Technical Factors - 26QA018.docx
DOCX document 16 KB Posted
- Attached to
- Repair Main Gas Valve Bldg 100
- Solicitation number
- W50S6T26QA018
- Issued by
-
Department of the Army National Guard
About this file
This is a Technical Factors evaluation document for solicitation W50S6T26QA018, which specifies the requirements contractors must meet to be considered for award of a repair/replacement contract for the main gas valve at Building 100. The 144 Fighter Wing is issuing this Request for Quote as a 100% small business set-aside under NAICS code 238220 (with a $19M size standard) with a Firm Fixed Price contracting approach and no post-award negotiations anticipated. All prospective quoters must possess a valid Commercial and Government Entity (CAGE) code and maintain current System for Award Management (SAM) registration. Quotes must be submitted electronically to jarrod.sanchez@us.af.mil and justin.scales.1@us.af.mil and are subject to strict deadline requirements; late submissions will not be considered.
To qualify for award consideration, contractors must submit three key components: (1) a written work procedure not exceeding two pages that demonstrates how they will satisfy the Statement of Work requirements in section 3.0; (2) acknowledgment of any subcontractors to be utilized, including business name and city location for both primary and alternative selections, identified at the time of quote submission; and (3) proof of qualifications and competence, satisfied by providing either a current California C-36 license (with license number) held by the prime contractor or subcontractor, or an equivalent credential or certificate demonstrating relevant competency in the area of work. A site visit is scheduled for June 2, 2026 at 0830 PDT at Castle Air Force Base near Fresno, California, and requires advance security clearance and base access form completion 5-10 business days prior, with extended timelines (45-90 business days) for foreign national background reviews.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Factors Project: Replace Main Gas Valve at Building 100
To be considered for award a contractor must have a fully developed plan to execute contract performance and satisfy the statement of work (SOW). The following concerns must be addressed to be considered for award.
1. Procedure. Provide a brief written work procedure to satisfy the SOW requirements of section 3.0. (Limited to two pages).
2. Acknowledgment of subcontractors. If a subcontractor is utilized, they must be selected at the time of quote submission. A primary and alternative may be referenced. Provide the business name and city of the selected subcontractor(s).
3. Qualifications. The SOW requires qualifications to prove competence in the area of work. A current CA C-36 license by the prime or the sub-contractor will satisfy this requirement. If a C-36 is held provide the license number. In lieu of a C-36 license an equivalent credential/certificate may suffice and must be provided to evaluate competency.