This document provides specifications for repairing fire suppression systems in two aircraft maintenance hangars located in Birmingham, Alabama. The project involves replacing an existing Aqueous Film Forming Foam system with a High Expansion Foam system to resolve life safety and code deficiencies. It will also upgrade the water supply system, replace all necessary valves, pumps and control systems to ensure a fully functional HEF fire suppression system. The project specifications require disposal of AFFF products and equipment in accordance with applicable codes and laws. Work must be performed according to the plans and specifications dated January 20, 2020. The solicitation was issued by the Department of the Army Alabama Army National Guard to provide all necessary plant, labor, transportation, materials, tools, equipment and supervision for repairing the fire suppression systems.

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 15 July 2020

To: SMSgt. William Hall

Subject: ADDENDUM NO. 3

Project: REPAIR FIRE SUPPRESSION, FUEL CELL BUILDING 135

REPAIR FIRE SUPPRESSION, HANGAR BUILDING 138

Job #: ANG# BRKR162322 / SSL# 17069

ANG# BRKR162323 & SSL# 17070

From: David Donovan

The plans and Specifications for Repair Fire Suppression, Fuel Cell Building 135, dated 20 January 2020, revised 20 March 2020, are amended as follows: (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern).

Item No. 1: Refer to specification section 09 9000 “Paints & Coatings.” Delete the specification section and replace it with the attached specification section 09 9000 “Paints & Coatings” with a revised date of 15 July 2020.

The plans and Specifications for Repair Fire Suppression, Hangar Building 138, dated 20 January 2020, revised 20 March 2020, are amended as follows: (Where there are conflicts between the plans and specifications and the addendum, this addendum shall govern).

Item No. 1: Refer to specification section 09 9000 “Paints & Coatings.” Delete the specification section and replace it with the attached specification section 09 9000 “Paints & Coatings” with a revised date of 15 July 2020.

Item No. 2: Refer to drawing sheet C2.0 “Site Plan.” Add the following note:

- The new 12-inch ductile iron water line from the fire pump located in Building 137 to the tie-in to existing water line between Buildings 135 and 138 shall be with restrained joints equal to MEGALUG. Concrete thrust blocks will not be required on this line."

End of Addendum #3

Repair Fire Suppression, Fuel Cell Building 135 17069/BRKR162322 117th Air Refueling Wing - Birmingham, AL Type B-3 (100%) Submittal 20 January 2020

Revised 15 July 2020

PAINTS AND COATINGS 09 9000 - 1

SECTION 09 9000 - PAINTS AND COATINGS

PART 1 GENERAL

1.01 SECTION INCLUDES (MODIFIED BY ADDENDUM NO. 3)

A. Surface preparation.

B. Field application of paints and other coatings.

C. Surfaces to be finished are indicated in this section and on the Drawings.

D. Surfaces to receive high performance coating are indicated in Section 09 9600.

1.02 RELATED REQUIREMENTS

A. Section 01 6116 - Volatile Organic Compound (VOC) Content Restrictions.

B. Section 05 5000 - Metal Fabrications: Shop-primed items.

1.03 REFERENCE STANDARDS

A. 40 CFR 59, Subpart D - National Volatile Organic Compound Emission Standards for

1. Architectural Coatings; U.S. Environmental Protection Agency; current edition.

B. GreenSeal GS-11 - Architectural Paints; 1993.

C. MPI (APL) - Master Painters Institute Approved Products List; Master Painters and

1. Decorators Association; current edition, www.paintinfo.com.

D. MPI (APSM) - Master Painters Institute Architectural Painting Specification Manual;

1. Master Painters and Decorators Association; 2004.

E. USGBC LEED-NC - LEED Green Building Rating System for New Construction and

1. Major Renovations; U.S. Green Building Council; 2009.

1.04 SUBMITTALS

A. See Section 01 3001 - Submittals

B. Product Data: Provide complete list of all products to be used, with the following

C. information for each:

1. Manufacturer's name, product name and/or catalog number, and general product category (e.g. "alkyd enamel").

2. MPI product number (e.g. MPI #47).

3. Cross-reference to specified paint system(s) product is to be used in; include description of each system (copy of relevant MPI Manual page is acceptable).

PAINTS AND COATINGS 09 9000 - 2

4. Certification: By manufacturer that all paints and coatings comply with VOC limits specified.

D. Certification: By manufacturer that all paints and coatings do not contain any of the prohibited chemicals specified; GreenSeal GS-11 certification is not required but if provided shall constitute acceptable certification.

E. Samples: Submit three paper "drop" samples, 6X6 inches (_______ mm) in size, illustrating range of colors available for each finishing product specified.

1. Where sheen is specified, submit samples in only that sheen.

2. Where sheen is not specified, discuss sheen options with Architect before preparing samples, to eliminate sheens definitely not required.

3. Paint color submittals will not be considered until color submittals for major materials not to be painted, such as flooring, have been approved.

F. LEED Report: VOC content of all interior opaque coatings actually used.

1.05 QUALITY ASSURANCE

A. Applicator Qualifications: Company specializing in performing the work of this section with minimum 3 years documented experience and approved by manufacturer.

B. Maintain one copy of relevant portions of MPI Architectural Painting Specification Manual on project site at all times.

C. Material Safety Data Sheets: At project site maintain file of MSDS sheets for each product used; become familiar with and follow manufacturer's stated application and safety requirements.

1.06 MOCK-UP

A. See Section 01 4000 - Quality Requirements, for general requirements for mock-up.

B. Provide one complete room finish mock-up. Mockup shall include all surfaces required to be painted (i.e. all walls, doors, frames, and trim). Provide paint in colors called for in the approved color schedule. Finish mock-up to be used as a benchmark for project colors and quality of finish installation.

C. Locate where directed.

D. Mock-up may remain as part of the Work.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Deliver products to site in sealed and labeled containers; inspect to verify acceptability.

B. Container Label: Include manufacturer's name, type of paint, brand name, lot number, brand code, coverage, surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and reducing.

