-HP20 Similar to current 2.5 Ton unit:
Description Serial No. Equipment Type Manufacturer Model No.
MXS HP 20 4909V91554 AIR CONDITIONER CARRIER 50PSH030PCC60120
o CLIN 0002-2812-DX Similar to (2) current 3 Ton units:
Description Serial No. Equipment Type Manufacturer Model No.
SPLIT DX 106584771 AIR CONDITIONER GOODMAN CKJ36-1A
SLPIT SYSTEM DX 107448556 AIR CONDITIONER GOODMAN CK60-3
o CLIN 0003-2815-DX Similar to (3) current 3 Ton units:
Description Serial No. Equipment Type Manufacturer Model No.
DX UNIT E031351338 AIR CONDITIONER ARCOAIRE HAC242AKA5
MINI SPLIT A/C E033135165 AIR CONDITIONER ARCOAIRE HAC242AKA5
MINI SPLIT A/C E033135151 AIR CONDITIONER ARCOAIRE HAC242AKA5
ALL INSTALLED EQUIPMENT SHALL BE OPEN PROTOCOL, BACnet
COMPATIBLE. BUILDING 2815 AND 2902 EQUIPMENT NEEDS TO BE TIED INTO
CURRENTLY INSTALLED AUTOMATED LOGIC BAS.
c. Other Contractor Responsibilities:
o The contractor shall protect existing conditions to the extent possible. Shall repair and paint any damage incurred to exactly match existing conditions, including any damage or cutting of the walls, floors and ceilings.
o Above ground piping systems, pipe class ratings, and pipe materials and pipe fittings must match equivalent existing systems.
o The contractor shall make, modify, or enlarge penetrations through the interior and exterior walls as necessary to support placement of the unit, and routing of pipes.
o The contractor shall re-confirm and/or and determine the appropriate pipe sizes, design water flow rates, and heating and cooling capacities, and equipment sizes.
o The contractor shall perform all heating/cooling load calculations necessary to determine the required capacities and to support equipment sizing and selections.
o The contractor shall perform all hydronic calculations necessary to determine the required flow rates, pipe sizing and equipment sizing and selection. The contractor shall size piping and equipment IAW the manufacturer’s recommendation. Ensure that the work does not result in pipe noise or cavitation.
o Pipes and equipment shall be sized so that water velocities are kept low enough to avoid excessive noise or disturbance, and to allow energy efficient flow, and smooth operation o Both equipment and piping and equipment shall be insulated with pipe insulation with an all-service-jacket, with all seams sealed vapor tight. Minimally, pipe and equipment insulation must match that of equivalent, existing systems. Hydronic pipes located outdoors shall be wrapped in an aluminum all-service-jacket to protect from sun and outdoor weather elements.
o Hydronic flows and system operation shall be checked and confirmed by the contractor and approved by government before acceptance. The equipment and controls shall be adjusted to the final operating conditions.
o The contractor shall add, replace and/or install all necessary electrical wire, conduit, contactors, disconnects, homeruns, breakers and other electrical features as required to support the new electrical needs of the new equipment.
o The contractor shall replace and reconnect any plumbing or piping connections as necessary.
o Contractor shall provide a minimum one year warranty on parts, equipment and labor.
o Contractor shall make and seal building exterior walls and roof penetrations, as required and shall maintain the buildings envelope integrity.
6. DELIVERABLES:
a. Upon completion of project, Contractor shall provide (1) three-ring binder with paper copies of all shop drawings, catalog cuts, equipment manuals and warranty information and o CD with an electronic copy containing specifications for all installed equipment
b. Contractor shall provide training for State and Federal HVAC craftsman personnel on site.
c. Prior to starting work submit the C&D Debris Diversion Plan – this plan describes how the contractor will recycle (or dispose) of scrap metal, refrigerants, concrete, wood, green waste, asphalt or products. The contractor shall report the weight in tons of any materials that are recycled.
d. Contractor shall submit a waste management plan prior to starting work describing how waste will be stored and managed on site. The installation’s dumpsters cannot be used by the contractor. The contractor shall report in tons the weight of any wastes shipped off site for disposal and where the waste was taken.
e. Contractor shall submit safety data sheets (SDS) for any chemicals or hazardous materials that will use while working on the installation. The list shall state the commercial name, manufactures’ name, chemical name, and quantity to be used or stored on government property.
f. Contractor shall submit certificates of compliance and Technical Data Sheets are required for all materials supplied.
