RFIs.docx
DOCX document 13 KB Posted
- Attached to
- Lift Station and Oil Water Separator Repair
- Solicitation number
- W50S6N-20-B-0001
About this file
This document contains a request for information related to lift station and oil water separator repair work, as well as details of a related federal contract opportunity solicitation. The request for information pertains to specifications and components for lift station A-1 repairs, including questions about acceptable pump, control panel, flow meter, and air release valve alternatives. Clarification is also sought on expected maintenance and repairs for oil water separators D1, D2, and D4. The related solicitation issued by the 187th Fighter Wing Contracting Office seeks bids for repair of lift stations and oil water separators at Dannelly Field Air National Guard Base in Montgomery, Alabama, with an acquisition value between $500,000 and $1,000,000. The solicitation is set aside for small businesses and will be available electronically at beta.sam.gov on April 17, 2020.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Requests for Information.docx | DOCX document | |
| 187th ANG SS Report.pdf | ||
| W50S6N-20-B-0001 Lift Station.pdf | ||
| Lift Station Repair SOW (2019) (002).docx | DOCX document | |
| Final Report 11 May 18_Lift Station - OWS Repair dwgs only.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. For lift station A-1, the plans specify (2) Flygt pumps. Would Ebara pumps be accepted as an approved equal?
1. On sheet C2.4: Note 1 calls for flow meters to be installed on the inlet piping. Can additional information be provided on the quantity & types of the meters?
1. Per sheet C2.4 Note 1: How are the flow meters to be installed?
1. Sheet C2.4 Note 3 calls for a Sta-con control panel. Would a Primex control panel be accepted as an approved equal?
1. Sheet C2.2 at end of proposed force main, a note calls for an “air release valve and concrete vault per detail below” but detail is not shown. Could this detail be provided?
1. In the statement of work, 2.2.4 mentions maintenance and repair of oil water separators D1, D2, & D4. The Report speaks to a lot of maintenance issues. Can you define the maintenance and repairs expected for D1,D2 and D4?