W50S6T-20-Q-6025 Amend 2.pdf
PDF 441 KB Posted
- Attached to
- Flooring Replacement in Three Buildings
- Solicitation number
- W50S6T20Q6025
- Issued by
-
Department of the Army National Guard
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update SOW details, update draw ings associated w ith building floorplans and update the w age determination.
A. The SOW has square footage and description updates to correspond w ith building 122 and 225 draw ing updates.
B. The Wage Determination (WD) has been updated to modification 19, dated 9/11/2020.
C. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 95
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S6T20Q6025
X 9B. DATED (SEE ITEM 11)
27-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Sep-2020
CODE
USPFO CA 144 MSC
5323 E. MCKINLEY AVE
FRESNO CA 93727-2197
W50S6T 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S6T20Q6025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 18-Sep-2020 03:00 PM to 22-Sep-2020 03:00 PM.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
STATEMENT OF WORK
Replace Flooring in Bldg. 122,194, & 225
PROJECT NO: HAYW182649
15 September 2020
144TH FIGHTER WING CALIFORNIA AIR
NATIONAL GUARD, FRESNO
TECHNICAL PROVISIONS
TABLE OF CONTENTS:
DESCRIPTION OF SERVICES
SITE OF WORK
STATEMENT OF WORK
CONTRACTOR LICENSE REQUIREMENTS
SUBMITTALS
CLOSEOUT DOCUMENTATION
DESCRIPTION OF SERVICES
This statement of work describes contractor requirements for the project titled “Replace Flooring in Bldg. 122,194, & 225”. All work will occur at the Fresno Air National Guard Station, Fresno, California. The contractor is responsible to furnish and install all labor and materials to complete the items listed in this Statement of Work. The contractor shall provide the government a complete and usable product that will be inspected/accepted by the government at the completion of the project. All information included in this document, along with the instructions and standards referenced in the document, should be considered as part of the Statement of Work.
SITE OF WORK
All work will occur at the
Fresno Air National Guard Station 5323 McKinley Ave, Fresno, CA. 93727
1. Objectives: The purpose of this project is upgrade the flooring in Bldg. 122, 194, 225.
2. Directions:
2.1. Complete all work according to the manufacturer’s specifications.
2.2. Contractor shall be authorized by the manufacture of the products to install.
2.3. Install approximately 12,362sf of new 24” X 24” 16 ounce minimum face weight, level loop style, tri-color carpet tile as indicated in the drawings. Color samples to be submitted for approval.
2.4. Install approximately 13,419sf of new 12” X 24” ASTM F1700 Class III Type B, 0.120” Luxury vinyl tile
(LVT) 20mil wear layer thickness with overall thickness of 3mm as indicated in the drawings. Color samples to be submitted for approval.
2.5. Install approximately 232sf of new ceramic tile on flight of stairs as indicated on the drawings, to include slip resistant strips. Slip stripes, Tile and grout samples to be submitted for approval.
2.6. Once the old flooring has been removed the contractor will ensure the surface is clean of any old adhesives, glue, free of cracks in the foundation, and any other debris for the new flooring to be installed.
Cracks shall be repaired by the contractor.
2.7. Install approximately 4,500lf of new 6” vinyl cove base of all walls where new flooring was installed.
Color samples to be submitted for approval.
2.8. Install approximately 600lf of transitions where the carpet tiles and vinyl tile meet. (or epoxy)
2.9 In building 122, room 18 (classroom) all auditorium seating shall be deomoed and disposed of by the contractor. Any protruding fasteners/screws shall be cut/removed level to surrounding floor base to prepare floor for new flooring material.
3. Demolition
3.1. Contractor must remove all materials completely off 144th FW property.
3.2. Remove all carpet and glue as indicated in the drawings.
3.3. Remove all VCT and adhesive as indicated in the drawings.
3.4. Remove all tile and adhesive as indicated in the drawings.
3.5. Remove all of the carpet base board in all rooms and hallways indicated in the drawings.
4. Finishing
4.1. All flooring, transitions, adhesives and wax will be installed to the manufacture’s specifications.
4.2. Any damage to the wall paper, walls, doors, glass or furniture will be repaired or replaced by the contractor.
4.3. After installation of the vinyl tile is complete the vinyl tile shall be waxed, buffed, and sealed to manufacture specs.
5. Furniture Moving
5.1. Contractor shall be responsible to move ALL furniture in and out of the areas that will receive the new flooring products.
5.2. The Government will be responsible to remove the computers and any personal items at the work stations.
CONTRACTOR LICENSE REQUIREMENTS
1. The contractor will possess a valid California “B” license or applicable California specialty contractor license and be able to provide proof of competence in the area of work. The contractor may self-perform sections of the project.
2. All listed sub-contractors working for the contractor will possess the applicable California Contractors license.
Refer to the Project Specific Requirements section for the required license from the Contractor.
PROJECT SPECIFIC REQUIREMENTS
1. The contractor will possess a valid California “B” license or applicable California specialty contractor license and be able to provide proof of competence in the area of interior remodels and masonry. The contractor may self- perform sections of the project.
2. All subcontractors working for the contractor will possess the applicable California Contractors license. For example, the contractor must be able to provide a Flooring and Floor Covering subcontractor C-15 license.
3. The project will be completed no later than 45 working days post Notice to Proceed (NTP). Cabinets and fixtures will remain in place during the project. The contractor and government will negotiate the final phasing (if applicable), and schedule during a review of the project at the pre-construction conference.
4. Materials. The following lists out materials requirements for this project. Contractor may request substitutes for an approved equal during the pre-construction conference. All substitution requests shall be made in writing on the AF Form 3000. Requests for material substitutions made after the pre-construction conference may not be granted by the Government.
a. Carpet tile
b. Vinyl Planks
c. Tile
d. Grout
e. Adhesive
f. Cove Base
g. Transitions
h. Safety Data Sheets
i. Weight Tags
j. Wax – manufacture specs
GENERAL REQUIREMENTS
1 When required, the Contractor will attend a Pre-Construction Conference. The Pre- Construction Conference will generally be scheduled after award but prior to the NTP. At a minimum, the contractor shall have their project manager and site superintendent attend the meeting. The Contractor will provide the following documents at the Pre- Construction Conference
a. Project Schedule
b. Contract Schedule of Values
c. Safety Plan
d. Quality Control Plan
e. Material Submittals
f. Material Safety Data Sheets
g. Draft DD 1354 – Final draft to be submitted at conclusion of project
2 Government Furnished Property and Services. The government will provide water, sewer and electrical connections. Unsecure outdoor storage area at the base is available and must be requested through the project manager prior to utilizing. Secured storage is the responsibility of the contractor.
3 Quality Control. Contractor shall develop and maintain a quality program to ensure work is performed as described in this Statement of Work and in accordance with all local, state and federal rules.
4 Quality Assurance. The Government will maintain a Quality Assurance Program to ensure work is performed as described in this Statement of Work and in accordance with all local, state, and federal rules.
The Project Manager will manage the Government’s QA program.
5 Hours of Operation. The hours of work shall be between 7:00 a.m. and 5:00 p.m. Monday through Friday unless otherwise prescribed by this statement of work. Work shall not be performed on Weekends and Federal Holidays without prior coordination from the Project Manager.
6 Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks (see section 6a) to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
a. Base Access. Base security personnel require that all personnel entering the installation are cleared for access. The contractor will provide first name, last name, driver’s license number and applicable vehicle data for all personnel accessing the base. The contractor shall submit this information to the base Contracting Office NLT two working days prior to the date of required access. Personnel must maintain a valid driver’s license, vehicle registration and proof of insurance at all time while on the base.
b. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
7 Antiterrorism Awareness Level I Training (AT Level I). This standard language is for contractor employees with an area of performance within a US Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 5 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS), or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.
8 The Contractor, and all listed sub-contractors, must be licensed within the State of California. Refer to the Project Specific Requirements section for the required license from the Contractor.
9 Technical Competence and Ability. If requested by the Government, the Contractor shall provide proof of technical competence and experience in the area of expertise required by this Statement of Work. The contractor shall be prepared to submit documents providing proof of successful competence such as training certificate or accreditations from recognized industry leaders. Contractors shall also be prepared to provide proof of successful project experience through references of former clients in related project types.
10 Dimensions and Quantity. All dimensions and quantities provided in the Statement of Work are estimates only. They are provided as a courtesy for contractors to estimate the magnitude of work or materials necessary to complete a task. They are not intended to be final measurements. The Contractor is responsible for verifying all dimensions and quantities in the field prior to starting work.
11 Submittals. All submittals will be transmitted with an AF Form 3000. When submitting on a finish, texture or other material characteristic where a photograph is unacceptable, the Contractor will provide a sample of the material for review and approval along with the product cut-sheet.
12 Warranty. The contractor shall guarantee all workmanship and materials covered under this statement of work for a period of no less than one (1) year from the date of project acceptance. This contractor’s warranty shall be included with any manufacturer’s warranties that accompany materials or systems installed as part of this statement of work.
SUBMITTALS
All submittals will be transmitted with an AF Form 3000. When submitting on a finish, texture or other material characteristic where a photograph is unacceptable, the Contractor will provide a sample of the material for review and approval along with the product cut-sheet.
CLOSEOUT DOCUMENTATION
� 10% Retainage will be released upon receipt of the following items:
Contractor workmanship letter of warranty up to one year.
Certificates of no debts to suppliers and vendors.
Electronic pictures showing the area before and after repair.
Recycling or Landfill proof of disposition document (if available).
All applicable O&M manuals
CONTRACTOR MANPOWER REPORTING
The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Air Force collection site. The Contractor is required to completely fill in all required data fields using the following web address: https://www.ecmra.mil/ or https://www.sam.gov.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data should be reported no later than October 31 of each calendar year.
Contractors may direct questions to the help desk at https://www.sam.gov.
Unit Identification Code (UIC) for the Requiring Activity: FFTQR0 Issuing Office DoDAAC: W50S6T
DEFINITIONS
Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations.
This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Defective Service: A service output that does not meet the standard of performance associated with the PWS.
Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
Physical Security: Actions that prevent the loss or damage of Government property.
Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
ACRONYMS
AEI Army Enterprise Infostructure
AFI Air Force Instruction
AFMAN Air Force Manual
AR Army Regulation
ASTM American Society for Testing and Materials
AT/OPSEC Antiterrorism/Operational Security
BI Background Investigation
CAC Common Access Card
CM Contract Manager
CMRA Contractor Manpower Reporting Application
COR Contracting Officer Representative
DA Department of the Army
DD254 Department of Defense Contract Security Classification Specification
DFARS Defense Federal Acquisition Regulation Supplement
DoD Department of Defense
FAR Federal Acquisition Regulation
FW Fighter Wing
GFP/M/E/S Government Furnished Property/Material/Equipment/Services
HAF Headquarters Air Force
HQDA Headquarters, Department of the Army
HSPD Homeland Security Presidential Directive
IA Information Assurance
IS Information System(s)
KO Contracting Officer
LF Linear Foot
NGB National Guard Bureau
NLT No later than
NTP Notice to Proceed
OCI Organizational Conflict of Interest
OCONUS Outside the Continental United States
PII Personally Identifiable Information
PIPO Phase In/Phase Out
POC Point of Contact
QA Quality Assurance
QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SF Square Foot SOW Statement of Work SSN Social Security Number TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence VCT Vinyl Composition Tile
WAGE DETERMINATION
"General Decision Number: CA20200018 09/11/2020
Superseded General Decision Number: CA20190018
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/10/2020 2 01/24/2020 3 01/31/2020 4 02/07/2020 5 03/06/2020 6 03/13/2020 7 04/17/2020 8 06/05/2020 9 06/19/2020 10 06/26/2020 11 07/03/2020 12 07/10/2020 13 07/17/2020 14 07/24/2020 15 08/07/2020 16 08/14/2020 17 08/21/2020 18 09/04/2020 19 09/11/2020
ASBE0016-004 01/01/2019
AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,
MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &
TOULMNE COUNTIES
AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO & SANTA
CLARA COUNTIES
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) Area 1......................$ 28.20 9.27 Area 2......................$ 36.53 9.27
ASBE0016-008 01/01/2020
AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN
FRANSICO, SAN MATEO, SANTA CLARA, & SANTA CRUZ
AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, SAN JOAQUIN, STANISLAU, & TUOLUMNE
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 71.16 23.39 Area 2......................$ 54.26 23.39
BOIL0549-001 10/01/2016
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: REMAINING COUNTIES
BOILERMAKER
Area 1......................$ 43.28 37.91 Area 2......................$ 39.68 35.71
BRCA0003-001 08/01/2019
Rates Fringes
MARBLE FINISHER..................$ 35.41 16.45
BRCA0003-003 08/01/2019
Rates Fringes
MARBLE MASON.....................$ 49.42 27.86
BRCA0003-005 05/01/2019
Rates Fringes
BRICKLAYER
( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 41.88 22.19 ( 7) San Francisco, San Mateo.......................$ 42.34 25.83 ( 8) Alameda, Contra Costa, San Benito, Santa Clara.......................$ 44.16 21.71 ( 9) Calaveras, San Joaquin, Stanislaus, Toulumne....................$ 39.66 20.76
(16) Monterey, Santa Cruz...$ 39.51 23.49
BRCA0003-008 07/01/2019
Rates Fringes
TERRAZZO FINISHER................$ 37.58 17.33
TERRAZZO WORKER/SETTER...........$ 48.53 26.84
BRCA0003-011 04/01/2019
AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz
AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne
AREA 3: Fresno, Kings, Madera, Mariposa, Merced
TILE FINISHER
Area 1......................$ 29.94 16.38
Area 2......................$ 25.60 14.30 Area 3......................$ 26.58 15.65 Tile Layer Area 1......................$ 49.90 19.16 Area 2......................$ 42.67 16.81 Area 3......................$ 40.27 18.58
CARP0022-001 07/01/2020
San Francisco County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41
CARP0034-001 07/01/2020
Rates Fringes
Diver Assistant Tender, ROV Tender/Technician...........$ 51.90 34.02 Diver standby...............$ 58.09 34.02 Diver Tender................$ 57.09 34.02 Diver wet...................$ 101.42 34.02 Manifold Operator (mixed gas)........................$ 62.09 34.02 Manifold Operator (Standby).$ 57.09 34.02
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot 221 ft.-deeper $5.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP0034-003 07/01/2020
Rates Fringes
Piledriver.......................$ 52.90 34.02
CARP0035-007 07/01/2019
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties
Modular Furniture Installer Area 1 Installer I................$ 27.46 22.14 Installer II...............$ 22.18 20.42 Lead Installer.............$ 30.91 22.64 Master Installer...........$ 35.13 22.64 Area 2 Installer I................$ 24.81 22.14 Installer II...............$ 20.01 20.42 Lead Installer.............$ 27.78 22.64 Master Installer...........$ 31.41 22.64 Area 3 Installer I................$ 23.86 22.14 Installer II...............$ 19.24 20.42 Lead Installer.............$ 26.66 22.64 Master Installer...........$ 30.08 22.64
CARP0035-008 08/01/2019
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa
Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: San Joaquin
AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties
Drywall Installers/Lathers:
Area 1......................$ 50.50 30.64 Area 2......................$ 44.62 30.64 Area 3......................$ 41.02 29.15 Area 4......................$ 43.77 30.64 Drywall Stocker/Scrapper Area 1......................$ 25.25 17.86 Area 2......................$ 22.31 17.86 Area 3......................$ 20.51 16.88 Area 4......................$ 21.89 17.86
CARP0152-001 07/01/2019
Contra Costa County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 50.65 30.20 Journeyman Carpenter........$ 50.50 30.20 Millwright..................$ 50.60 31.79
CARP0152-002 07/01/2019
San Joaquin County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw
Filer.......................$ 44.77 30.20 Journeyman Carpenter........$ 44.62 30.20 Millwright..................$ 47.12 31.79
CARP0152-004 07/01/2019
Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 43.42 30.20 Journeyman Carpenter........$ 43.27 30.20 Millwright..................$ 45.77 31.79
CARP0217-001 07/01/2019
San Mateo County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 50.65 30.20 Journeyman Carpenter........$ 50.50 30.20 Millwright..................$ 50.60 31.79
CARP0405-001 07/01/2019
Santa Clara County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 50.65 30.20 Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
CARP0405-002 07/01/2019
San Benito County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 44.68 30.20 Journeyman Carpenter........$ 44.62 30.20 Millwright..................$ 47.12 31.79
CARP0505-001 07/01/2019
Santa Cruz County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 44.77 30.20 Journeyman Carpenter........$ 44.62 30.20 Millwright..................$ 47.12 31.79
CARP0605-001 07/01/2019
Monterey County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 44.77 30.20 Journeyman Carpenter........$ 44.62 30.20 Millwright..................$ 47.12 31.79
CARP0701-001 07/01/2019
Fresno and Madera Counties
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 43.42 30.20 Journeyman Carpenter........$ 43.27 30.20 Millwright..................$ 45.77 31.79
CARP0713-001 07/01/2019
Alameda County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 50.65 30.20 Journeyman Carpenter........$ 50.50 30.20 Millwright..................$ 50.60 31.79
CARP1109-001 07/01/2020
Kings County
Rates Fringes
Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41
ELEC0006-004 12/01/2018
SAN FRANCISCO COUNTY
Sound & Communications Installer...................$ 40.52 3%+19.05 Technician..................$ 46.60 3%+19.05
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0006-007 06/01/2020
SAN FRANCISCO COUNTY
Rates Fringes
ELECTRICIAN......................$ 78.00 3%+35.96
ELEC0100-002 09/01/2020
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
ELECTRICIAN......................$ 40.00 24.85
ELEC0100-005 12/01/2019
FRESNO, KINGS, MADERA
Communications System Installer...................$ 35.25 20.86 Technician..................$ 40.54 21.02
SCOPE OF WORK
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing
C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO
THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems, VSAT Data Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems
WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems).
Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two
(2) conditions apply:
1. The project involves new or major remodel building trades construction.
2. The conductors for the fire alarm system are installed in conduit.
ELEC0234-001 12/23/2019
MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes
ELECTRICIAN
Zone A......................$ 51.47 26.64 Zone B......................$ 56.62 26.80
Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line
Zone B: Any area outside of Zone A
ELEC0234-003 12/01/2018
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES
Rates Fringes
Sound & Communications Installer...................$ 40.02 19.75 Technician..................$ 46.02 19.75
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0302-001 02/25/2019
CONTRA COSTA COUNTY
Rates Fringes
CABLE SPLICER....................$ 60.48 26.06
ELECTRICIAN......................$ 53.76 25.86
ELEC0302-003 12/01/2019
CONTRA COSTA COUNTY
Rates Fringes
Sound & Communications Installer...................$ 40.31 21.01 Technician..................$ 46.36 21.19
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0332-001 06/01/2020
SANTA CLARA COUNTY
CABLE SPLICER....................$ 82.25 40.66
ELECTRICIAN......................$ 71.52 40.34
FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, ""Bosun's chairs,"" or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.
Work on structures of 60 ft. or over (as described above):
to be paid twice the straight-time rate of pay.
