BRKR162322-162323 RFI Responses No. 4.pdf

PDF 2 MB Posted

Attached to
Repair Fire Suppression System Buildings 135 and 138
Solicitation number
W50S6M-20-B-0001
Issued by

About this file

This document contains responses to contractor questions regarding a federal solicitation for repair of fire suppression systems at two aircraft maintenance buildings in Birmingham, Alabama. The solicitation seeks services to replace an existing Aqueous Film Forming Foam fire suppression system with a High Expansion Foam system, upgrade the water supply system, replace necessary valves and pumps, and ensure a fully functional replacement system in compliance with plans and specifications dated January 20, 2020. The solicitation is issued by the Department of the Army Alabama Army National Guard for repair of fire suppression systems at Buildings 135 and 138 to resolve life safety and code deficiencies. The question responses provide clarification on design requirements, structural evaluations, permitting needs, equipment locations and specifications to assist contractors in preparing bids for the work outlined in the solicitation documents.

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 15 July 2020

To: SMSgt. William Hall

Subject: ANSWERS TO RFI #004

Project: REPAIR FIRE SUPPRESSION, FUEL CELL BUILDING 135

REPAIR FIRE SUPPRESSION, HANGAR BUILDING 138

Job #: ANG# BRKR162322 / SSL# 17069

ANG# BRKR162323 & SSL# 17070

From: David Donovan

The following items pertain to both Project BRKR162322 and Project

BRKR162323:

1. Specification Section 09 9000 – Paints and Coatings – Items 1.01D indicates that surfaces to receive high performance coatings are indicated in Section 09 9600;

however, the Project Manual does not contain a Section 099600. Please clarify this discrepancy.

a. Answer: Refer to addendum No. 3. High performance coatings are not required by the project scope.

2. Fire pump pressure, please confirm that new 12” underground fire line from pump house to hangars will be rated to handle pressures over 175 psi

a. Answer: Yes. The line in question will be rated for pressures exceeding

175 psi. This line shall receive restrained joints. Refer to Addendum No.

3 for clarification of this requirement.

3. Does the existing overhead structure meet the requirements for the additional weight of the foam generators, the steel to hang generators, and all piping to each generator and sprinkler systems?

a. Answer: Yes. Existing structural systems have been evaluated and are capable of supporting the new generators, piping, etc…

REPAIR FIRE SUPPRESSION, FUEL CELL BUILDING 135 BRKR162322

REPAIR FIRE SUPPRESSION, HANGAR BUILDING 138 BRKR162323

RFI RESPONSES NO. 004 Page 2 of 4 Seay Seay & Litchfield, P.C. 15 July 2020

4. Will the sitework/underground contractor be required to be a Birmingham city waterworks approved/certified vendor?

a. Answer: Yes. A Birmingham Water Works permit will be required and the utility contractor shall be approved/certified by the Birmingham Water Works. All cost for review, approval, and permitting of the proposed water utility work shall be the responsibility of the Contractor.

5. Drawing FP101 – The scope of work includes removal of the existing AFFF fire suppression system. Does the scope of work include removing and disposing of the foam concentrate in the existing AFF fire suppression system or will the Owner remove and dispose of the foam concentrate? Please state the type foam concentrate in the existing system if the Contractor is responsible for removing and properly disposing of the foam concentrate.

a. Answer: Yes. The Contractor shall remove and dispose of the existing foam concentrate. See attached SDS sheet for existing foam concentrate required to be removed.

The following items only pertain to Project BRKR162322:

6. Drawing S0.1 – Cold-Formed Steel Trusses Item 2 indicates the design loads for the pre-engineered steel trusses; however, the listed design loads do not consider the load imposed by the new wet pipe fire suppression system being installed in the Pump House. Please provide the design loads for the pre-engineered steel trusses associated the new wet pipe fire suppression system.

a. Answer: Small diameter piping needed to service fire protection systems for Building 137 shall be overhead supported. Ceiling load information listed on sheet S0.1 is sufficient to accommodate overhead supported fire protection systems in building 137. See also response to question 8 below.

7. Drawing FP111 – The General Notes indicate that a new wet pipe fire suppression system shall be provided in the new Pump House and the supply for this new fire suppression system shall be provided from the Base water distribution system;

however, the civil drawings do not indicate the new supply piping for this new fire suppression system. Please amend the civil drawings to indicate the new water service work for the new wet pipe fire suppression system in the new Pump House.

a. Answer: Separate water supply line is not required. Contractor shall tie into fire water in Building 137 ahead of the new backflow preventer in the pumphouse and provide a new backflow preventer for the required fire suppression systems in the pumphouse.

