SOW Pipe Re-aligment.pdf
PDF 93 KB Posted
- Attached to
- 117 Sewer Pipe Realignment
- Solicitation number
- W50S6M26QA014
About this file
This Statement of Work (SOW) describes spray-in-place pipe lining rehabilitation services for six facilities at the 117th Air National Guard (ANG), Sumpter Smith Joint National Guard Base in Alabama. The contract, identified as BRKR262005, requires the contractor to provide all labor, materials, equipment, and supervision for approximately 1,000 linear feet of sewer pipe rehabilitation across Facilities 151, 141, 142, 175, 149, and 030. The contractor must conduct complete site assessments including full pipe inspection and camera scoping to evaluate pipe condition, identify defects, and document findings with video, photos, and written reports. Pipe cleaning and preparation shall include mechanical cleaning using descaling tools, high-pressure jetting, or brushing, followed by thorough drying and re-scoping to confirm readiness for lining installation.
The contractor shall furnish and install an approved cast-in-place epoxy or polymer lining system suitable for the specific pipe types (potable water, wastewater, or mechanical), applying the material uniformly to manufacturer-specified thickness with proper curing and environmental controls. Post-lining work includes final camera inspection, pressure or flow testing per code and manufacturer specifications, and submission of digital inspection reports and certification of system integrity to the Contracting Officer. All materials must be documented on AF Form 3000 and approved prior to installation. The contractor must follow U.S. Air Force Quality Assurance and Quality Control procedures and comply with applicable regulations including Unified Facilities Criteria, ANG standards, and security requirements. The total performance period is 120 days, with base hours of operation Tuesday through Friday, 0700–1730 Central Time, though work outside normal hours may be approved to prevent disruption of base activities. All contractor employees requiring base access must complete Antiterrorism Level I training within 45 calendar days of contract start date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
BRKR262005 – SEWER PIPE RE-LIGNER
117th ARW, Sumpter Smith Joint National Guard Base, Alabama
26 August 2026
Part 1 – GENERAL
1.1 Project Identification
1.1.1 The General Provisions of the Contract, including General and Supplementary
Conditions and General Requirements (if any), apply to all work specified in this document.
1.2 Scope of Work
1.2.1 General Description
The contractor will provide all labor, materials, equipment, and supervision necessary to complete the spray‑in‑place pipe lining rehabilitation process for the following facilities:
• Facility 151
• Facility 141
• Facility 142
• Facility 175
• Facility 149
• Facility 030
*** IMPORTANT: Bidder/Contractor to verify actual pipe length and diameter during site visit during the solicitation period. Dimensions given in this statement of work are estimates. It is the bidder’s responsibility to verify actual pipe dimensions before submitting a bid. ***
Work includes full pipe inspection, cleaning, preparation, lining installation, testing, and documentation for roughly 1,000 LF of piping.
2.1 Site Assessment
The contractor shall:
• Conduct a full inspection of existing piping systems within each facility.
• Perform a complete camera scoping assessment to accurately evaluate pipe condition, identify corrosion, blockages, structural defects, and determine suitability for lining.
• Document all findings with video, photos, and written reports.
• Identify any code compliance issues requiring correction.
• Verify access points, pipe diameters, and system layout to ensure compatibility with the spray‑in‑place lining process.
2.2 Pipe Cleaning and Preparation
• Isolate and depressurize piping systems as required.
• Mechanically clean the interior of all designated pipes using descaling tools, high‑pressure jetting, or mechanical brushing.
• Remove corrosion, scale, debris, and obstructions to ensure proper adhesion of the lining material.
• Thoroughly dry the piping system to meet manufacturer requirements.
• Re‑scope cleaned pipes with a camera to confirm readiness for lining.
2.3 Spray‑In‑Place Pipe Lining Rehabilitation
• Furnish and install an approved cast‑in‑place epoxy or polymer lining system suitable for the specific pipe type (potable water, wastewater, or mechanical).
• Apply the lining material uniformly to the manufacturer‑specified thickness to restore pipe integrity and extend service life.
• Ensure proper curing times and environmental conditions during application.
• Verify that all lined sections meet required adhesion, thickness, and smoothness standards.
• Provide documentation of material batch numbers, application thickness, and cure verification.
2.4 Post‑Lining Inspection and Testing
• Conduct a final camera inspection of all lined pipes to verify full coverage, uniformity, and absence of defects.
• Perform pressure testing or flow testing as required by code and manufacturer specifications.
• Provide digital inspection reports, test results, and certification of system integrity.
• Submit all documentation to the Contracting Officer for review and acceptance.
1.6 Site Cleanup
• Thoroughly clean the work area of dust, dirt, and debris.
• Restore all affected areas to their original condition.
• Dispose of all materials in accordance with applicable regulations.
• Follow ANGETL, ANG Handbook, and Unified Facilities Criteria throughout the project.
• The Contracting Officer Representative will perform Contracting Officer Representative
(COR) duties.
1.7 Contract Responsibilities
• Notify the Contracting Officer immediately if work outside the scope is requested. No additional work shall begin without written authorization.
• Cost increases beyond the original budget estimate will not justify additional fees unless caused by an approved scope change.
• Contract directly with the Contracting Officer.
• Provide and pay for all labor, materials, equipment, tools, and machinery.
• Issue all required notices and comply with all applicable codes, ordinances, and regulations.
• Notify the Contracting Officer in writing of any observed variances between contract documents and legal requirements.
• Assume responsibility for work performed contrary to requirements if no notice is provided.
• Accept modifications to contract documents required due to legal requirements.
• Maintain strict discipline and good order among employees; do not employ unfit or unskilled personnel.
• Provide all required submittals (shop drawings, catalog cuts, brochures, test reports, schedules, estimates, correspondence) in a timely manner.
1.8 Submittals
• All materials must be approved prior to installation.
• No work may begin until it is reviewed with the Contracting Officer.
• Any deviations must be reported to the Contractor and Contracting Officer.
• The contractor is responsible for full compliance with this SOW.
• Milestones and deliverables must be submitted prior to mobilization.
Part 2 – PRODUCT SUBMITTAL
2.1 Construction Materials
• Contractor shall use AF Form 3000 to document all provided materials.
• Contractor shall review all materials to determine acceptability for government use.
Part 3 – EXECUTION
3.1 Regulatory Guidance
Applicable regulatory documents include:
• Unified Facilities Criteria (UFC)
• ANG Form 920 Report
• AF Form 7115 Real Property Report
• ANGH 32‑1084 (27 Jan 2015) Space Authorization
The Contracting Officer Representative will provide all known regulations, standards, and directives.
Part 4 – QUALITY ASSURANCE
• Contractor shall follow U.S. Air Force standard Quality Assurance (QA) and Quality
Control (QC) procedures.
• Contractor shall implement documented processes for testing, inspection, and verification of all deliverables.
Part 6 – MISCELLANEOUS
• Insurance requirements apply as specified in the contract.
• Payment will be made monthly in arrears through the Government’s Wide Area
Workflow (WAWF) system.
• Contractor must complete required forms for all hazardous materials brought into the installation and for all waste generated.
Base hours of operation are Tuesday through Friday, 0700 – 1730 Central. Work may be performed outside of these hours with approval of the Base Civil Engineer or Deputy Base
Civil Engineer. Work outside of the normal hours of operation may be permitted to prevent disruption of base activities during the project.
Part 7 – ANTI‑TERRORISM / OPERATIONS SECURITY
7.1 Access and Security Requirements
• Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within
Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative
(COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security
Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force
Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
7.2 Non‑CAC Contractor Access
Contractors requiring installation access without a CAC must comply with:
• For Contractors that do not require CAC but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime
Information Center Interstate Identification Index (NCIC-III) and Terrorist
Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
7.3 Antiterrorism Level I Training
• Antiterrorism Awareness Level I Training (AT Level I). This standard language is for contractor employees with an area of performance within a US Government controlled installation, facility or area. All contractor employees, including subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a
Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on Joint Knowledge Online (JKO) at https://jkodirect.jten.mil/Atlas2/ faces/page/login/Login.seam. For those without a
CAC, select "Non-CAC" user on the JKO site. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.
PERFORMANCE PERIOD
The total performance period for this contract is 120 days.
END OF DOCUMENT