PAINTS AND COATINGS 09 9000 - 3

C. Paint Materials: Store at minimum ambient temperature of 45 degrees F (7 degrees C) and a maximum of 90 degrees F (32 degrees C), in ventilated area, and as required by manufacturer's instructions.

1.08 FIELD CONDITIONS

A. Do not apply materials when surface and ambient temperatures are outside the temperature ranges required by the paint product manufacturer.

B. Follow manufacturer's recommended procedures for producing best results, including testing of substrates, moisture in substrates, and humidity and temperature limitations.

C. Do not apply exterior coatings during rain or snow, or when relative humidity is outside the humidity ranges required by the paint product manufacturer.

D. Minimum Application Temperatures for Latex Paints: 45 degrees F (7 degrees C) for interiors; 50 degrees F (10 degrees C) for exterior; unless required otherwise by

E. Minimum Application Temperature for Varnish Finishes: 65 degrees F (18 degrees C) for interior or exterior, unless required otherwise by manufacturer's instructions.

F. Provide lighting level of 40 ft candles (____ lx) measured mid-height at substrate surface.

1.09 EXTRA MATERIALS

A. See Section 01 6000 - Product Requirements, for additional provisions.

B. Supply 1 gallon (4 L) of each color, type, and surface texture; store where directed.

C. Label each container with color, type, texture, and room locations in addition to the manufacturer's label.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Provide all paint and coating products used in any individual system from the same manufacturer; no exceptions.

B. Provide all paint and coating products from the same manufacturer to the greatest extent possible.

C. Paints: Acceptable manufacturers included, but are not limited to the following:

1. Benjamin Moore & Co: www.benjaminmoore.com.

2. PPG Architectural Finishes, Inc: www.ppgaf.com.

3. Glidden Professional: www.gliddenprofessional.com .

PAINTS AND COATINGS 09 9000 - 4

2.02 MATERIALS - GENERAL

A. Volatile Organic Compound (VOC) Content:

1. Provide coatings that comply with the most stringent requirements specified in the following:

a. 40 CFR 59, Subpart D--National Volatile Organic Compound Emission

Standards for Architectural Coatings.

b. USGBC LEED Rating System, edition as specified in Section 01 3515; for interior wall and ceiling finish (all coats), anti-corrosive paints on interior ferrous metal, clear wood stains and finishes, sanding sealers, other sealers, shellac, and floor coatings.

2. Determination of VOC Content: Testing and calculation in accordance with 40 CFR 59, Subpart D (EPA Method 24), exclusive of colorants added to a tint base and water added at project site; or other method acceptable to authorities having jurisdiction.

B. Chemical Content: The following compounds are prohibited:

1. Aromatic Compounds: In excess of 1.0 percent by weight of total aromatic compounds (hydrocarbon compounds containing one or more benzene rings).

2. Acrolein, acrylonitrile, antimony, benzene, butyl benzyl phthalate, cadmium, di (2-ethylhexyl) phthalate, di-n-butyl phthalate, di-n-octyl phthalate, 1,2-dichlorobenzene, diethyl phthalate., dimethyl phthalate, ethylbenzene, formaldehyde, hexavalent chromium, isophorone, lead, mercury, methyl ethyl ketone, methyl isobutyl ketone, methylene chloride, naphthalene, toluene (methylbenzene), 1,1,1-trichloroethane, vinyl chloride.

C. Paints and Coatings: Provide products listed in Master Painters Institute Approved Product List, current edition available at www.paintinfo.com, for specified MPI Categories, except as otherwise indicated.

1. Provide ready mixed paints and coatings.

2. Provide materials that are compatible with one another and the substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.

D. Accessory Materials: Linseed oil, shellac, turpentine, paint thinners and other materials not specifically indicated but required to achieve the finishes specified; commercial quality

E. Patching Material: Latex filler.

F. Fastener Head Cover Material: Latex filler.

2.03 PAINT SYSTEMS

A. Provide Premium Grade systems (2 top coats) as defined in MPI Architectural Painting Specification Manual, except as otherwise indicated.

B. Where a specified paint system does not have a Premium Grade, provide Custom Grade system.

PAINTS AND COATINGS 09 9000 - 5

C. Where sheen is not specified or more than one sheen is specified, sheen will be selected later by Architect from the manufacturer's full line.

D. Provide colors and sheens as directed by Architect.

1. Allow for minimum of three colors for each system, unless otherwise indicated, without additional cost to Owner.

2. Extend colors to surface edges; colors may change at any edge as directed by

Architect.

2.04 EXTERIOR PAINT SYSTEMS

A. Concrete Masonry Units:

1. EXT 4.2A Latex: Block Filler MPI #4, Latex MPI #119, semi-gloss.

B. Structural Steel and Metal Fabrications:

1. Applications include but are not limited to doors, frames, miscellaneous metal boxes, and covers.

2. EXT 5.1C W.B. Light Industrial Coating: Alkyd Metal Primer MPI #79, W.B. Light

Industrial Coating MPI #164, gloss.

a. Primer (MPI #79):

1) Equal to Devguard 4160 by Devoe Coatings

b. Intermediate Coat: Same as Topcoat

c. Top Coat (MPI #164):

1) Equal to Devflex 4216 by Devoe Coatings

2.05 INTERIOR PAINT SYSTEMS

A. Concrete Vertical Surfaces:

1. INT 3.1A Latex: Latex Primer Sealer MPI #3, Latex MPI #54, gloss level 5.

a. Primer (MPI #3):

1) Equal to Bond Prep Pigmented Bonding Primer Sealer (3030) by Glidden

Professional.

b. Intermediate Coat: Same as Topcoat.

c. Top Coat (MPI#54):

1) Equal to Ultra-Hide 150 Interior Latex Semi-Gloss (1416) by Glidden

B. Concrete Masonry Units:

1. INT 4.2A Latex: Latex Block Filler MPI #4, Latex MPI #54, gloss level 5.

a. Primer, MPI #4 - Block Filler, Latex, Interior/Exterior:

