W50S6T20Q6025

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update SOW flooring material descriptions, clarify SOW licensing requirements, clarify the site visit date, and update the w age determination.

A. The site visit day w as Tuesday, 8 September at 9am.

B. The SOW has multiple material updates. Vinyl tile, carpet tile, and stair ceramic tile descriptions have been updated.

C. The licensing requirements have been clarified as a California “B” license or “C-15” California license w ill satisfy the license requirement.

D. The Wage Determination (WD) has been updated to modification 18, dated 9/4/2020.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 100

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S6T20Q6025

X 9B. DATED (SEE ITEM 11)

27-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Sep-2020

CODE

USPFO CA 144 MSC

5323 E. MCKINLEY AVE

FRESNO CA 93727-2197

W50S6T 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTIONS TO QUOTERS

1. Description of the Project:

Provide all labor, tools, parts transportation, tools, equipment, materials, supplies, services, permits, insurance, and supervision necessary to "Replace Flooring in Building 122, 194, & 225" as per Statement of Work and Drawings, dated 15 June 2020. Project Number: HAYW182649 at the 144FW, Air National Guard, Fresno, CA.

2. Instructions to Quoters:

2.1. You are invited to submit a quote in response to our Request for Quotation (RFQ) W50S6T-20-Q-6025, Replace Flooring in Building 122, 194, & 225, Project Number # HAYW192300, As a result of this solicitation, the Government intends to award a single Firm Fixed Price (FFP) contract to the responsible quoter whose quotation will be most advantageous to the Government, considering only price.

2.2. This solicitation is set-aside 100% for small businesses.

2.3 Notice of Site Visit:

2.3.1 A site visit will be conducted on Tuesday, 8 September 2020 at 9:00am. Contractors will meet at the West gate near 5323 E. McKinley Ave, Fresno CA 93727. There are two gates off McKinley Ave. The West gate is located next to aircraft displays off McKinley Ave closer to the cross street, Peach Ave. All perspective contractors will be escorted from the West gate parking lot to the site location. When the site visit is concluded contractors will be escorted off base by military personnel. COVID-19 guidelines will be followed when on base. Masks shall be worn when entering the base, addressing the security gate and entering buildings. Social distance guidelines will be followed.

2.3.2 All attendees must e-mail their intention to participate in the site visit. Send an e-mail to Sergeant Jarrod Sanchez (jarrod.sanchez@us.af.mil) and inform who will be attending the site visit. This information should be provided in advance, three (3) business days prior to the site visit meeting.

2.3.3 Vehicles may be allowed on base. Vehicle allowance will be determined on the day of the site visit. Any vehicles allowed on base for site visit attendance will be subject to search. Vehicles may not have weapons or drug paraphernalia (to include marijuana) present as restricted by federal installations. Vehicle Registration, Driver License, and Proof of Insurance for vehicles must be current.

2.3.4 Information provided at this site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

3. Formal Communication, Quoter Explanations:

3.1 Submit all questions by email to the contracting office at the address shown below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.

Subject Line: Reference No. W50S6T-20-Q-6025

Email: jarrod.sanchez@us.af.mil

INQUIRIES SHALL BE SUBMITTED VIA EMAIL AND INCLUDE THE FOLLOWING INFORMATION.

Date of Quote Inquiry: _______________ From: ______________________________ Company Name: ________________________________ Phone Number: _____________________________ Fax Number: ______________________________ Email address: ________________________________________________________________________ Quote Inquiry: Be specific as to part of solicitation you are questioning.

3.2. Any explanation desired by a quoter regarding the meaning or interpretation of the solicitation, or quotes, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach quoter before the submission of their quote.

3.3. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on Contract Opportunities at https://beta.sam.gov/.

3.4. Receipt by the quoter must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of quotes. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective quoter via the web site.

3.5. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Contract Opportunities (https://beta.sam.gov/) system. Contract Opportunities is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested quoters must register with Contract Opportunities before accessing the system.

3.6. Amendments, if/when issued will be posted to https://beta.sam.gov/ for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the quoters responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.

4. Wage Determination:

4.1. Davis Bacon Wage Rates are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are CA20200018 08/21/2020.

4.2. In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of this solicitation, it is the quoters’ responsibility to insure the most recent determination is used in preparing the quote. An Amendment will not be issued prior to closing to change Wage Determination dates and/or numbers. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all quoters’ that have not been eliminated from the competition. If applicable, these quoters’/contractors will be given a reasonable opportunity to provide revised quotes solely to amend quotes due to Wage Determination changes. If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404-5(c) (4) will apply.

