This document contains questions and answers related to solicitation number W50S6L23B0001 for an engine test facility project at building B15437 on Joint Base Elmendorf-Richardson in Alaska. The solicitation seeks a fixed-price contract to add and alter the engine test facility, including installing a fuel system, control cabinet, electrical panels and connections. The project magnitude is between $250,000 to $500,000, with a 120 day performance period for the base bid and 60 days for options. A 20% bid bond is required. The solicitation is a total small business set-aside with a size standard of $45 million average annual revenue. Offerors must perform at least 15% of the work cost with their own employees. An organized site visit will be held on May 18, 2023 at 10:00AM AKST. The solicitation and plans are available at beta.sam.gov. Offerors must register in SAM and have a CAGE code. The Department of the Army Alaska Army National Guard is the issuing agency.

View the file

Other files for this federal contract opportunity

Other files attached to Add/Alter Engine Test Facility, B15437, JBER, newest first.
File Type Posted
23B0001 Bid Open Sign In.pdf PDF
Bid Abstract_23B0001.pdf PDF
2. FEDS 714 Dyno Exhaust and Eng Exhaust.jpg JPG image
1. FEDS 700 Dyno Exhaust and Eng Exhaust.JPG JPG image
5. Hunter Airfield Drawings Roof Exhaust.pdf PDF
4. T700 Flow Temp Rating.PNG PNG image
3. Fort Hood Small Trailer.PNG PNG image
23B0001 P00002.pdf PDF
23B0001 P00003.pdf PDF
Amendment 1 - Questions and Answers.pdf PDF
Site Visit Sign-In (18May23).pdf PDF
SOW (10Mar23).pdf PDF
SOW Att 7 JBER Integrated HAZMAT Plan (25Oct2020).pdf PDF
SOW Att 8-JBER HAZMAT Plan (7May2020).pdf PDF
SOW Att 4-FEDS Equipment Specs.pdf PDF
SOW Att 5-Communications Duct -Wire Routing.pdf PDF
W50S6L23B0001.pdf PDF
A02. SOW Att 1-Site Plan, Covered Fuels Containment.pdf PDF
SOW Att 2-Internal Building Layout.pdf PDF
SOW Att 6-Communications Panel Layout.png PNG image
SOW Att 3-Duct Specs.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q01: With the introduc�on of fuels and running of engines inside the building, will any modifica�ons to the fire alarm system be required for this project?

A01: No changes to the building fire alarm system are required. JBER fire chief has reviewed the project plans and validated the exis�ng system capabili�es.

Q02: Will the government provided control cabinets require shutdown contacts from the fire alarm system?

A02: No requirement.

Q03: Can the government provide cut sheets on the equipment it will be providing?

A03: Equipment to be installed are listed in Atachment 4.

Q04: Is the exis�ng electrical service sized appropriately to accommodate the addi�onal loads to be added by this scope?

A04: To be determined by the contractor.

Q05: Atachment 4 has power requirements for an Instrumenta�on & Control Cabinet, and the fuel and oil skid with a Fuel Pump and an oil pump. Is there anything else that will require an electrical connec�on?

A05: No electrical connec�ons beyond those listed are required.

Q06: Will the government be making the final connec�ons to the equipment from the controller or will that be the responsibility of the contractor?

A06: Contractor will be responsible for providing connec�ons from the building systems to the equipment. The government will install inter-equipment connec�ons.

Q07: Will engineering be required?

A07: To be determined by the contractor.

Q08: Are there any requirements for leak detec�on on the fuel system?

A08: No requirement.

Q09: The provided drawing (atachment 2) calls for a New Service Disconnect. Please confirm that this is a disconnect for the equipment and not a New Service Disconnect.

A09: confirmed. This is intended to be a service disconnect for the equipment. Per the SOW, contractor shall provide/install electrical panels, switches, and connec�ons needed to power control cab, distribu�on box, electrical starter unit, and fuel system as shown on the atachments.

Q10: Op�on 003 call for the installa�on of approx. 1000’ of fiber to building 15437. Can the government confirm that there is a spare innerduct and adequate space in the exis�ng raceway from MH237A all the way to the communica�ons hub in Building 16430?

A10: For op�on Bid Item #2 the government confirms that there is space in the innerduct from building 16430 to MH E237A. The contractor will be responsible for installing innerduct from the manhole to bldg. 15437.

Q11: Please confirm if structural drawings will be required for the canopy and concrete foo�ng and stamped by an Alaska engineer?