1) Glidden 3010 Block Filler

2) Benjamin Moore: Moorecraft Super Craft Latex Block Filler 285

3) Sherwin Williams: Prep-Rite Block Filler - B25W25

b. Intermediate Coat:Same as Top Coat.

c. Top Coat:

PAINTS AND COATINGS 09 9000 - 6

1) Glidden Ultra-Hide 250 Interior Semi-Gloss Paint 1406

2) Benjamin Moore Regel - W333 Preimium Interior 100% Acrylic Semi-

Gloss

3) Sherwin Williams - ProGreen 200 Low VOC Interior Latex Semi-Gloss

B31-600 Series

C. Structural Steel and Metal Fabrications:

1. INT 5.1X Latex: Q.D. Shop Primer MPI #275, Latex MPI #54, gloss level 5.

a. Primer: Shop Primer

c. Topcoat: MPI #54: Latex Interior Semi-Gloss (MPI Gloss Level 5)

1) Glidden Professional: Ultra- Hide 250 Inteior Semi-Gloss1406

2) Benjamin Moore: regal W333 Premium Interior 100% Acrylic Semi-

3) Sherwin Williams: ProGreen 200 Low VOC Interior Latex Semi-Gloss

B31-600 Series.

D. Plaster and Gypsum Board:

1. Applications include but are not limited to walls, ceilings, soffits, and bulkheads.

2. INT 9.2A Latex: Latex Primer Sealer MPI #50, Latex #52, gloss level 3.

a. Primer: MPI #50: Primer Sealer, Latex, Interior:

1) Sherwin Williams: ProGreen 200 Low VOC Interior Latex Primer

B28W600

2) Benjamin Moore: ProFinish Interior Latex Primer Sealer PF05

3) Kwal Paint: Accu-Pro Sandable Latex Drywall/Wood Primer 0890

c. Topcoat: MPI #52: Latex Interior Eggshell (MPI Gloss Level 3)

1) Glidden Professional: Diamond 350 Interior Eggshell Paint 1403

2) Sherwin Williams: ProGreen 200 Low VOC Interior Latex Semi-Gloss

B20-600 Series.

E. Dry Fall Latex Coating (MPI#226):

1. Applications include, but are not limited to, all ceilings, structure, and applicable ductwork, piping, and conduits in exposed ceiling areas.

2. Equal to Waterborne Eggshell Dry Fall by Glidden Professional.

PART 3 EXECUTION

3.01 SCOPE -- SURFACES TO BE FINISHED

A. Paint all exposed surfaces except where indicated not to be painted or to remain natural;

the term "exposed" includes areas visible through permanent and built-in fixtures when they are in place.

B. Paint the surfaces described in PART 2, indicated on the Drawings, and as follows:

PAINTS AND COATINGS 09 9000 - 7

1. If a surface, material, or item is not specifically mentioned, paint in the same manner as similar surfaces, materials, or items, regardless of whether colors are indicated or not.

2. Paint surfaces behind movable equipment and furnishings the same as similar exposed surfaces.

3. Paint surfaces to be concealed behind permanently installed fixtures, equipment, and furnishings, using primer only, prior to installation of the permanent item.

4. Paint back sides of access panels and removable and hinged covers to match exposed surfaces.

5. Finish top, bottom, and side edges of exterior doors the same as exposed faces.

6. Paint all insulated and exposed pipes, conduit, boxes, insulated and exposed ducts, hangers, brackets, collars and supports, mechanical equipment, and electrical equipment occurring in finished areas , unless otherwise indicated.

7. Paint both sides and edges of plywood backboards for electrical and telephone equipment before installing equipment.

C. Do Not Paint or Finish the Following Items:

1. Items fully factory-finished unless specifically noted; factory-primed items are not considered factory-finished.

2. Items indicated to receive other finish.

3. Items indicated to remain naturally finished.

4. Fire rating labels, equipment serial number and capacity labels, and operating parts of equipment.

5. Brick, precast concrete, integrally colored plaster.

6. Polished and brushed stainless steel, anodized aluminum, bronze, terne, and lead.

7. Acoustical materials.

8. Concealed piping, ductwork, and conduit.

3.02 EXAMINATION

A. Verify that surfaces are ready to receive Work as instructed by the product manufacturer.

B. Examine surfaces scheduled to be finished prior to commencement of work. Report any condition that may potentially affect proper application.

C. Test shop-applied primer for compatibility with subsequent cover materials; report incompatible primer conditions and submit recommended changes for Architect's approval.

D. Measure moisture content of surfaces using an electronic moisture meter. Do not apply finishes unless moisture content of surfaces are below the following maximums:

1. Plaster and Gypsum Board: 12 percent.

2. Masonry, Concrete, and Concrete Unit Masonry: 12 percent.

3. Interior Wood: 15 percent, measured in accordance with ASTM D4442.

4. Exterior Wood: 15 percent, measured in accordance with ASTM D4442.

PAINTS AND COATINGS 09 9000 - 8

5. Concrete Floors: 8 percent.

E. Measure the ph factor of concrete, masonry, and mortar before starting any finishing process, using the method specified in MPI Architectural Painting Manual.

1. Report results in writing to Architect before starting work.

2. If results of test indicates need for remedial action, provide written description of remedial action. If a different primer or paint systems is required, state the total cost of the change. Do not proceed with remedial action or change without receiving written authorization from Architect.

3.03 PREPARATION

A. Prepare surfaces as specified in MPI Architectural Painting Specification Manual and as follows for the applicable surface and coating; if multiple preparation treatments are specified, use as many as necessary for best results; where the Manual references external standards for preparation (e.g. SSPC standards), prepare as specified in those standards; comply with coating manufacturer's specific preparation methods or treatments, if any.

B. Coordinate painting work with cleaning and preparation work so that dust and other contaminants do not fall on newly painted, wet surfaces.