4.3. Applicable wage rates can be found at https://beta.sam.gov/.

5. Quote Submission Requirements:

5.1. Electronic Submission: The quoter shall submit their quote to only the Contracting Office. Send the complete package to include the Bid Guarantee to the Contracting Office using the email addresses:

jarrod.a.sanchez.mil@mail.mil; steven.ontiveros@us.af.mil

5.2. Bid Guarantee/Bond: In accordance with FAR 52.228-1, Bid Guarantee, one (1) Bid Bond with Power of Attorney is required to be submitted as part of the quoter's submission of a quotation. The Bid Bond must be provided on a SF 24 and received by the Contracting Office by the due date provided in Block 13 of the SF 1442.

Rejection of a bid bond shall be in accordance with FAR 28.101-4, Noncompliance with Bid Guarantee Requirements. Submit the Bid Bond and Power of Attorney by electronic mail with your quote package to the provided representatives. Class Deviation 2020-O0016 allows for the option to request electronic bond securities in response to the COVID-19 pandemic.

5.2.1. In accordance with FAR 52.228-11 (dev) in response to the COVID-19 emergency, electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates for bid guarantees, performance bonds and payment bonds. Corporate seals are not required on bid guarantees, performance bonds, payment bonds, consents of surety and all other forms listed at FAR 28.106-1. Therefore, electronic receipt of bid guarantees and performance and payment bonds is authorized.

5.3. SF 1442: One (1) electronic copy of the SF 1442. Complete the "Offeror" portion of the SF 1442 in its entirety (front and back) and ensure that any/all amendments are acknowledged. In accordance with FAR 4.102, an official having the authority to contractually bind the quoter's firm must sign the SF 1442.

5.4. Section 00010: One (1) electronic copy of the completed Section 00010. Insert the proposed price associated with the project for each line item; all Contract Line Item Numbers (CLINS) must be addressed. For CLINS that will not incur additional cost (i.e., zero-cost items), enter "Not Separately Priced" or "NSP".

5.6. Representations and Certifications, and Section 00600: One (1) electronic copy of the completed Section 00600.

If the quoter's firm has completed their annual Representations and Certifications through the System for Award Management (SAM), then complete and return only those shown in section 00600.

6. Clauses:

Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

7. Disposition of Unsuccessful Quotes:

In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful quotes including the bid bond.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

STATEMENT OF WORK

STATEMENT OF

WORK

Replace Flooring in Bldg. 122,194, &

225 PROJECT NO: HAYW182649

09 September 2020

144TH FIGHTER

WING CALIFORNIA AIR NATIONAL GUARD,

FRESNO

TECHNICAL PROVISIONS

TABLE OF CONTENTS:

DESCRIPTION OF SERVICES

SITE OF WORK

STATEMENT OF WORK

CONTRACTOR LICENSE REQUIREMENTS

SUBMITTALS

CLOSEOUT DOCUMENTATION

DESCRIPTION OF SERVICES

This statement of work describes contractor requirements for the project titled “Replace Flooring in Bldg. 122,194, & 225”. All work will occur at the Fresno Air National Guard Station, Fresno, California. The contractor is responsible to furnish and install all labor and materials to complete the items listed in this Statement of Work. The contractor shall provide the government a complete and usable product that will be inspected/accepted by the government at the completion of the project. All information included in this document, along with the instructions and standards referenced in the document, should be considered as part of the Statement of Work.

SITE OF WORK

All work will occur at the Fresno Air National Guard Station 5323 McKinley Ave, Fresno, CA. 93727

STATEMENT OF WORK

1. Objectives: The purpose of this project is upgrade the flooring in Bld 122, 194, 225.

2. Directions:

2.1. Complete all work according to the manufacturer’s specifications.

2.2. Contractor shall be authorized by the manufacture of the products to install.

2.3. Install approximately 12,787sf of new 24” X 24” 16 ounce minimum face weight, level loop style, tricolor carpet tile as indicated in the drawings. Color samples to be submitted for approval.