RFI RESPONSES NO. 004 Page 3 of 4 Seay Seay & Litchfield, P.C. 15 July 2020

8. Drawing FP111 – Fire Protection Note 20 indicates certain large diameter piping shall be a minimum of 7’-0” above finish floor in Pump House. The Pump House roof structure will be constructed of pre-engineered cold-formed metal trusses; however, the design criteria for the pre-engineered cold-formed metal trusses indicated on Drawing S0.1 does not account for loads from the large diameter piping. Please confirm the intent is to support all large diameter from the concrete floor slab;

otherwise, please amend the design criteria for the pre-engineered cold-formed metal trusses.

a. Answer: Intent is to floor support large diameter piping that serves buildings 135/138. Small diameter piping needed to service fire protection of Building 137 shall be overhead supported. Refer also to question 6 above. Listed ceiling load on sheet S0.1 is sufficient to accommodate overhead supported fire protection piping for Building 137 fire protection requirements.

9. Drawing FP501 – The Floor Pipe Support Detail includes a table which provides components sizes to support piping up to 10” in diameter; however, Drawing FP401 indicates floor mounted 12” diameter piping. Please provide the components sizes for the floor pipe supports for 12” diameter piping.

a. Answer: Provide pipe stands in accordance with NFPA 13 Chapter 9.

10. RSFACU and RFRP – Drawing FP110 indicates the Releasing Service Fire Alarm Control Unit will be located in Ready Room M118 and Drawing E-101 indicates the Remote Foam Releasing Panel will also be located in Ready Room M118.

Specification Section 01 1000 – Summary seems to imply all work outside the hangar bay will be completed during Stage 2; however, the RSFACU and RFRP will need to be installed during the Stage 3 work. We trust that Ready Room M118 will need to be continuously occupied by the Owner; therefore, will it be acceptable to construct a temporary dust partition and subdivide Ready Room M118 to allow installation of the RSFACU and RFRP while the Owner continues to occupy the remainder of this room?

a. Answer: Installation of required panel box, conduits, and other infrastructure for the RSFACU and RFRP shall be installed in Stage 2 to limit disruption to the Government’s ongoing occupancy of the facility. It is understood that final wiring installation, termination, programming, and testing of the RSFACU and RFRP will be required to be installed during Stage 3 of the project. Temporary dust partition/sub-division of Ready Room M118 will not be required during Stage 3 since major construction work will have been completed in Stage 2.

RFI RESPONSES NO. 004 Page 4 of 4 Seay Seay & Litchfield, P.C. 15 July 2020

11. Drawing MP110 – Fire Protection Note 1 pertains to rerouting a 3” domestic pipe inside the Pump House that is shown exiting the building and includes a note, “Refer to Civil for continuation”; however, the civil drawings do not indicate a new domestic water piping connection for piping exiting Pump House. Please amend the civil drawings to indicate the continuation of the domestic water piping outside the Pump Hose.

a. Answer: Exact location of water line outside of Building 137 is not known. During construction, the Contractor shall field verify location of the water line outside of the building and provide new piping as required to connect between the existing underground line and the new/relocated backflow preventer.

12. Drawing FA-001 – Fire Alarm / Mass Notification Note 20 states, “Provide duct detectors in supply air systems” and the Fire Alarm / Mass Notification Legend includes a symbol for Fire Alarm Supply Duct Detectors; however, there aren’t any fire alarm supply duct detectors shown on Drawing FA-200. Please provide the locations for the fire alarm supply duct detectors.

a. Answer: Fire Alarm Supply Duct detectors exist. The design intent is to replace all duct detectors as required for required duct smoke detection to coordinate with, and properly integrate into, the new facility fire alarm system. Contractor to field verify existing conditions as required to meet Contract document requirements. The Government has also provided as-built documentation to interested vendors to assist; however, the Contractor is ultimately responsible for verifying existing conditions in order to prepare bids for the work outlined in the Contract Documents.

13. Drawing FA-200 – Fire Alarm / Mass Notification System Note 2 states, “Install

AHU shutdown relays on all HVAC units; however, the HVAC units are not shown on the drawing. Please provide the location of all existing HVAC units.

a. Answer: Contractor to field verify existing conditions as required to meet Contract document requirements inclusive of installation of shutdown relays. The Government has also provided as-built documentation to interested vendors to assist; however, the Contractor is ultimately responsible for verifying existing conditions in order to prepare bids for the work outlined in the Contract Documents.