C. Surface Appurtenances: Prior to preparing surfaces or finishing, remove electrical plates, hardware, light fixtures, light fixture trim, escutcheons, machined surfaces, fittings, and similar items already installed that are not to be painted.

1. If removal is impractical or impossible because of the size or weight of the item, provide surface-applied protection before preparation and finishing.

2. After completing painting in each space or area, reinstall items removed using workers skilled in the trades involved.

D. Surfaces: Correct defects and clean surfaces which affect work of this section. Remove or repair existing coatings that exhibit surface defects.

E. Marks: Seal with shellac those which may bleed through surface finishes.

F. Concrete, Cement Plaster and Unit Masonry Surfaces to be Painted: Remove dirt, loose mortar, scale, salt or alkali powder, and other foreign matter. Remove oil and grease with a solution of tri-sodium phosphate; rinse well and allow to dry. Remove stains caused by weathering of corroding metals with a solution of sodium metasilicate after thoroughly wetting with water. Allow to dry.

1. Prepare concrete, concrete masonry block, cement plaster, and mineral-fiber-reinforced cement panel surfaces to be painted. Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents. Roughen as required to remove glaze. If hardeners or sealers have been used to improve curing, use mechanical methods of surface preparation.

2. Use abrasive blast-cleaning methods if recommended by paint manufacturer.

3. Determine alkalinity and moisture content of surfaces by performing appropriate tests as specified in MPI Manual. If surfaces are sufficiently alkaline to cause the

PAINTS AND COATINGS 09 9000 - 9

finish paint to blister and burn, correct this condition before application. Do not paint surfaces where moisture is present.

4. Etch concrete as specified in MPI Manual.

G. Gypsum Board Surfaces to be Painted: Fill minor defects with filler compound. Spot prime defects after repair.

H. Plaster Surfaces to be Painted: Fill hairline cracks, small holes, and imperfections with latex patching plaster. Make smooth and flush with adjacent surfaces. Wash and neutralize high alkali surfaces.

I. Galvanized Surfaces to be Painted: Remove surface contamination and oils and wash with solvent. Apply coat of etching primer.

1. Clean galvanized surfaces with nonpetroleum-based solvents so surface is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical or chemical methods as recommended as best practice by primer manufacturer.

J. Uncoated Steel and Iron Surfaces to be Painted: Remove grease, mill scale, weld splatter, dirt, and rust. Where heavy coatings of scale are evident, remove by hand wire brushing or sandblasting; clean by washing with solvent. Apply a treatment of phosphoric acid solution, ensuring weld joints, bolts, and nuts are similarly cleaned.

Prime paint entire surface; spot prime after repairs.

K. Shop-Primed Steel Surfaces to be Finish Painted: Sand and scrape to remove loose primer and rust. Feather edges to make touch-up patches inconspicuous. Clean surfaces with solvent. Prime bare steel surfaces. Re-prime entire shop-primed item.

L. Interior Wood Items to Receive Opaque Finish: Wipe off dust and grit prior to priming.

Seal knots, pitch streaks, and sappy sections with sealer. Fill nail holes and cracks after primer has dried; sand between coats. Back prime concealed surfaces before installation.

M. Interior Wood Items to Receive Transparent Finish: Sand wood to obtain a uniform appearance before immediately starting work. Wipe off dust and grit prior to sealing, seal knots, pitch streaks, and sappy sections with sealer. Fill nail holes and cracks after sealer has dried; sand lightly between coats. Prime concealed surfaces with gloss varnish reduced 25 percent with thinner.

N. Wood Doors to be Field-Finished: Seal wood door top and bottom edge surfaces with clear sealer.

O. Metal Doors to be Painted: Prime metal door top and bottom edge surfaces.

3.04 APPLICATION

A. Apply products in accordance with manufacturer's instructions and as specified or recommended by MPI Manual, using the preparation, products, sheens, textures, and colors as indicated.

PAINTS AND COATINGS 09 9000 - 10

1. Provide completed work matching approved samples for color, texture, and coverage.

2. Remove, refinish, or repaint work not complying with requirements.

B. Do not apply finishes over dirt, rust, scale, grease, moisture, scuffed surfaces, or other conditions detrimental to formation of a durable coating film; do not apply finishes to surfaces that are not dry.

C. Use applicators and methods best suited for substrate and type of material being applied and according to manufacturer's instructions.

1. Brush Application: Use brushes best suited for the type of material applied; use brush of appropriate size for the surface or item being painted; produce results free of visible brush marks.

2. Roller Application: Use rollers of carpet, velvet back, or high-pile sheep's wool as recommended by manufacturer for material and texture required.

3. Spray Application: Use airless spray equipment with orifice size as recommended by manufacturer for material and texture required.

4. Where application method is listed in the MPI Manual for the paint system that application method is required; otherwise any application method recommended by manufacturer for material used and objects to be painted is acceptable

D. Minimum Coating Thickness: Apply paint materials no thinner than manufacturer's recommended spreading rate; provide total dry film thickness of entire system as recommended by manufacturer.

1. Number of coats and film thickness required are the same regardless of application method.

2. If undercoats, stains, or other conditions show through final coat of paint, apply additional coats until paint film is of uniform finish, color, and appearance.

3. Give special attention to ensure edges, corners, crevices, welds, and exposed fasteners receive dry film thickness equivalent to that of flat surfaces.

E. Apply finish to completely cover surfaces with uniform appearance without brush marks, runs, sags, laps, ropiness, holidays, spotting, cloudiness, or other surface imperfections.

1. Before applying finish coats, apply a prime coat of material recommended by manufacturer, unless the surface has been prime coated by others; where evidence suction spots or unsealed areas in first coat appear, recoat primed and sealed surfaces to ensure finish coat with no burn through or other defects due to insufficient sealing.

2. Apply first coat to surface that has been cleaned, pretreated, or otherwise prepared as soon as practical after preparation and before subsequent surface deterioration.

3. Do not apply succeeding coats until the previous coat has cured as recommended by

4. Do not recoat until paint has dried to where it feels firm, does not deform or feel sticky under moderate thumb pressure, and application of another coat will not cause the undercoat to lift or lose adhesion.

PAINTS AND COATINGS 09 9000 - 11

5. If manufacturer's instructions recommend sanding to produce a smooth, even surface, sand between coats.

6. Before applying next coat vacuum clean surfaces of loose particles. Use tack cloth to remove dust and particles just prior to applying next coat.

7. Pigmented (Opaque) Finishes: Provide smooth, opaque surface of uniform finish, color, appearance, and coverage.

8. Where adjacent sealant is to be painted, do not apply finish coats until sealant is applied.

3.05 CLEANING AND PROTECTION

A. A. Collect waste material which may constitute a fire hazard, place in closed metal containers, and remove daily from site.

B. At the end of each workday, remove empty cans, rags, rubbish, and other discarded paint materials from site.

C. Protect other work, whether being painted or not, against damage by painting. Correct damage by cleaning, repairing or replacing, and repainting as approved by Architect.

D. Provide "Wet Paint" signs to protect newly painted finishes. Remove temporary protective wrappings provided by others to protect their work after completing painting operations.

E. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces. Comply with procedures specified in MPI Manual.

END OF SECTION

Repair Fire Suppression, Hangar Building 138 17070/BRKR162323

PAINTS AND COATINGS 09 9000 - 1

SECTION 09 9000 - PAINTS AND COATINGS

PART 1 GENERAL

1.01 SECTION INCLUDES (MODIFIED BY ADDENDUM NO. 3)

A. Surface preparation.

B. Field application of paints and other coatings.

C. Surfaces to be finished are indicated in this section and on the Drawings.

D. Surfaces to receive high performance coating are indicated in Section 09 9600.

1.02 RELATED REQUIREMENTS

A. Section 01 6116 - Volatile Organic Compound (VOC) Content Restrictions.

B. Section 05 5000 - Metal Fabrications: Shop-primed items.

1.03 REFERENCE STANDARDS

A. 40 CFR 59, Subpart D - National Volatile Organic Compound Emission Standards for

1. Architectural Coatings; U.S. Environmental Protection Agency; current edition.

B. GreenSeal GS-11 - Architectural Paints; 1993.

C. MPI (APL) - Master Painters Institute Approved Products List; Master Painters and

1. Decorators Association; current edition, www.paintinfo.com.

D. MPI (APSM) - Master Painters Institute Architectural Painting Specification Manual;

1. Master Painters and Decorators Association; 2004.

E. USGBC LEED-NC - LEED Green Building Rating System for New Construction and

1. Major Renovations; U.S. Green Building Council; 2009.

1.04 SUBMITTALS

A. See Section 01 3001 - Submittals

B. Product Data: Provide complete list of all products to be used, with the following

C. information for each:

1. Manufacturer's name, product name and/or catalog number, and general product category (e.g. "alkyd enamel").

2. MPI product number (e.g. MPI #47).

3. Cross-reference to specified paint system(s) product is to be used in; include description of each system (copy of relevant MPI Manual page is acceptable).

PAINTS AND COATINGS 09 9000 - 2

4. Certification: By manufacturer that all paints and coatings comply with VOC limits specified.

D. Certification: By manufacturer that all paints and coatings do not contain any of the prohibited chemicals specified; GreenSeal GS-11 certification is not required but if provided shall constitute acceptable certification.

E. Samples: Submit three paper "drop" samples, 6X6 inches (_______ mm) in size, illustrating range of colors available for each finishing product specified.

1. Where sheen is specified, submit samples in only that sheen.

2. Where sheen is not specified, discuss sheen options with Architect before preparing samples, to eliminate sheens definitely not required.

3. Paint color submittals will not be considered until color submittals for major materials not to be painted, such as flooring, have been approved.

F. LEED Report: VOC content of all interior opaque coatings actually used.

1.05 QUALITY ASSURANCE

A. Applicator Qualifications: Company specializing in performing the work of this section with minimum 3 years documented experience and approved by manufacturer.

B. Maintain one copy of relevant portions of MPI Architectural Painting Specification Manual on project site at all times.

C. Material Safety Data Sheets: At project site maintain file of MSDS sheets for each product used; become familiar with and follow manufacturer's stated application and safety requirements.

1.06 MOCK-UP

A. See Section 01 4000 - Quality Requirements, for general requirements for mock-up.

B. Provide one complete room finish mock-up. Mockup shall include all surfaces required to be painted (i.e. all walls, doors, frames, and trim). Provide paint in colors called for in the approved color schedule. Finish mock-up to be used as a benchmark for project colors and quality of finish installation.

C. Locate where directed.

D. Mock-up may remain as part of the Work.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Deliver products to site in sealed and labeled containers; inspect to verify acceptability.

B. Container Label: Include manufacturer's name, type of paint, brand name, lot number, brand code, coverage, surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and reducing.

PAINTS AND COATINGS 09 9000 - 3

C. Paint Materials: Store at minimum ambient temperature of 45 degrees F (7 degrees C) and a maximum of 90 degrees F (32 degrees C), in ventilated area, and as required by

1.08 FIELD CONDITIONS

A. Do not apply materials when surface and ambient temperatures are outside the temperature ranges required by the paint product manufacturer.

B. Follow manufacturer's recommended procedures for producing best results, including testing of substrates, moisture in substrates, and humidity and temperature limitations.

C. Do not apply exterior coatings during rain or snow, or when relative humidity is outside the humidity ranges required by the paint product manufacturer.

D. Minimum Application Temperatures for Latex Paints: 45 degrees F (7 degrees C) for interiors; 50 degrees F (10 degrees C) for exterior; unless required otherwise by

E. Minimum Application Temperature for Varnish Finishes: 65 degrees F (18 degrees C) for interior or exterior, unless required otherwise by manufacturer's instructions.

F. Provide lighting level of 40 ft candles (____ lx) measured mid-height at substrate surface.

1.09 EXTRA MATERIALS

A. See Section 01 6000 - Product Requirements, for additional provisions.

B. Supply 1 gallon (4 L) of each color, type, and surface texture; store where directed.

C. Label each container with color, type, texture, and room locations in addition to the manufacturer's label.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Provide all paint and coating products used in any individual system from the same manufacturer; no exceptions.

B. Provide all paint and coating products from the same manufacturer to the greatest extent possible.

C. Paints: Acceptable manufacturers included, but are not limited to the following:

1. Benjamin Moore & Co: www.benjaminmoore.com.

2. PPG Architectural Finishes, Inc: www.ppgaf.com.

3. Glidden Professional: www.gliddenprofessional.com .

PAINTS AND COATINGS 09 9000 - 4

2.02 MATERIALS - GENERAL

A. Volatile Organic Compound (VOC) Content:

1. Provide coatings that comply with the most stringent requirements specified in the following:

a. 40 CFR 59, Subpart D--National Volatile Organic Compound Emission

Standards for Architectural Coatings.

b. USGBC LEED Rating System, edition as specified in Section 01 3515; for interior wall and ceiling finish (all coats), anti-corrosive paints on interior ferrous metal, clear wood stains and finishes, sanding sealers, other sealers, shellac, and floor coatings.

2. Determination of VOC Content: Testing and calculation in accordance with 40 CFR 59, Subpart D (EPA Method 24), exclusive of colorants added to a tint base and water added at project site; or other method acceptable to authorities having jurisdiction.

B. Chemical Content: The following compounds are prohibited:

1. Aromatic Compounds: In excess of 1.0 percent by weight of total aromatic compounds (hydrocarbon compounds containing one or more benzene rings).

2. Acrolein, acrylonitrile, antimony, benzene, butyl benzyl phthalate, cadmium, di (2-ethylhexyl) phthalate, di-n-butyl phthalate, di-n-octyl phthalate, 1,2-dichlorobenzene, diethyl phthalate., dimethyl phthalate, ethylbenzene, formaldehyde, hexavalent chromium, isophorone, lead, mercury, methyl ethyl ketone, methyl isobutyl ketone, methylene chloride, naphthalene, toluene (methylbenzene), 1,1,1-trichloroethane, vinyl chloride.

C. Paints and Coatings: Provide products listed in Master Painters Institute Approved Product List, current edition available at www.paintinfo.com, for specified MPI Categories, except as otherwise indicated.

1. Provide ready mixed paints and coatings.

2. Provide materials that are compatible with one another and the substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.

D. Accessory Materials: Linseed oil, shellac, turpentine, paint thinners and other materials not specifically indicated but required to achieve the finishes specified; commercial quality

E. Patching Material: Latex filler.

F. Fastener Head Cover Material: Latex filler.

2.03 PAINT SYSTEMS

A. Provide Premium Grade systems (2 top coats) as defined in MPI Architectural Painting Specification Manual, except as otherwise indicated.

B. Where a specified paint system does not have a Premium Grade, provide Custom Grade system.

PAINTS AND COATINGS 09 9000 - 5

C. Where sheen is not specified or more than one sheen is specified, sheen will be selected later by Architect from the manufacturer's full line.

D. Provide colors and sheens as directed by Architect.

1. Allow for minimum of three colors for each system, unless otherwise indicated, without additional cost to Owner.

2. Extend colors to surface edges; colors may change at any edge as directed by

Architect.

2.04 EXTERIOR PAINT SYSTEMS

A. Concrete Masonry Units:

1. EXT 4.2A Latex: Block Filler MPI #4, Latex MPI #119, semi-gloss.

B. Structural Steel and Metal Fabrications:

1. Applications include but are not limited to doors, frames, miscellaneous metal boxes, and covers.

2. EXT 5.1C W.B. Light Industrial Coating: Alkyd Metal Primer MPI #79, W.B. Light

Industrial Coating MPI #164, gloss.

a. Primer (MPI #79):

1) Equal to Devguard 4160 by Devoe Coatings

c. Top Coat (MPI #164):

1) Equal to Devflex 4216 by Devoe Coatings

2.05 INTERIOR PAINT SYSTEMS

A. Concrete Vertical Surfaces:

1. INT 3.1A Latex: Latex Primer Sealer MPI #3, Latex MPI #54, gloss level 5.

a. Primer (MPI #3):

1) Equal to Bond Prep Pigmented Bonding Primer Sealer (3030) by Glidden

b. Intermediate Coat: Same as Topcoat.

c. Top Coat (MPI#54):

1) Equal to Ultra-Hide 150 Interior Latex Semi-Gloss (1416) by Glidden

B. Concrete Masonry Units:

1. INT 4.2A Latex: Latex Block Filler MPI #4, Latex MPI #54, gloss level 5.

a. Primer, MPI #4 - Block Filler, Latex, Interior/Exterior:

1) Glidden 3010 Block Filler

2) Benjamin Moore: Moorecraft Super Craft Latex Block Filler 285

3) Sherwin Williams: Prep-Rite Block Filler - B25W25

b. Intermediate Coat:Same as Top Coat.

c. Top Coat:

PAINTS AND COATINGS 09 9000 - 6

1) Glidden Ultra-Hide 250 Interior Semi-Gloss Paint 1406

2) Benjamin Moore Regel - W333 Preimium Interior 100% Acrylic Semi-

3) Sherwin Williams - ProGreen 200 Low VOC Interior Latex Semi-Gloss

B31-600 Series

C. Structural Steel and Metal Fabrications:

1. INT 5.1X Latex: Q.D. Shop Primer MPI #275, Latex MPI #54, gloss level 5.

a. Primer: Shop Primer

c. Topcoat: MPI #54: Latex Interior Semi-Gloss (MPI Gloss Level 5)

1) Glidden Professional: Ultra- Hide 250 Inteior Semi-Gloss1406

2) Benjamin Moore: regal W333 Premium Interior 100% Acrylic Semi-

3) Sherwin Williams: ProGreen 200 Low VOC Interior Latex Semi-Gloss

B31-600 Series.

D. Plaster and Gypsum Board:

1. Applications include but are not limited to walls, ceilings, soffits, and bulkheads.

2. INT 9.2A Latex: Latex Primer Sealer MPI #50, Latex #52, gloss level 3.

a. Primer: MPI #50: Primer Sealer, Latex, Interior:

1) Sherwin Williams: ProGreen 200 Low VOC Interior Latex Primer

B28W600

2) Benjamin Moore: ProFinish Interior Latex Primer Sealer PF05

3) Kwal Paint: Accu-Pro Sandable Latex Drywall/Wood Primer 0890

c. Topcoat: MPI #52: Latex Interior Eggshell (MPI Gloss Level 3)

1) Glidden Professional: Diamond 350 Interior Eggshell Paint 1403

2) Sherwin Williams: ProGreen 200 Low VOC Interior Latex Semi-Gloss

B20-600 Series.

E. Dry Fall Latex Coating (MPI#226):

1. Applications include, but are not limited to, all ceilings, structure, and applicable ductwork, piping, and conduits in exposed ceiling areas.

2. Equal to Waterborne Eggshell Dry Fall by Glidden Professional.

PART 3 EXECUTION

3.01 SCOPE -- SURFACES TO BE FINISHED

A. Paint all exposed surfaces except where indicated not to be painted or to remain natural;

the term "exposed" includes areas visible through permanent and built-in fixtures when they are in place.

B. Paint the surfaces described in PART 2, indicated on the Drawings, and as follows:

PAINTS AND COATINGS 09 9000 - 7

1. If a surface, material, or item is not specifically mentioned, paint in the same manner as similar surfaces, materials, or items, regardless of whether colors are indicated or not.

2. Paint surfaces behind movable equipment and furnishings the same as similar exposed surfaces.

3. Paint surfaces to be concealed behind permanently installed fixtures, equipment, and furnishings, using primer only, prior to installation of the permanent item.

4. Paint back sides of access panels and removable and hinged covers to match exposed surfaces.

5. Finish top, bottom, and side edges of exterior doors the same as exposed faces.

6. Paint all insulated and exposed pipes, conduit, boxes, insulated and exposed ducts, hangers, brackets, collars and supports, mechanical equipment, and electrical equipment occurring in finished areas , unless otherwise indicated.

7. Paint both sides and edges of plywood backboards for electrical and telephone equipment before installing equipment.

C. Do Not Paint or Finish the Following Items:

1. Items fully factory-finished unless specifically noted; factory-primed items are not considered factory-finished.

2. Items indicated to receive other finish.

3. Items indicated to remain naturally finished.

4. Fire rating labels, equipment serial number and capacity labels, and operating parts of equipment.

5. Brick, precast concrete, integrally colored plaster.

6. Polished and brushed stainless steel, anodized aluminum, bronze, terne, and lead.

7. Acoustical materials.

8. Concealed piping, ductwork, and conduit.

3.02 EXAMINATION

A. Verify that surfaces are ready to receive Work as instructed by the product

B. Examine surfaces scheduled to be finished prior to commencement of work. Report any condition that may potentially affect proper application.

C. Test shop-applied primer for compatibility with subsequent cover materials; report incompatible primer conditions and submit recommended changes for Architect's approval.

D. Measure moisture content of surfaces using an electronic moisture meter. Do not apply finishes unless moisture content of surfaces are below the following maximums:

1. Plaster and Gypsum Board: 12 percent.

2. Masonry, Concrete, and Concrete Unit Masonry: 12 percent.

3. Interior Wood: 15 percent, measured in accordance with ASTM D4442.

4. Exterior Wood: 15 percent, measured in accordance with ASTM D4442.

PAINTS AND COATINGS 09 9000 - 8

5. Concrete Floors: 8 percent.

E. Measure the ph factor of concrete, masonry, and mortar before starting any finishing process, using the method specified in MPI Architectural Painting Manual.

1. Report results in writing to Architect before starting work.

2. If results of test indicates need for remedial action, provide written description of remedial action. If a different primer or paint systems is required, state the total cost of the change. Do not proceed with remedial action or change without receiving written authorization from Architect.

3.03 PREPARATION

A. Prepare surfaces as specified in MPI Architectural Painting Specification Manual and as follows for the applicable surface and coating; if multiple preparation treatments are specified, use as many as necessary for best results; where the Manual references external standards for preparation (e.g. SSPC standards), prepare as specified in those standards; comply with coating manufacturer's specific preparation methods or treatments, if any.

B. Coordinate painting work with cleaning and preparation work so that dust and other contaminants do not fall on newly painted, wet surfaces.

C. Surface Appurtenances: Prior to preparing surfaces or finishing, remove electrical plates, hardware, light fixtures, light fixture trim, escutcheons, machined surfaces, fittings, and similar items already installed that are not to be painted.

1. If removal is impractical or impossible because of the size or weight of the item, provide surface-applied protection before preparation and finishing.

2. After completing painting in each space or area, reinstall items removed using workers skilled in the trades involved.

D. Surfaces: Correct defects and clean surfaces which affect work of this section. Remove or repair existing coatings that exhibit surface defects.

E. Marks: Seal with shellac those which may bleed through surface finishes.

F. Concrete, Cement Plaster and Unit Masonry Surfaces to be Painted: Remove dirt, loose mortar, scale, salt or alkali powder, and other foreign matter. Remove oil and grease with a solution of tri-sodium phosphate; rinse well and allow to dry. Remove stains caused by weathering of corroding metals with a solution of sodium metasilicate after thoroughly wetting with water. Allow to dry.

1. Prepare concrete, concrete masonry block, cement plaster, and mineral-fiber-reinforced cement panel surfaces to be painted. Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents. Roughen as required to remove glaze. If hardeners or sealers have been used to improve curing, use mechanical methods of surface preparation.

2. Use abrasive blast-cleaning methods if recommended by paint manufacturer.

3. Determine alkalinity and moisture content of surfaces by performing appropriate tests as specified in MPI Manual. If surfaces are sufficiently alkaline to cause the

PAINTS AND COATINGS 09 9000 - 9

finish paint to blister and burn, correct this condition before application. Do not paint surfaces where moisture is present.

4. Etch concrete as specified in MPI Manual.

G. Gypsum Board Surfaces to be Painted: Fill minor defects with filler compound. Spot prime defects after repair.

H. Plaster Surfaces to be Painted: Fill hairline cracks, small holes, and imperfections with latex patching plaster. Make smooth and flush with adjacent surfaces. Wash and neutralize high alkali surfaces.

I. Galvanized Surfaces to be Painted: Remove surface contamination and oils and wash with solvent. Apply coat of etching primer.

1. Clean galvanized surfaces with nonpetroleum-based solvents so surface is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical or chemical methods as recommended as best practice by primer manufacturer.

J. Uncoated Steel and Iron Surfaces to be Painted: Remove grease, mill scale, weld splatter, dirt, and rust. Where heavy coatings of scale are evident, remove by hand wire brushing or sandblasting; clean by washing with solvent. Apply a treatment of phosphoric acid solution, ensuring weld joints, bolts, and nuts are similarly cleaned.

Prime paint entire surface; spot prime after repairs.

K. Shop-Primed Steel Surfaces to be Finish Painted: Sand and scrape to remove loose primer and rust. Feather edges to make touch-up patches inconspicuous. Clean surfaces with solvent. Prime bare steel surfaces. Re-prime entire shop-primed item.

L. Interior Wood Items to Receive Opaque Finish: Wipe off dust and grit prior to priming.

Seal knots, pitch streaks, and sappy sections with sealer. Fill nail holes and cracks after primer has dried; sand between coats. Back prime concealed surfaces before installation.

M. Interior Wood Items to Receive Transparent Finish: Sand wood to obtain a uniform appearance before immediately starting work. Wipe off dust and grit prior to sealing, seal knots, pitch streaks, and sappy sections with sealer. Fill nail holes and cracks after sealer has dried; sand lightly between coats. Prime concealed surfaces with gloss varnish reduced 25 percent with thinner.

N. Wood Doors to be Field-Finished: Seal wood door top and bottom edge surfaces with clear sealer.

O. Metal Doors to be Painted: Prime metal door top and bottom edge surfaces.

3.04 APPLICATION

A. Apply products in accordance with manufacturer's instructions and as specified or recommended by MPI Manual, using the preparation, products, sheens, textures, and colors as indicated.

PAINTS AND COATINGS 09 9000 - 10

1. Provide completed work matching approved samples for color, texture, and coverage.

2. Remove, refinish, or repaint work not complying with requirements.

B. Do not apply finishes over dirt, rust, scale, grease, moisture, scuffed surfaces, or other conditions detrimental to formation of a durable coating film; do not apply finishes to surfaces that are not dry.

C. Use applicators and methods best suited for substrate and type of material being applied and according to manufacturer's instructions.

1. Brush Application: Use brushes best suited for the type of material applied; use brush of appropriate size for the surface or item being painted; produce results free of visible brush marks.

2. Roller Application: Use rollers of carpet, velvet back, or high-pile sheep's wool as recommended by manufacturer for material and texture required.

3. Spray Application: Use airless spray equipment with orifice size as recommended by manufacturer for material and texture required.

4. Where application method is listed in the MPI Manual for the paint system that application method is required; otherwise any application method recommended by manufacturer for material used and objects to be painted is acceptable

D. Minimum Coating Thickness: Apply paint materials no thinner than manufacturer's recommended spreading rate; provide total dry film thickness of entire system as recommended by manufacturer.

1. Number of coats and film thickness required are the same regardless of application method.

2. If undercoats, stains, or other conditions show through final coat of paint, apply additional coats until paint film is of uniform finish, color, and appearance.

3. Give special attention to ensure edges, corners, crevices, welds, and exposed fasteners receive dry film thickness equivalent to that of flat surfaces.

E. Apply finish to completely cover surfaces with uniform appearance without brush marks, runs, sags, laps, ropiness, holidays, spotting, cloudiness, or other surface imperfections.

1. Before applying finish coats, apply a prime coat of material recommended by manufacturer, unless the surface has been prime coated by others; where evidence suction spots or unsealed areas in first coat appear, recoat primed and sealed surfaces to ensure finish coat with no burn through or other defects due to insufficient sealing.

2. Apply first coat to surface that has been cleaned, pretreated, or otherwise prepared as soon as practical after preparation and before subsequent surface deterioration.

3. Do not apply succeeding coats until the previous coat has cured as recommended by

4. Do not recoat until paint has dried to where it feels firm, does not deform or feel sticky under moderate thumb pressure, and application of another coat will not cause the undercoat to lift or lose adhesion.

PAINTS AND COATINGS 09 9000 - 11

5. If manufacturer's instructions recommend sanding to produce a smooth, even surface, sand between coats.

6. Before applying next coat vacuum clean surfaces of loose particles. Use tack cloth to remove dust and particles just prior to applying next coat.

7. Pigmented (Opaque) Finishes: Provide smooth, opaque surface of uniform finish, color, appearance, and coverage.

8. Where adjacent sealant is to be painted, do not apply finish coats until sealant is applied.

3.05 CLEANING AND PROTECTION

A. A. Collect waste material which may constitute a fire hazard, place in closed metal containers, and remove daily from site.

B. At the end of each workday, remove empty cans, rags, rubbish, and other discarded paint materials from site.

C. Protect other work, whether being painted or not, against damage by painting. Correct damage by cleaning, repairing or replacing, and repainting as approved by Architect.

D. Provide "Wet Paint" signs to protect newly painted finishes. Remove temporary protective wrappings provided by others to protect their work after completing painting operations.

E. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces. Comply with procedures specified in MPI Manual.

END OF SECTION