7. UTILITIES.
a. Contractors shall use lock out tag out with all local utilities when removing and installing equipment.
b. Contractor shall be responsible for injury to water pipes, gas pipes, oil pipes, electrical wires, conduits, drains, sewers, buildings and other structures that may be set within prosecution of the work, owned by individuals, firms, corporations or by the municipality.
8. SITE INSPECTION. The Contractor is required to acknowledge that said contractor is fully cognizant of conditions at the site. No allowance or consideration will be given after award for any condition(s), which existed at the time of award. Any site visits will be coordinated through Base Contracting office.
9. BASE ACCESS. The contractor shall provide a list of names, DOB, full SSN, Driver’s License number and state of issue of all employees who will be requesting base access to the PM, at least 2 weeks prior to the start of work. All employees will have a background check conducted by Security Forces prior to being granted base access. Once vetted the employees will go to the Security Forces Squadron to get issued a DBIDS badge. Each person must wear the badge in a prominent location. Access to the Base is limited to travel from the Main Gate to the Civil Engineering Office, Bldg. 2803. All other areas are off limits. All Contractor vehicles on
Base must have proof of Insurance and operator must have a valid driver’s license. Violations of these security requirements will revoke any or all passes. The government reserves the right to deny access to any person, with no consequence to the contract.
10. SAFETY.
a. The Contractor shall conduct his operation in accordance with all Federal, State and Local regulations and/or standards pertinent to "Safe Practices". Base Safety personnel shall inspect the job site to insure safety standards are met. Base Safety, through the PM, shall issue warnings or stop work not in compliance. All contract workers must wear proper personal protection equipment per OSHA requirements (i.e. ear plugs, safety goggles, welding helmet, improper Lockout Tag out).
b. Contractor shall not allow his employees, subcontractors, material, men or any other persons over whom he has control to enter or remain upon or allow any plant or materials to be brought or to remain upon any part of the Airport, which in the opinion of the PM would be a hazardous location. Equipment not actually in operation shall be kept clear of aircraft operating areas.
c. The Contractor shall furnish, erect, and maintain all barricades, warning signs, “rope offs”, detours, markings and other protection for hazards. When used during periods of darkness, the protection provided shall be suitably illuminated. Contractor shall place said protection prior to commencing work until their dismantling is directed by the Contracting Officer or his designated representative.
d. Radio Transmitter Restrictions. To preclude accidental actuation of sensitive electronic equipment transmitters shall not be used without prior approval. Cell phones greater than 4 watts, and any cell phone within the munitions compound, shall not be powered on.
11. FIRE PREVENTION AND PROTECTION. The Contractor shall comply with all fire protection measures prescribed by the base policies and practice. A written fire permit shall be obtained from the Base Fire Department each day for use of open flame devices, such as blowtorches, portable furnaces, tar kettles or gas and electric welding and cutting equipment.
The Contractor shall be liable for any fire loss to Government property attributable to negligence on his part of the Contractor, including failure to comply with fire prevention measures prescribed by terms of this contract. The request for the Burn Permit shall be initiated three (3) days prior to work commencement. The contractor may not proceed with burning operations until the Burn Permit has cleared. Keep all waste and rags in metal containers, tightly covered and remove waste from site daily. The contractor will be responsible for cleaning up any spills on the work site and reporting them to the Base Fire Department at 302-323-3450. Contractor shall take all precautions to avoid fire.
12. EMERGENCIES. Should tornado, hurricane, gale or heavy wind warnings be issued, take every practicable precaution to minimize danger to persons, to the work and to the adjacent property. Any damage caused by a failure to take every practicable precaution, shall be rectified or replaced to the complete satisfaction of the Contracting Officer and at no expense to the Owner. Injury to personnel, or damage to adjacent property because of the work shall be the complete responsibility of the Contractor, and he accepts exclusive liability for the same.
Precautions shall include, but not be limited to, closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing scaffolding and other temporary work.
13. CLEAN-UP. Clean-up and remove debris generated by this contract to an approved off-base location. Debris shall be trucked off site in an enclosed truck to prevent accidental loss of debris.
Two (2) copies of the receiving (tipping or dumping) tickets, with a cover letter from the Prime Contractor stating the full name and address of the location to which debris was taken.
Contractor shall keep work area clean at the end of each working day and clean-up entire locations at the completion of contract.
