RFI Question and Answer 26QA026 (Traffic Island Sloped Static Display) 1-5 BCC 07092026.pdf

PDF 178 KB Posted

Attached to
Remove Traffic Island and Construct Sloped Concrete Static Display
Solicitation number
W50S6T26QA026
Issued by

About this file

This is a Request for Information (RFI) responses document for federal contract opportunity W50S6T26QA026 titled "Remove Traffic Island and Construct Sloped Concrete Static Display," current as of July 9, 2026.

The document addresses five questions from potential contractors regarding project specifications and site conditions. Key details include: the F-15 display pedestal dimensions of 25.5' x 46.5' with variable height, requiring installation of formwork to create 60-degree angled sloped concrete sides against the existing pedestal; a pedestal block plan drawing is available but detailed dimensional drawings were not provided in the RFI responses; no restrictions or protection requirements apply when working around the aircraft; asphalt pavement design for the removed island area must comply with UFC 3-250-01 (Pavement Design for Roads, Streets, Walks, and Open Storage Areas); and the West Gate traffic island work area can be closed for a couple of days during construction rather than requiring ongoing traffic control measures. This RFI response provides preliminary guidance to interested contractors on scope, site constraints, and regulatory compliance requirements for the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI responses for Project:

W50S6T26QA026 - Remove Traffic Island and Construct Sloped Concrete Static Display

Current as of: 9 July 2026

QUESTION ANSWER

1. Requesting the existing dimensions of the F-15 display pedestal, including length, width, height, and the required limits of the new sloped concrete sides.

Pedestal dimensions are 25.5’x46.5’. Height varies. From Statement of work - .

3.1.3 Formwork: Install formwork to

create a 60 degree (from horizontal) angled, sloped sides against the existing pedestal.

2. Could a drawing with dimensions be provided? We have a pedestal block plan.

3. Please confirm any restrictions or protection requirements while working around the aircraft if applicable.

N/A

4. If available please provide the required asphalt pavement section for the removed island area.

From Statement of Work - UFC 3-250-01:

Pavement Design for Roads, Streets, Walks, and Open Storage Areas.

5. Please confirm whether the West Gate traffic island work area will be closed during construction or if traffic control will be required.

We can close the gate for a couple of days