W50S6W25Q0003 Questions and Answers 23May25.docx

DOCX document 16 KB Posted

Attached to
HVAC SYSTEM & BOILER
Solicitation number
W50S6W25Q0003
Issued by

About this file

This document is a Questions and Answers (Q&A) file for Request for Quote (RFQ) W50S6W25Q0003 for an HVAC System and Boiler project at Joint Base Andrews, MD. The Q&A addresses technical details about the project, including confirmation that Variable Air Volume (VAV) units in Building 1217 have been pre-installed with local controls, and clarifying requirements for design drawings. Specifically, control drawings are required for Building 1217, and as-built drawings are needed for Building 3252, with instructions to follow the A/E/C Computer-Aided Design (CAD) Standard Release 6.2.

The associated federal contract opportunity involves HVAC system design, fabrication, and installation at Building 1217 and boiler replacement at Building 3252, both located at Joint Base Andrews. The project requires the contractor to provide all materials, equipment, labor, and management for complete system installation, including disconnecting and reconnecting gas, electric, and control systems. A mandatory site visit is scheduled for 21 May 2025 at 09:00 AM EST, with quotation submissions due by 6 Jun 2025 at 4:00 PM EST. The solicitation is issued by the Department of the Army National Guard and is being conducted as a combined synopsis/solicitation under Subpart 12.6.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ W50S6W25Q0003 HVAC SYSTEM & BOILER

Questions and Answers

1. Have the VAVs & Package unit in bldg. 1217 already been installed, piped, and ducted?

Yes

2. Do the VAVs have controllers and control valves Installed, if so what manufacture?

The VAVs have local controls and no three-way valves are installed.

3. Are design drawings required for either building?

Yes, Control drawings for B1217 As built drawings for B3252

4. If drawings are required, please provide a list of required design review submissions and quality of drawing sets.

Follow the A/E/C Computer-Aided Design (CAD) Standard Release 6.2.

5. Can specifications be listed on drawings instead of bound technical specifications?

Yes