A11: The government confirms that new structural drawings need to be stamped by a Professional Engineer.

Q12: Please confirm that no soil analysis is needed for the concrete pad and foo�ngs and that the new concrete pad and foo�ng will reside on compacted na�ve soil.

A12: To be determined by the contractor.

Q13: Please indicate any test requirements for concrete, compac�on, welds, cabling, or other special inspec�ons.

A13: All work shall be in accordance with UFC criteria, building codes, local direc�ves, and standard prac�ces.

Q14: Please confirm that the Instrumenta�on and Control Cab with dimensions of 8’x8’x20’ is not part of the equipment to be placed on the new concrete pad.

A14: The government confirms that the control cab will not be placed on the new concrete pad. The new concrete pad is intended to support the fuel skid.

Q15: Please confirm that the proposed loca�on of the concrete slab and foo�ngs will not impact the exis�ng building concrete foo�ng.

A15: The government confirms that the concrete foo�ngs and slab are not intended to �e into or impact the exis�ng building founda�on. The contractor is responsible for ensuring new founda�on and canopy systems do not degrade the exis�ng structure.

Q16: Please confirm if mil cer�fica�ons will be required for canopy and rebar.

A16: No requirement.

Q17: A painted plywood board with ground connec�on and 4” PVC pipe in the floor is next to a steel column on the North Wall. Please indicate if this is the loca�on for the new Comm Panel.

A17: Use of the exis�ng plywood board for the new comm panel is acceptable.

Q18: Please confirm that a new 4” PVC pipe will need to enter the building in proximity of the exis�ng, through the concrete founda�on and that the concrete slab will need cut and removed for this and new concrete placed back for slab will need rebar doweled and concrete painted to match?

A18: The government confirms that this is an acceptable loca�on and method for installing the new innerduct building entry. The government notes that op�on bid #1 requires the installa�on of two (2) 4” PVC ducts. If the contractor intends to use the exis�ng 4” PVC noted in ques�on 7, the contractor will be responsible for verifying the suitability of the exis�ng duct.

Q19: Please confirm if new electrical conduit will need to install behind interior metal paneling.

A19: No requirement.

Q20: One of the duct openings that was laid out with blue tape is in the path of the building brace rods. Please confirm if this opening can move up without interfering with steel girts above. If moving the opening up interferes with the steel girt can the steel girt loca�on be altered, and will this require any modifica�ons to the structure of the building? Also, will the exterior metal siding panels need replaced due to exposed fastener holes?

A20: The loca�ons of the vents and service disconnect are es�mates. Openings may be adjusted to allow for clearance from building structural systems. If contractor’s solu�on creates exposed fastener holes, the contractor will submit a correc�ve ac�on plan to be approved by the Govt.

Q21: Please confirm if a dig permit is required for any comm trenching and hyrdo-boring.

A21: Yes. An AF103 Base Civil Engineering Work Clearance Request will be required to be submited by the contractor. Please contact 773rd CES in building 6236 for informa�on on submi�ng this request.

Q22: Can addi�onal informa�on be provided on the duc�ng needed? Or are there other engine test cell drawings for reference?

A12: Not currently available.

Q23: Please confirm if any ligh�ng is required for the canopy? If so, will there be specific classified lights?

A23: No requirement.

Q24: Are there any specs on the distribu�on cabinet, electrical starter units, or power control cabinets called out in SOW?

A24: Not currently available.

Q25: Is there any special exhaust detec�on system required that requires integra�on or a stand-alone system?

A25: No requirement

Q26: Will exis�ng panels and conduits have to be replaced with classified installa�on methods?

A26: No requirement

Q27: What are the ra�ngs of the current service on the building?

A27: 120/208VAC 200A (No 480VAC service)

Q28: Atachment 2 shows a New Service Disconnect, will there be a separate service run to the building for the work desired?

A28: No. This is intended to be a service disconnect for the equipment. Per the SOW, contractor shall provide/install electrical panels, switches, and connec�ons needed to power control cab, distribu�on box, electrical starter unit, and fuel system as shown on the atachments.

Q29: Can a basis of design or any relevant informa�on from another engine test facility be provided? Also, use of silencers or other equipment in conjunc�on with the duct was men�oned in the site visit. May we ask for any informa�on on that as well?

A29: The solicita�on has been amended (amendment 3) to add pictures and drawings for similar roof vented systems. They will need to be adapted for wall vents, but this should provide a beter picture of what we are looking for. No silencers will be required in conjunc�on with the duct system.