Amendment Posting.docx

DOCX document 17 KB Posted

Attached to
187th FW SCN Dannelly Field, Montgomery, AL
Solicitation number
W50S6N25QA014
Issued by

About this file

This document is an Amendment Posting for Solicitation W50S6N25QA014 issued by the 187th Fighter Wing of the Alabama Army National Guard. The amendment extends the solicitation due date from 27 Aug 2025 to 02 Sept 2025, with submissions due by 2:00 PM CST via digital submission to MSgt Douglas Seaton or Maj Jeremy Hendrick. The solicitation seeks a firm-fixed price contract for a contractor to Engineer, Furnish, Install and Test (EFI&T) a complete Secondary CrashNet (SCN) System at the Alabama Air National Guard Base.

The amendment includes three vendor questions and answers that provide technical details about the project requirements. Vendors learned that analog telephones are preferred, optical fiber will be required for inter-building communication, and Uninterruptible Power Supplies (UPSs) must be included for the main equipment rack and outlying buildings. The contract will involve installing a comprehensive communication system with specific infrastructure and power management specifications.

View the file

Other files

File Type Posted
Combo SCN.docx DOCX document
SOW_SCN.docx DOCX document
W50S6N25QA014 Provisions and Clauses.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

26 Aug 2025

MEMORANDUM FOR ALL PROSPECTIVE OFFERORS

FROM: 187th Fighter Wing 5187 Selma Hwy Montgomery, AL 36108

SUBJECT: Due Date Extension for Solicitation W50S6N25QA014; Secondary CrashNet System

1. This amendment is to extend the solicitation due date by 6 Days from 27 Aug 2025 to 02 Sept 2025.

2. This extension is due to a request for information from vendors. The questions and answers can be found listed below.

3. Questions and Answers

· Q. Does the solution need to use VoIP telephones, or are analog telephone preferred? A. Analog is preferred

· Q. Will optical fiber be provided for inter-building data links? A. Fiber will be required for inter-building communication between the system

· Q. Do UPSs need to be included in the proposal, for the main equipment rack and/or the outlying buildings? A. UPS's will be required for this project

4. Submissions must be returned no later than 02 Sept 2025 at 2:00 PM CST via digital submission:

· Primary: MSgt Douglas Seaton, douglas.seaton@us.af.mil, 334-394-7528

· Secondary: Maj Jermey Hendrick, jeremy.hendrick@us.af.mil, 334-394-7530

File details come from the government source that posted it. Updated .