14. GOVERNMENT RESOURCES.
a. No Government resources shall be made available to the contractor beyond the use of restrooms and drinking water for contractor personnel, unless otherwise stated in this Statement of Work. The contractor shall provide for all necessary resources to provide a complete and usable facility or systems as described in the contract documents. The contractor shall not obligate Government resources in any manner. The Government shall seek remedy for any obligation or encumbrance imposed by the contractor’s actions.
Government resources include, but are not limited to, government owned materials, equipment, tools, vehicles, personnel and facilities. Contractor shall provide all material handling equipment, properly sized to move all equipment to accomplish the work.
a. Use of the site: Confine operations at the site to the areas permitted under the Contract.
Portions of the site beyond areas on which work is indicated are not to be disturbed.
Conform to site rules and regulations affecting the work while engaged in project construction.
o Keep existing driveways and entrances serving the premises clear and available to the
Owner and his employees at all times. Do not use these areas for parking or storage of materials.
o Do not unreasonably encumber the site with materials or equipment. Confine stockpiling of materials and location of storage sheds to the areas indicated. If additional storage is necessary, obtain and pay for such storage off-site.
o Lock automotive type vehicles, such as passenger cars and trucks, and other mechanized and motorized construction equipment when parked and unattended, so as to prevent unauthorized use. Do not leave such vehicles or equipment unattended with the motor running or the ignition key in place.
15. GOVERNMENT OCCUPANCY. The government will occupy the site and the existing buildings during the entire period of construction. Coordinate with the PM and cooperate fully with the occupant(s) during construction operations to minimize conflicts and to facilitate government usage. Perform the work so as not to interfere with the government’s operations.
Immediately report any issues/conflicts to the Contracting Officer or PM.
16. WORK SCHEDULE: Contractor shall submit for review and approval all work schedules with the Contracting Officer or his representative prior to beginning any work. Any deviations are to be submitted, in writing, to the Contracting Officer or his representative for approval.
a. Delays: Unavoidable minor delays during construction caused by essential defense activities (alerts, security checks, fire suppression practices, terrorist alerts, etc.) may occur due to mission requirements. These occur at the rate of about four (4) hours per month during the work day.
b. Construct work in stages to accommodate the Government’s use of the premises during the construction period.
c. There may other contractors working on site or in the in this area. Coordinate the construction schedule and operations with all other Contractors and Subcontractors performing work on the project, on site, or in the area.
d. No work shall be done other than during normal 8-hour, 5-day workweek without 48 hours advance notice to the Contracting Officer.
e. Overtime work for cement finishing must be anticipated by Contractor and shall be included in the contract price.
17. OCCUPIED BUILDINGS. The Contractor will be working in and around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer or PM. Leave fixed equipment in place and protect against damage or temporarily disconnect, relocate, protect, and reinstall at completion of work. The Government will remove and relocate other Government property in the areas of the buildings scheduled to receive work.
18. ANTITERRORISM/OPERATION SECURITY (AT/OPSEC) REQUIREMENTS:
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations. All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the PM or Antiterrorism Representative. AT Level I awareness training is available at the following website:
http://jko.jten.mil.
19. ENVIRONMENTAL: Prior to starting work, the contractor shall meet with the 166 AW Delaware Air National Guard Environmental manager to become aware of installation specific environmental policies and procedures on the installation.
a. As a contractor, you are obligated to comply with federal, state, and local environmental regulations/requirements, and DEANG Environmental Management System (EMS) requirements. Some of the environmental issues to be considered while completing your job at DEANG ANG include:
o Hazardous Material usage & management o Recovered Materials usage o Protection of native plants and birds o Dust control (caused by activities such as land stripping, trenching, sandblasting, etc.)
o Painting or cleaning operations air emissions control o Stormwater Discharges o C&D waste recycling / disposal o Waste management
b. Contractors shall take immediate corrective action to comply with environmental regulations/requirements if informed of a violation by the Contracting Office. If necessary, appropriate actions will be initiated through Contract Management to correct substandard environmental practices or conditions
c. Pursuant to 7 Delaware Admin Code Section 1106 contractors must take controls to prevent dust emissions during land clearing, construction, and demolition activities. Prior to starting work describe how you plan to suppress dust during the project.
20. POINTS OF CONTACT:
Project Manager/Civil Engineer Officer, Capt Adarsh Menon Facility Manager, Mr. Daniel Mitchell Contracting Officer, Ms. Kelly Hess Environmental Manager, Mr. Alex Rittberg
(End of Summary of Changes)