2.4. Install approximately 13,177sf of new 12” X 24” ASTM F1700 Class III Type B, 0.120” Luxury vinyl tile (LVT) 20mil wear layer thickness with overall thickness of 3mm as indicated in the drawings. Color samples to be submitted for approval.

2.5. Install approximately 232sf of new ceramic tile on flight of stairs as indicated on the drawings, to include slip resistant strips. Slip stripes, Tile and grout samples to be submitted for approval.

2.6. Once the old flooring has been removed the contractor will ensure the surface is clean of any old adhesives, glue, free of cracks in the foundation, and any other debris for the new flooring to be installed. Cracks shall be repaired by the contractor.

2.7. Install approximately 4,500lf of new 6” vinyl cove base of all walls where new flooring was installed. Color samples to be submitted for approval.

2.8. Install approximately 600lf of transitions where the carpet tiles and vinyl tile meet. (or epoxy)

3. Demolition

3.1. Contractor must remove all materials completely off 144th FW property.

3.2. Remove all carpet and glue as indicated in the drawings.

3.3. Remove all VCT and adhesive as indicated in the drawings.

3.4. Remove all tile and adhesive as indicated in the drawings.

3.5. Remove all of the carpet base board in all rooms and hallways indicated in the drawings.

4. Finishing

4.1. All flooring, transitions, adhesives and wax will be installed to the manufacture’s specifications.

4.2. Any damage to the wall paper, walls, doors, glass or furniture will be repaired or replaced by the contractor.

4.3. After installation of the vinyl tile is complete the vinyl tile shall be waxed, buffed, and sealed to manufacture specs.

5. Furniture Moving

5.1. Contractor shall be responsible to move ALL furniture in and out of the areas that will receive the new flooring products.

5.2. The Government will be responsible to remove the computers and any personal items at the work stations.

CONTRACTOR LICENSE REQUIREMENTS

1. The contractor will possess a valid California “B” license or applicable California specialty contractor license and be able to provide proof of competence in the area of work. The contractor may selfperform sections of the project.

2. All listed subcontractors working for the contractor will possess the applicable California Contractors license. Refer to the Project Specific Requirements section for the required license from the Contractor.

PROJECT SPECIFIC REQUIREMENTS

1. The contractor will possess a valid California “B” license or applicable California specialty contractor license and be able to provide proof of competence in the area of interior remodels and masonry. The contractor may self perform sections of the project.

2. All subcontractors working for the contractor will possess the applicable California Contractors license. For example, the contractor must be able to provide a Flooring and Floor Covering subcontractor C15 license.

3. The project will be completed no later than 45 working days post Notice to Proceed (NTP). Cabinets and fixtures will remain in place during the project. The contractor and government will negotiate the final phasing (if applicable), and schedule during a review of the project at the preconstruction conference.

4. Materials. The following lists out materials requirements for this project. Contractor may request substitutes for an approved equal during the preconstruction conference.

All substitution requests shall be made in writing on the AF Form 3000. Requests for material substitutions made after the preconstruction conference may not be granted by the Government.

a. Carpet tile

b. Vinyl Planks

c. Tile

d. Grout

e. Adhesive

f. Cove Base

g. Transitions

h. Safety Data Sheets

i. Weight Tags

j. Wax – manufacture specs

GENERAL REQUIREMENTS

1 When required, the Contractor will attend a PreConstruction Conference. The Pre Construction Conference will generally be scheduled after award but prior to the NTP.

At a minimum, the contractor shall have their project manager and site superintendent attend the meeting. The Contractor will provide the following documents at the Pre Construction Conference

a. Project Schedule

b. Contract Schedule of Values

c. Safety Plan

d. Quality Control Plan

e. Material Submittals

f. Material Safety Data Sheets

g. Draft DD 1354 – Final draft to be submitted at conclusion of project 2 Government Furnished Property and Services. The government will provide water, sewer and electrical connections. Unsecure outdoor storage area at the base is available and must be requested through the project manager prior to utilizing. Secured storage is the responsibility of the contractor.

3 Quality Control. Contractor shall develop and maintain a quality program to ensure work is performed as described in this Statement of Work and in accordance with all local, state and federal rules.

4 Quality Assurance. The Government will maintain a Quality Assurance Program to ensure work is performed as described in this Statement of Work and in accordance with all local, state, and federal rules. The Project Manager will manage the Government’s QA program.