ELEC0332-003 12/01/2019
SANTA CLARA COUNTY
Rates Fringes
Sound & Communications Installer...................$ 42.93 21.08 Technician..................$ 49.37 21.28
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0595-001 06/01/2020
ALAMEDA COUNTY
CABLE SPLICER....................$ 69.00 3%+38.52
ELECTRICIAN......................$ 60.00 3%+38.52
ELEC0595-002 06/01/2020
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
CABLE SPLICER....................$ 48.00 7.75%+25.33
ELECTRICIAN
(1) Tunnel work.............$ 42.00 7.75%+25.33
(2) All other work.........$ 40.00 7.75%+25.33
ELEC0595-006 12/01/2019
ALAMEDA COUNTY
Rates Fringes
Sound & Communications Installer...................$ 42.93 3%+20.22 Technician..................$ 53.66 3%+20.22
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0595-008 12/01/2019
CALAVERAS AND SAN JOAQUIN COUNTIES
Communications System
Installer...................$ 35.25 3%+20.22 Technician..................$ 44.06 3%+20.22
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0617-001 06/01/2020
SAN MATEO COUNTY
Rates Fringes
ELECTRICIAN......................$ 66.00 39.77
ELEC0617-003 12/01/2019
SAN MATEO COUNTY
Rates Fringes
Sound & Communications Installer...................$ 42.93 21.09 Technician..................$ 49.37 21.28
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0684-001 06/01/2020
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 41.00 3%+24.58
CABLE SPLICER = 110% of Journeyman Electrician
ELEC0684-004 12/01/2019
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
Communications System Installer...................$ 35.25 20.86 Technician..................$ 40.54 21.02
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC1245-001 06/01/2020
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 59.14 20.78
(2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 47.24 19.59
(3) Groundman...............$ 36.12 19.19
(4) Powderman...............$ 51.87 18.79
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
ELEV0008-001 01/01/2020
Rates Fringes
ELEVATOR MECHANIC................$ 69.78 34.765+a+b
FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
b. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
ENGI0003-001 06/24/2019
""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.
SEE AREA DEFINITIONS BELOW
OPERATOR: Power Equipment
(AREA 1:)
GROUP 1.....................$ 49.02 30.74
GROUP 2.....................$ 47.49 30.74
GROUP 3.....................$ 46.01 30.74
GROUP 4.....................$ 44.63 30.74
GROUP 5.....................$ 43.36 30.74
GROUP 6.....................$ 42.04 30.74
GROUP 7.....................$ 40.90 30.74
GROUP 8.....................$ 39.76 30.74
GROUP 8-A...................$ 37.55 30.74
OPERATOR: Power Equipment (Cranes and Attachments -
AREA 1:)
GROUP 1
Cranes.....................$ 50.65 30.74 Oiler......................$ 36.63 30.39 Truck crane oiler..........$ 43.55 30.74
GROUP 2
Cranes.....................$ 48.14 30.74 Oiler......................$ 36.36 30.39 Truck crane oiler..........$ 43.33 30.74
GROUP 3
Cranes.....................$ 46.40 30.74 Hydraulic..................$ 38.32 30.39 Oiler......................$ 36.14 30.39 Truck Crane Oiler..........$ 43.06 30.74
GROUP 4
Cranes.....................$ 43.36 30.74 OPERATOR: Power Equipment (Piledriving - AREA 1:)
GROUP 1
Lifting devices............$ 45.89 30.39 Oiler......................$ 36.63 30.39 Truck crane oiler..........$ 39.20 30.39
GROUP 2
Lifting devices............$ 44.07 30.39 Oiler......................$ 36.36 30.39 Truck Crane Oiler..........$ 38.98 30.39
GROUP 3
Lifting devices............$ 42.39 30.39 Oiler......................$ 36.14 30.39 Truck Crane Oiler..........$ 38.71 30.39
GROUP 4
Lifting devices............$ 40.62 30.39
GROUP 5
Lifting devices............$ 39.32 30.39
GROUP 6
Lifting devices............$ 37.98 30.39 OPERATOR: Power Equipment (Steel Erection - AREA 1:)
GROUP 1
Cranes.....................$ 46.30 30.39
Oiler......................$ 36.63 30.39 Truck Crane Oiler..........$ 39.20 30.39
GROUP 2
Cranes.....................$ 43.79 30.39 Oiler......................$ 36.36 30.39 Truck Crane Oiler..........$ 38.98 30.39
GROUP 3
Cranes.....................$ 42.05 30.39 Hydraulic..................$ 38.32 30.39…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .