This document contains questions and answers from a site visit related to a federal contract solicitation for lactation room repairs at multiple buildings on an Air National Guard base in Alaska. The solicitation seeks fixed-price bids to repair six lactation rooms and surrounding areas at different locations on the base according to statements of work and site plans. Bids are due for base bid items to repair rooms at four buildings, with optional bids to repair rooms at two additional buildings if needed. The total contract value is estimated between $250,000 and $500,000, and work must be completed within 180 days of award with a 30-day extension possible for optional work. The small business set-aside requires at least 15% of work be performed by the prime contractor's own employees.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FXSB220239, Repair Lactation Rooms, Various Buildings
Questions and Answers
13 July 2022
Questions received during Project Site Visit on 29 June 2022:
O&T, B17441:
1. Lockers: Build wall and save lockers?
a. Lockers appear to be two individual sets of lockers fastened together, back-to-back. Keep locker set currently facing bench. If the back of this locker set isn’t professional in appearance, build a wall height of lockers, not to ceiling height.
Paint/finish wall to match.
2. Any sight lines that should be considered?
a. None. The wall outside of new bathroom, door swing, and locker set will provide proper privacy.
Hangar 11, B16430:
1. Does the ceiling need to have a hard lid?
a. No
2. Do walls need to be built all the way to the deck?
a. No
Hangar 10, B15455:
1. Between women and men’s wall is it void or is there something behind the wall?
a. See updated SOW. Wall is no longer being moved. If need to see as-builts, come to building 7252 to see plans.
AMC, B16468:
1. Lactation Room way ahead:
a. See updated SOW.