Attachment 4 - QA WasteWater Sampling.pdf

PDF 373 KB Posted

Attached to
Waste Water Sampling / Testing Federal contract opportunity
Solicitation number
W50S6S25Q0002
Issued by
Department of the Army Arizona Army National Guard

About this file

This document is a set of questions and answers related to a federal contract opportunity for Wastewater Sampling and Testing. The contract has a solicitation number of W50S6S25Q0002 and is issued by the Department of the Army Arizona Army National Guard.

The key details include:

  • The contractor will be responsible for collecting wastewater samples per the Performance Work Statement (PWS) on a quarterly basis in January, April, July, and October.
  • The contractor must provide all necessary sampling equipment per the PWS.
  • Test results and flow meter data must be submitted within 15 days after each sampling event.
  • The contract is 100% set-aside for small businesses under NAICS code 541380 with a $19M size standard.
  • Proposal submissions and questions are due by 5:00 PM AZ time on November 20, 2024, with responses to be posted by November 22, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Waste Water Sampling / Testing, newest first.
File Type Posted
RFQ W50S6S25Q0002 - Wastewater Sampling Testing.docx DOCX document
Attachment 1 - PWS Waste Water Sampling.docx DOCX document
Attachment 2 - SCA WD 2015-5473 rv. 23.pdf PDF
Attachment 3 - 162WG KTR Env Awareness Brochure.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S6S25Q0002

W50S6S25Q0001 Q&A

1. Q. Is the contractor getting sent wastewater samples to test at their own facility?

A. Contracted entity will be responsible to collect samples per PWS para 1.4.1.

2. Q. Will there be a picture of site?

A. Reference photos are provided below:

3. Q. Will there be a downhole photo of sampling location?

A. Refer to item 2 above.

4. Q. Does the sampling location have flow monitoring equipment, or will we need to set up a temp meter for the

24 hours we will be sampling?

A. Contracted entity will be responsible to provide necessary equipment per PWS paragraph 1.1.

5. Q. In the performance work statement, it says the sampling shall take place Quarterly in January, April, July, and October. Would they be willing to allow sampling to be completed in the second month of each quarter (February, May, August, and November)?

A. Sampling shall take place quarterly in January, April, July and October per PWS paragraph 1.4.1.

6. Q. It states that results must be submitted within 15 days of sampling. Standard result ETA’s is 14-21 days. To meet that deadline, we would have to put a rush order on all the parameters, but the lab isn’t always able to accommodate. Can the time to receive results be extended?

A. Test results and flow meter results must be received no later than 15 days after each sampling event per PWS paragraph 1.4.1.

7. Q. For the hard copy delivery, can this be mailed or does it need to be hand delivered.

A. Copies may be mailed, provided they meet PWS Technical Exhibit 2 - Deliverables schedule