24 August 2021

Responses to RFI's for Range Tower (W50S6Q21B0006):

1. How tall is the tower structure?

Per range personnel, tower height is 50’ to floor of cab.

2. Are 2x2 ceiling grids an authorized substitute?

Specification Section 09 51 00 (Acoustical Ceilings) para 2.2.1.3 actually specifies acoustical tile units with a nominal size of 24 inch by 24 inch.

3. What is the cleanup requirement for the sandblasting?

They will need to put down visqueen, plastic or something to catch the paint chips and sand and dispose of the chips and sand off of Fort Chaffee according to state and city guidelines for disposal.

4. Are lifts/cranes authorized for use at the range?

Yes. Coordination with Razorback Range through COR will be required for scheduling.

5. Can the chain link fence around the building at top of tower be replaced instead of repainted?

If the contractor would prefer replacement then they will need to provide submittals for the replacement for approval