5 Hours of Operation. The hours of work shall be between 7:00 a.m. and 5:00 p.m.

Monday through Friday unless otherwise prescribed by this statement of work. Work shall not be performed on Weekends and Federal Holidays without prior coordination from the Project Manager.

6 Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks (see section 6a) to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

a. Base Access. Base security personnel require that all personnel entering the installation are cleared for access. The contractor will provide first name, last name, driver’s license number and applicable vehicle data for all personnel accessing the base. The contractor shall submit this information to the base Contracting Office NLT two working days prior to the date of required access.

Personnel must maintain a valid driver’s license, vehicle registration and proof of insurance at all time while on the base.

b. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated subcontractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCICIII) and Terrorist Screening Database (TSDB) (AFI 10245, AFI 31101 and AFMAN 31

113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

7 Antiterrorism Awareness Level I Training (AT Level I). This standard language is for contractor employees with an area of performance within a US Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 5 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor;

completing the Force Protection computerbased training (CBT) course on the Advanced Distributed Learning System (ADLS), or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.

8 The Contractor, and all listed subcontractors, must be licensed within the State of California. Refer to the Project Specific Requirements section for the required license from the Contractor.

9 Technical Competence and Ability. If requested by the Government, the Contractor shall provide proof of technical competence and experience in the area of expertise required by this Statement of Work. The contractor shall be prepared to submit documents providing proof of successful competence such as training certificate or accreditations from recognized industry leaders. Contractors shall also be prepared to provide proof of successful project experience through references of former clients in related project types.

10 Dimensions and Quantity. All dimensions and quantities provided in the Statement of Work are estimates only. They are provided as a courtesy for contractors to estimate the magnitude of work or materials necessary to complete a task. They are not intended to be final measurements. The Contractor is responsible for verifying all dimensions and quantities in the field prior to starting work.

11 Submittals. All submittals will be transmitted with an AF Form 3000. When submitting on a finish, texture or other material characteristic where a photograph is unacceptable, the Contractor will provide a sample of the material for review and approval along with the product cutsheet.

12 Warranty. The contractor shall guarantee all workmanship and materials covered under this statement of work for a period of no less than one (1) year from the date of project acceptance. This contractor’s warranty shall be included with any manufacturer’s warranties that accompany materials or systems installed as part of this statement of work.

SUBMITTALS

All submittals will be transmitted with an AF Form 3000. When submitting on a finish, texture or other material characteristic where a photograph is unacceptable, the Contractor will provide a sample of the material for review and approval along with the product cutsheet.

CLOSEOUT DOCUMENTATION

10% Retainage will be released upon receipt of the following items:

Contractor workmanship letter of warranty up to one year.

Certificates of no debts to suppliers and vendors.

Electronic pictures showing the area before and after repair.

Recycling or Landfill proof of disposition document (if available).

All applicable O&M manuals

CONTRACTOR MANPOWER REPORTING

The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force collection site. The Contractor is required to completely fill in all required data fields using the following web address: https://www.ecmra.mil/ or https://www.sam.gov.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data should be reported no later than October 31 of each calendar year.

Contractors may direct questions to the help desk at https://www.sam.gov.

Unit Identification Code (UIC) for the Requiring Activity: FFTQR0 Issuing Office DoDAAC: W50S6T

DEFINITIONS

Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

Defective Service: A service output that does not meet the standard of performance associated with the PWS.

Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

Physical Security: Actions that prevent the loss or damage of Government property.

Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

ACRONYMS

AEI Army Enterprise Infostructure AFI Air Force Instruction AFMAN Air Force Manual AR Army Regulation ASTM American Society for Testing and Materials AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CAC Common Access Card CM Contract Manager CMRA Contractor Manpower Reporting Application COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense

FAR Federal Acquisition Regulation FW Fighter Wing GFP/M/E/S Government Furnished Property/Material/Equipment/Services HAF Headquarters Air Force HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive IA Information Assurance IS Information System(s) KO Contracting Officer LF Linear Foot NGB National Guard Bureau NLT No later than NTP Notice to Proceed OCI Organizational Conflict of Interest OCONUS Outside the Continental United States PII Personally Identifiable Information PIPO Phase In/Phase Out POC Point of Contact QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SF Square Foot SOW Statement of Work SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence VCT Vinyl Composition Tile

WAGE DETERMINATION

"General Decision Number: CA20200018 09/04/2020

Superseded General Decision Number: CA20190018

State: California

Construction Types: Building, Heavy (Heavy and Dredging) and Highway

Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California.

BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/10/2020 2 01/24/2020 3 01/31/2020 4 02/07/2020 5 03/06/2020 6 03/13/2020 7 04/17/2020 8 06/05/2020 9 06/19/2020 10 06/26/2020 11 07/03/2020 12 07/10/2020 13 07/17/2020 14 07/24/2020 15 08/07/2020 16 08/14/2020 17 08/21/2020 18 09/04/2020

ASBE0016-004 01/01/2019

AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,

MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &

TOULMNE COUNTIES

AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO & SANTA

CLARA COUNTIES

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) Area 1......................$ 28.20 9.27 Area 2......................$ 36.53 9.27

ASBE0016-008 01/01/2020

AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN

FRANSICO, SAN MATEO, SANTA CLARA, & SANTA CRUZ

AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,

MERCED, SAN JOAQUIN, STANISLAU, & TUOLUMNE

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 71.16 23.39 Area 2......................$ 54.26 23.39

BOIL0549-001 10/01/2016

AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA

CLARA COUNTIES

AREA 2: REMAINING COUNTIES

Rates Fringes

BOILERMAKER

Area 1......................$ 43.28 37.91 Area 2......................$ 39.68 35.71

BRCA0003-001 08/01/2019

Rates Fringes

MARBLE FINISHER..................$ 35.41 16.45

BRCA0003-003 08/01/2019

Rates Fringes

MARBLE MASON.....................$ 49.42 27.86

BRCA0003-005 05/01/2019

Rates Fringes

BRICKLAYER

( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 41.88 22.19 ( 7) San Francisco, San Mateo.......................$ 42.34 25.83 ( 8) Alameda, Contra Costa, San Benito, Santa Clara.......................$ 44.16 21.71 ( 9) Calaveras, San Joaquin, Stanislaus, Toulumne....................$ 39.66 20.76

(16) Monterey, Santa Cruz...$ 39.51 23.49

BRCA0003-008 07/01/2019

Rates Fringes

TERRAZZO FINISHER................$ 37.58 17.33

TERRAZZO WORKER/SETTER...........$ 48.53 26.84

BRCA0003-011 04/01/2019

AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz

AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne

AREA 3: Fresno, Kings, Madera, Mariposa, Merced

Rates Fringes

TILE FINISHER

Area 1......................$ 29.94 16.38

Area 2......................$ 25.60 14.30 Area 3......................$ 26.58 15.65 Tile Layer Area 1......................$ 49.90 19.16 Area 2......................$ 42.67 16.81 Area 3......................$ 40.27 18.58

CARP0022-001 07/01/2020

San Francisco County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41

CARP0034-001 07/01/2020

Rates Fringes

Diver Assistant Tender, ROV Tender/Technician...........$ 51.90 34.02 Diver standby...............$ 58.09 34.02 Diver Tender................$ 57.09 34.02 Diver wet...................$ 101.42 34.02 Manifold Operator (mixed gas)........................$ 62.09 34.02 Manifold Operator (Standby).$ 57.09 34.02

DEPTH PAY (Surface Diving):

050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot 221 ft.-deeper $5.00 per foot

SATURATION DIVING:

The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.

DIVING IN ENCLOSURES:

Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP0034-003 07/01/2020

Rates Fringes

Piledriver.......................$ 52.90 34.02

CARP0035-007 07/01/2019

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties

Rates Fringes

Modular Furniture Installer Area 1 Installer I................$ 27.46 22.14 Installer II...............$ 22.18 20.42 Lead Installer.............$ 30.91 22.64 Master Installer...........$ 35.13 22.64 Area 2 Installer I................$ 24.81 22.14 Installer II...............$ 20.01 20.42 Lead Installer.............$ 27.78 22.64 Master Installer...........$ 31.41 22.64 Area 3 Installer I................$ 23.86 22.14 Installer II...............$ 19.24 20.42 Lead Installer.............$ 26.66 22.64 Master Installer...........$ 30.08 22.64

CARP0035-008 08/01/2019

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa

Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: San Joaquin

AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties

Rates Fringes

Drywall Installers/Lathers:

Area 1......................$ 50.50 30.64 Area 2......................$ 44.62 30.64 Area 3......................$ 41.02 29.15 Area 4......................$ 43.77 30.64 Drywall Stocker/Scrapper Area 1......................$ 25.25 17.86 Area 2......................$ 22.31 17.86 Area 3......................$ 20.51 16.88 Area 4......................$ 21.89 17.86

CARP0152-001 07/01/2019

Contra Costa County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 50.65 30.20 Journeyman Carpenter........$ 50.50 30.20 Millwright..................$ 50.60 31.79

CARP0152-002 07/01/2019

San Joaquin County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw

Filer.......................$ 44.77 30.20 Journeyman Carpenter........$ 44.62 30.20 Millwright..................$ 47.12 31.79

CARP0152-004 07/01/2019

Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 43.42 30.20 Journeyman Carpenter........$ 43.27 30.20 Millwright..................$ 45.77 31.79

CARP0217-001 07/01/2019

San Mateo County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 50.65 30.20 Journeyman Carpenter........$ 50.50 30.20 Millwright..................$ 50.60 31.79

CARP0405-001 07/01/2019

Santa Clara County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 50.65 30.20 Journeyman Carpenter........$ 50.50 30.20

Millwright..................$ 50.60 31.79

CARP0405-002 07/01/2019

San Benito County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 44.68 30.20 Journeyman Carpenter........$ 44.62 30.20 Millwright..................$ 47.12 31.79

CARP0505-001 07/01/2019

Santa Cruz County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 44.77 30.20 Journeyman Carpenter........$ 44.62 30.20 Millwright..................$ 47.12 31.79

CARP0605-001 07/01/2019

Monterey County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 44.77 30.20 Journeyman Carpenter........$ 44.62 30.20 Millwright..................$ 47.12 31.79

CARP0701-001 07/01/2019

Fresno and Madera Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 43.42 30.20 Journeyman Carpenter........$ 43.27 30.20 Millwright..................$ 45.77 31.79

CARP0713-001 07/01/2019

Alameda County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 50.65 30.20 Journeyman Carpenter........$ 50.50 30.20 Millwright..................$ 50.60 31.79

CARP1109-001 07/01/2020

Kings County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41

ELEC0006-004 12/01/2018

SAN FRANCISCO COUNTY

Rates Fringes

Sound & Communications Installer...................$ 40.52 3%+19.05 Technician..................$ 46.60 3%+19.05

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0006-007 06/01/2020

SAN FRANCISCO COUNTY

Rates Fringes

ELECTRICIAN......................$ 78.00 3%+35.96

* ELEC0100-002 09/01/2020

FRESNO, KINGS, AND MADERA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 40.00 24.85

ELEC0100-005 12/01/2019

FRESNO, KINGS, MADERA

Communications System Installer...................$ 35.25 20.86 Technician..................$ 40.54 21.02

SCOPE OF WORK

Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.

A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS

Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing

C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV

D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment

E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE

INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO

THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems, VSAT Data Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems

WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems).

Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two

(2) conditions apply:

1. The project involves new or major remodel building trades construction.

2. The conductors for the fire alarm system are installed in conduit.

ELEC0234-001 12/23/2019

MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES

Rates Fringes

ELECTRICIAN

Zone A......................$ 51.47 26.64 Zone B......................$ 56.62 26.80

Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line

Zone B: Any area outside of Zone A

ELEC0234-003 12/01/2018

MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES

Rates Fringes

Sound & Communications Installer...................$ 40.02 19.75 Technician..................$ 46.02 19.75

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0302-001 02/25/2019

CONTRA COSTA COUNTY

Rates Fringes

CABLE SPLICER....................$ 60.48 26.06

ELECTRICIAN......................$ 53.76 25.86

* ELEC0302-003 12/01/2019

CONTRA COSTA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 40.31 21.01 Technician..................$ 46.36 21.19

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

* ELEC0332-001 06/01/2020

SANTA CLARA COUNTY

CABLE SPLICER....................$ 82.25 40.66

ELECTRICIAN......................$ 71.52 40.34

FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, ""Bosun's chairs,"" or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.

Work on structures of 60 ft. or over (as described above):

to be paid twice the straight-time rate of pay.

ELEC0332-003 12/01/2019

SANTA CLARA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 42.93 21.08 Technician..................$ 49.37 21.28

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel…