RFI AND ANSWERS 25 Aug.pdf

PDF 236 KB Posted

Attached to
Razorback Range Tower Repair - CANCELLED Federal contract opportunity
Solicitation number
W50S6Q21B0006
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Razorback Range Tower Repair - CANCELLED, newest first.
File Type Posted
OF 1419 Abstract of Offers signed.pdf PDF
RFI ANSWERS 9 SEP 21.pdf PDF
W50S6Q21B0006 AMENDMENT 0003.pdf PDF
RFI AND ANSWERS.pdf PDF
site visit sign in.pdf PDF
TOWER PICTURES.pdf PDF
W50S6Q21B0006 AMENDMENT 0002.pdf PDF
W50S6Q21B0006 AMENDMENT 0001.pdf PDF
Range Tower Specifications.pdf PDF
Pre Bid Site Visit Directions Map.PNG PNG image
W50S6Q21B0006 RANGE TOWER REPAIR SOLICITATION.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25 August 2021

Responses to RFI's for Range Tower (W50S6Q21B0006):

1. How tall is the tower structure?

Per range personnel, tower height is 50’ to floor of cab.

2. Are 2x2 ceiling grids an authorized substitute?

Specification Section 09 51 00 (Acoustical Ceilings) para 2.2.1.3 actually specifies acoustical tile units with a nominal size of 24 inch by 24 inch.

3. What is the cleanup requirement for the sandblasting?

The area needs to be enclosed to control the spread of the sandblasting. The Safety Data Sheets (SDS) of ALL chemicals need to be sent to the 188th Environmental Manager for review and approval prior to the starting of the project. Also, all SDS need to be at the worksite and available for review. The contractor is required to supply all collection systems, spill kit materials and waste collection drums (preferably 55 gallon drums) for all generated waste. The contractor is responsible for proper collection, storage and removal of ALL contaminated waste produced at the site, in accordance with all state and federal regulations. Ensure that the Fort Chaffee Environmental Manager is aware of all related work procedures and waste production.

4. Are lifts/cranes authorized for use at the range?

Yes. Coordination with Razorback Range through COR will be required for scheduling.

5. Can the chain link fence around the building at top of tower be replaced instead of repainted?

If the contractor would prefer replacement then they will need to provide submittals for the replacement for approval